FP420 Meeting - 13 September 2007 Beniamino Di Girolamo - CERN PH Telescope, installation and beam area B. Di Girolamo CERN.

Slides:



Advertisements
Similar presentations
D. Elia, INFN BariALICE Offline Week - June Recent results from SPD beam test D. Elia, R. Santoro INFN Bari ALICE Collaboration - SPD Group.
Advertisements

Muon g-2 and SLAC Detector Test T-519 Momentu m Spin e David Hertzog University of Washington.
MTest Facility Low Energy Beam Erik Ramberg AEM 15 October, 2007.
Micromegas detectors for the CLAS12 central tracker Brahim Moreno (for the Saclay group) CLAS12 technical workshop 03/17/ 2010 Jefferson lab Update on.
Some beam tuning musings from Fall 2004 runs David Hertzog.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
PID, trigger and DAQ for the GLAST beam test (preliminary study) Nicola Mazziotta INFN Bari Dec. 6, 2005.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
RICH 17 m Beam Pipe Mirrors Separate pions from muons
Status and Future of Fermilab Test Beam Facility Erik Ramberg LCWS07 Performance of New Beamline Tracking, Cerenkov and TOF CALICE and MINERVA tests Potential.
Recent Activity at the Upgraded Test Beam Facility Erik Ramberg AEM 16 April, 2007 Open House and ILC Workshop New Test Beamline Layout and Performance.
MC_ Muon Beam Lines 8/3/06 Want a  beam of ~300MeV/c –This requires a  beam of ~300 MeV/c Possible Sources: SY Proton Beam line components removed.
N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans.
Calibration, simulation and test-beam characterisation of Timepix hybrid-pixel readout assemblies with ultra-thin sensors International Workshop on Future.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
Update on Ongoing Tungsten Digital HCAL Beam Tests Erik van der Kraaij CERN LCD.
TEST BEAM 2007 Dates, Facilities, Safety Cinzia Some key slides from Beniamino Di Girolamo CERN.
DE/dx measurement with Phobos Si-pad detectors - very first impressions (H.P Oct )
Experimental Setup of the H8-RD22 Experiment Massimiliano Fiorini (on behalf of the H8-RD22 Collaboration) University of Ferrara – INFN Ferrara CARE HHH.
Laser Status Update J. Moody, E. Oz, P. Muggli MPP Future Accelerators AWAKE Collaboration
1 Tungsten supply and assembly, test beam setup Market survey on tungsten supply Ideas on the frame design Experimental area Test beam setup Wolfgang Klempt/
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Micromegas modules Towards the 7 module test. Micromegas panels Phase I: ‘Large Prototype’ Micromegas modules were built and tested in beam ( ):
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
The Meson Test Beam Facility Erik Ramberg LRP Meeting – Oct. 30,2003 Delivering MI beam to MTBF User area layout Operational characteristics Detectors.
RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.
Fast Timing Mtg April 15 th 2009 Mike Albrow Fast Timing studies at Fermilab : Test beam plans notes from meeting April 15 th 2009 MTest May Wed 27 th.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
Update for muon studies Helmut Vincke. Additional dump calculations Two options were studied: Option 1: beam is bend by 2 degree towards soil and beam.
The NA62 rare kaon decay experiment Photon Veto System Vito Palladino for NA62 Coll.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Activation around dump shielding, and design of beam line mask Mathieu Baudin, RP Genevieve Steele, EN-STI Helmut Vincke, RP.
The experimental setup of Test Beam HE EE ES BEAM  A slice of the CMS calorimter was tested during summer of 2007 at the H2 test beam area at CERN with.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
November 15-18, 2002V. Obraztsov - Prague ECFA/DESY Workshop 1 Proposal for TESLA beam test zone at IHEP ( Protvino ) Vladimir Obraztsov Institute for.
SANE Collaboration ( E07-003) Anusha Liyanage Hampton University January 12, 2010 Measurement Of the Proton Form Factor Ratio at High Q 2 by Using The.
1 CERN 2007 Installation and Run Plan Erika Garutti & Fabrizio Salvatore.
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
1 Suggestions to 2006 LAT prototype beam test plan Alex Moiseev, NASA/GSFC.
1 The Discussions of the Installation Procedures of Scibar Fiber, PMT, CLR(Gain Monitor), Lower Service Floor & Others Edward Chi June 02, 2006 Fermilab/PPD/MD.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
Joint LHC Machine-Experiments Workshop on Very Forward Detectors - 25 January 2007 Beniamino Di Girolamo - CERN PH ATLAS Roman Pots status, commissioning.
Status Report Beam Working Group 31 January 2007 Presented by L.Gatignon  Revised beam design  Requests to AB department for 2007.
Panja Luukka. Silicon Beam Telescope (SiBT) Group Since 2007 a collaboration of several CMS institutes has been operating a silicon micro-strip beam telescope.
GSI Test Preparation Visit to GSI october 12 Installation plan agreed
Test beam results of MCz-Si detectors
Test Beam Request for the Semi-Digital Hadronic Calorimeter
High-Resolution Micromegas Telescope for Pion- and Muon-Tracking
RD51-WG X June test beam experience: useful information for October
HERD Prototype Beam Test
Preparation for CERN test beam
IHEP group Shashlyk activity towards TDR
DAMPE Status (T9) Steadily taking data since last Thursday
F.Guber, A.Ivashkin INR, Moscow
LHCf – CSN1 Trieste O. Adriani

