Tariff Change Recommendations to the Commercial Practices Committee From the Regional Tariff Working Group.

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

Parallel Flow Visualization/Mitigation Proposal
1 WECC/AESO Membership and Coordinating Operating Agreement WECC Board of Directors Meeting December 2007 Diana Pommen Director Interjurisdictional Affairs.
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
WECC Section 4.9 Review Completion on Time and Under Budget April 21, 2006 Bill Chamberlain Governance and Nominating Committee Has-Been Chair.
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Western Electricity Coordinating Council Market Interface Committee Report to the WECC Board of Directors December 6-7, 2007 Robert D. Schwermann MIC Chair.
BAL-002-WECC-1 Contingency Reserves
Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.
Presented to the WECC MIC June 15, 2007
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
Brenda Ambrosi ISAS Chair OC Update August 2012 Salt Lake City, UT.
DG Interconnection Working Group Fees and Cost Support for DG Interconnections August 6, 2012.
Notification To Construct Business Practice (NTC BP) Overview Terri Gallup, PCWG Chair Paul Suskie, SPP.
Cost Ranges for the Development and Operation of a Day One Regional Transmission Organization PL
STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
Federal Energy Regulatory Commission Large Generator Interconnection Order on Rehearing (Order No A) RM March 3, 2004.
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
WELCOME Western Area Power Administration1. Where did the journey begin? Western Area Power Administration2.
OASIS Subcommittee Status EC Meeting 2/18/14. Preemption and Competition Annual Plan Items Affected 2013 AP Item 2(a) Develop version 2 business practice.
EC Meeting 2/24/ AP Item 7(b) Modify NAESB standards WEQ , WEQ , and related standards to be consistent with the Commission’s policy.
SPP.org 11. SPP Delivery Point Addition (DPA) Process Effective May 1, 2010.
What’s New in Southern Companies’ OATT Southern Company Transmission 2008 Customer Forum.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
The Midwest Independent Transmission System Operator, Inc. An update By Jim Torgerson President and CEO Midwest Independent Transmission System Operator,
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Entity Registration Under EPAct 2005 Public Power Council April 6, 2006 Louise McCarren Chief Executive Officer WECC.
Governance and Legal Issues Margaret Uhlig Pemberton General Counsel and Corporate Secretary Media Day Austin, Texas September 13, 2001.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
NERC Data Collection & Coordination. Rules of Procedure: Section 1600 Overview  NERC’s authority to issue a mandatory data request in the U.S. is contained.
Small Generation Interconnection Standards - IOU Dennis Reed Westar Energy Topeka, KS September 26, 2007.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Thursday, May 13th, :00 to 3:00 p.m. EDT.
2014 Calendar Year Customer Survey Results. Background Open for comment February 12, 2015 through March 31, 2015 for evaluation of prior year – 21 close.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Tuesday, April 21, :00 to 3:00 p.m. EDT.
1 Interconnection Update Jay Zimmerman Manager, Transmission Policy Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Parallel Flow Visualization Project NERC ORS Meeting May 4, 2011.
Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph.
Updated 1/28/2011. Cost Allocations and Affordability of Tariffs March 8, 2011 Jay Caspary ·
Electronic Scheduling /Information Technology Subcommittees (ESS/ITS) Update 2008 Review November 4, 2008.
E-Tag Notification Assignment NAESB OS Sep 17-19, 2013 Seattle, WA Assignee – Robin Cross Seattle City Light Interested Resources: Marie Pompel - BPA Power.
Updated 1/28/2011.
Transmission Congestion Management – IDC Granularity Option 3A Larry Kezele and Jeff Norman June 28, 2005 NERC/NAESB TLR Subcommittee.
Standards Review Subcommittee Update August 17, 2010.
Tariff Change Recommendations to the Commercial Practices Committee From the Regional Tariff Working Group April 9, 2001.
1 WSPP EC SLIDES FOR AGENDA ITEMS 3 AND 4 WSPP SERVICE SCHEDULE C WSPP Service Schedule C includes a provision allowing interruption “to meet Seller’s.
Overview of the Grid Clean Power Plan and Tribes October 15, 2015 webinar.
1.
SAR 001 DT Presentation Texas RE Presentation to SAR-001 Drafting Team Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity.
Tariff Changes Proposed by Integrated System (IS) 2/20/2014 Carl A. Monroe EXEC VP & COO.
The Electric Reliability Organization NERC’s Proposal for a Strong and Effective ERO FRCC System Operator Seminar Spring 2006.
Explanation of Revised Draft Reserves Schedule, Service Schedule D Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC
NERC vs. RTOs July 16, 2001.
Duke Energy Carolinas Quarterly Stakeholder Meeting
February 23, 2005 Floyd L. Norton IV Stephen M. Spina
T.O. Highway/Byway Recommendations
Rates & Regulatory Updates
Planning Coordinator - Gap Resolution Team (GRT)
Workshop Session 1: Overview
Mandatory Reliability Standards
Workshop Session 1: Overview
FERC Guidance – Long Term Competition
Assigned to the WEQ OASIS and WEQ OASIS/BPS Subcommittees
Two-Tier Firm Curtailment Overview
NAESB WEQ OASIS Subcommittee Report NAESB WEQ Executive Committee
Presentation transcript:

