Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.

Slides:



Advertisements
Similar presentations
Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
Advertisements

News from B180: DC-DC Stavelet with HV MUX One hybrid shows ~20ENC extra noise, others much the same. Not yet understood - investigations continue Carlos.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
A vertical-flexure CCD module Bruce C. Bigelow University of Michigan Department of Physics 10/7/04.
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
L. Greiner1HFT Hardware 09/23/2010 STAR Vertex-6 based PXL RDO board Design concept and items for discussion.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
Status Update on Mechanical Prototype in Rome November 6,
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,
1 Module and stave interconnect Rev. sept. 29/08.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.

Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
ZTF Interconnecting Scheme Stephen Kaye
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
Choosing the right preamplifier/discriminator comparing advantages and drawbacks : NL-277-L (Nanometrics), ASD-8 (Cern) and MAD4 (INFN Italy) Our favorite:
Dimensions of the PDM frame: 167mm x 167mm x 28.7mm.
Hybrid Integrated Circuit
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
1 Physics of Compressed Baryonic Matter 12 th CBM Collaboration Meeting R&D ON MICRO-CABLES FOR BABY SENSOR RADIATION TEST MODULE October , 2008.
, T. Tischler, CBM Collaboration Meeting, GSI Status MVD demonstrator: mechanics & integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.
ADT490 TroubleShooting Locating Opens. 2 Power Supply Grounding Power Supply has circuit -> allows positive & negative outputs to float relative to ground.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
Lesson No. 07 Week No. 04 Lesson Name Hacksaw Frame & Blade.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
Low Mass Rui de Oliveira (CERN) July
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
IPC In-Circuit Test Fixtures In-circuit test fixtures are commonly called bed-of-nails fixtures. A bed-of- nails fixture is a device with.
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
1 PFDPU Mechanical Packaging PEER REVIEW MAVEN PFDPU Particle and Fields Data Processing Unit Mechanical Packaging and Design Overview May 09, 2011 Bill.
1 Jim Thomas - LBL Sector Tools – a conversation with Jon Wirth and Eric Anderssen August 28 th, 2015.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Integration of the MVD Demonstrator S. Amar-Youcef, A. Büdenbender, M. Deveaux, D. Doering, J. Heuser, I. Fröhlich, J. Michel, C. Müntz, C. Schrader, S.
7 october 20111T. Schneider Test bench for digital sensor New Philips Digital Light Sensor Outer dimensions 32.6*32.6mm 2 8*8 pixel array Pixel pitch 4*4mm.
15th January 2014 WP4 Meeting Oxford1 EoS PCB Mike Dawson University of Oxford.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Specifications Asic description Constraints Interface with PDM board Planning Summary.
2 March 2012Mauro Citterio - SVT Phone meeting1 Peripheral Electronics Some updates Mauro Citterio INFN Milano.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
Berkeley status Aug 10th, 2012.
FED Front Panel Hole Size Problem
SVD Electronics Constraints
The workflow of module assembly for the CBM Silicon Tracking System
ATLAS pixel module assembly flow
T. Bowcock University of Liverpool
Update on Pavia MM mechanical prototype
Enrique Calvo Alamillo DAEGU
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Hybrid Issues.
ob-fpc: Flexible printed circuits for the alice tracker
Gluing jigs for Demonstrator
SIT AND FTD DESIGN FOR ILD
General wiring procedure for a new instrument
Pixel module assembly tooling
Presentation transcript:

Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure for the ring counters, namely Bernie’s proposal for the spectrometer in October of last year: A “single-hybrid - single sensor” module layout: –each module would consist of one hybrid –one ring sensor is glued to one hybrid directly –the modules are mounted on the support frame individually –the modules are chained in the readout with short cable going from one module to the next one.

My personal Pro’s/Con’s of a single-hybrid/sensor module The positive side of this module layout: –the module assembly would be very simple (and less risky). –the bonding of sensor to hybrid is simple –Each module is a “self-sufficient” unit, which can easily be replace on the ring in case of problems (we –In a failure during assembly or operation we would loose only one sensor and a hybrid without risking working sensors. –We have a lot of flexibility of grouping modules in the readout. The negative side: –modules are chained externally with short (9cm) ribbon cables

My “guide-lines” for this layout Position and acceptance of the sensors are not changed A 1 mm clearance between sensors is always maintained The hybrid is as similar as possible to the Octagon hybrid and can be done on PCB’s The modules fit into the existing mechanics The cable length is minimized The readout can be done in groups of 2, 4, or 8 modules in a string.

The module layout Single ring counter sensor cut straight along bond pad side PCB hybrid with original octagon layout and line routing Cable input connector Cable output connector to next module Space for line routing input to output connector Aluminum mounting plate Mounting holes Sensor glued along front side of hybrid

One Half-Ring First module Forth module in readout Readout cable IN Flat ribbon interconnection cable Support ring supporting individual modules 1mm clearance

A possible assembly scheme? Hybrids are glued to Aluminum support plate. Alignment is done by aligning the mounting holes in hybrid and Al plate or via reference marks Chips are glue and bonded; hybrid is tested Sensor is glued to the hybrid: –hybrid is positioned with pins in the mounting holes on a base-board –The sensor is supported on the baseboard (via vacuum) and aligned by two micrometer screws –Sensor is removed from base board; conductive and non-conductive glue applied to the hybrid edge –sensor is place in original position

Hybrid and sensor gluing Support area for the sensor on the hybrid (cross-section)