Installation and Run Plan
Use of Beam Loss Monitor type detectors in CNGS muon station
in a high intensity beam
A summary of world-wide test beam facilities
Spot-Size Reduction 4/5/2017.
JLEIC High-Energy Ion IR Design: Options and Performance
Presentation transcript:

FP420 Meeting - 13 September 2007 Beniamino Di Girolamo - CERN PH Telescope, installation and beam area B. Di Girolamo CERN

FP420 Meeting - 13 September 2007 Beniamino Di Girolamo - CERN PH Telescope  BAT telescope: 4 working modules oUsed until a week ago on H6 beam line by RD42 test beam oTwo modules need some additional tuning to remove some chip-to-chip edge effects That can affect slightly the resolution in some zone over the surface Tuning is simple, just need to find time to do it oAll hardware has to stay in the beam area All power supplies and the control and daq pc –Length of cables cannot exceed certain limits –SCSI-like type of bus: not meant for long distances oTwo options for module positioning on the table See later

FP420 Meeting - 13 September 2007 Beniamino Di Girolamo - CERN PH Installation  One marble table oFor telescope mounting and DUTs  Second marble table oIn case the first one is not enough the beam pipe setup is quite long  Issues when using two tables oAlignment: we can have surveyors and align everything Shimming to be foreseen oDue to limitation in allowable cable length, telescope has to stay on one table Divergence of the beam to be limited by –Veto counter –Thin counter Both counters to be put downstream of the setup (veto could be put upstream)

FP420 Meeting - 13 September 2007 Beniamino Di Girolamo - CERN PH Main marble table  160 x 50 cm  Holes pitch = 2.5”  1 x-y assembly  1 rotation assembly can be mounted on x-y one  2 kind of brackets to hold telescope modules  1 of the above brackets can be used to hold sci-counters

FP420 Meeting - 13 September 2007 Beniamino Di Girolamo - CERN PH

FP420 Meeting - 13 September 2007 Beniamino Di Girolamo - CERN PH

FP420 Meeting - 13 September 2007 Beniamino Di Girolamo - CERN PH When to install and run  Installation start: Oct 10th at 8:00  Beam stop: Oct 16th at 8:00  Table with telescope and possible DUTs can stay until: Friday 26th 14:00 oInterest to use also by Muon people  Table and telescope will then be in H6 until Monday November 12th

FP420 Meeting - 13 September 2007 Beniamino Di Girolamo - CERN PH H8 Beam area

FP420 Meeting - 13 September 2007 Beniamino Di Girolamo - CERN PH Beam characteristics  180 GeV/c, positive polarity  Secondary beam: under mm beam spot oTertiary beams with good rate down to 50 GeV o20 and 10 GeV possible, rate is low  The H8 line can have beams in the ranges: o1-9 GeV o10-20 GeV o GeV oUp to 300 GeV  Pions, muons and electrons oAt high energy relevant proton contamination oGoing lower in energy pions and electrons beams contaminate each other, especially with positive polarity