Tariff Change Recommendations to the Commercial Practices Committee From the Regional Tariff Working Group

RTWG Roster Company Representative AEP-WestMr. Dennis BethelMember (TO) Arkansas Electric CooP. Corp.Mr. Ricky Bittle Chair (TC) Coral Power TradingMr. Rick Rucker Member (TC) Dynegy Marketing and TradeMs. Kim Casey Member (TC) Empire District Elect. Co.Mr. Rick McCord Member (TO) ENRON Power Marketing, Inc.Mr. Ron McNamara Member (TC) East Texas Electric CooperativeMr. Wayne Miller Member (TC) Jonesboro City Water and LightMr. Rick HenleyMember (TC) Kansas City Power & LightMr. Ron Kite Member (TO) KPL, Western Resources, Inc.Mr. Dennis Reed Vice-Chair (TO) Missouri Public Svc. Comm.Mr. Mike Proctor Member OG+E Electric ServicesMr. John Gunesch Jr.Member (TO) Oklahoma Municipal Power Mr. Gene Anderson Member (TC) Southwest Power PoolMr. Pat Bourne Secretary Southwestern Power Admin.Mr. James Sherwood Member (TO) Southwestern Public Service Co.Mr. David Grover Member (TO) Tenaska Power Services Co.Mr. Mark Foreman Member (TC) Western Farmers ElectricMr. Gary Roulet Member (TO)

Recommended Changes  Revise Attachment P – Timing Requirements for Reservations & Schedules  Incorporate NERC Next-Hour-Market Provisions  Include new Attachment Y – Flexible Use Transmission Service (Experimental)  Revise Scheduling Penalty Provisions -(Sec. 13.7)  Revise NERC TLR Procedures  Revise Sections 2.2 and 22 – Reservation Priority and Right of First Refusal

Revise Attachment P  Background –Attachment P Timing Specifications are not compliant with FERC Order 638 –Although present Attachment P specifications may be arguably better than Order 638 specifications, standardization with adjoining Transmission Providers was viewed to be the greater good  Recommendation –Approve the revisions which reflect compliance

Include Next-Hour-Market Provisions  Background –NERC has proposed tariff modifications which have been approved by the FERC  Recommendation –Approve incorporation of the FERC approved language into the SPP OATT to Facilitate Next- Hour-Market activities

Add New Attachment Y  Background –The EOC has approved a phased implementation of the proposal to increase transmission system utilization –The proposed new Attachment Y provides for a one-year experimental implementation of the first phase  Recommendation –Approve the addition of Attachment Y to the SPP OATT

Scheduling Penalty Change  Background –The proposed change reduces the penalty to 200% of actual excess use –SPP scheduling software has been modified to reject tags that are in excess of the corresponding reservation  Recommendation –Approve the proposed revisions to Sec. 13.7

Revise TLR Procedures  Background –NERC has revised its TLR Procedures –NERC has recently revised its IDC to implement the new procedures –Procedures included in the SPP OATT as Attachment R require replacement  Recommendation –Approve a revision to Attachment R which states that currently effective NERC TLR Procedures are incorporated by reference

Sections 2.2 and 22 ROFR Issues  Background –ROFR issues discussed extensively at the RTWG –These revisions clarify the rights and obligations of both incumbent and new customers

Sections 2.2 ROFR Issues Change Time Frame to Respond to a competing request –Notify Both there is a competing Request –System Impact Study –Current User with ROFR must respond within 60 days of notification of a contingent service agreement –Customer given reservation pays for System Impact Study, If competing request is awarded any service it pays

Sections 22 ROFR Issues Clarify that requesting a change in path for an existing firm transmission reservation with remaining term of less than 1 year does not have ROFR –Treated as a new request

Sections 2.2 and 22 ROFR Issues  Recommendation –Approve the proposed revisions to Sec.2.2 and Sec. 22

Ongoing Consideration of Major Issues  Tariff modifications for state retail restructuring programs  Pro Forma Generation Interconnection Agreement  Consistent standards for rate basing transmission facilities  Ultimate rate design for SPP Tariff