User support and requirements capturing processes Geant4 Collaboration organization, management and communication review November 9 th, 2012 Marc Verderi.

Slides:



Advertisements
Similar presentations
Web100 User Services Support Team: Tanya Brethour, Jim Ferguson, Steve Engelhardt
Advertisements

EleUM (Electronic Learning Environment Universiteit Maastricht)
INTRODUCTION TO THE VIRTUAL PLATFORM OF THE AFRICAN FORUM FOR AGRICULTURAL ADVISORY SERVICES (AFAAS)
Using technology to support professional development in secondary transition: A look into the Vermont model. Using technology to support professional development.
Sage ACT! Sage ACT! Overview #1 contact and customer management choice of small businesses and sales teams. Designed for professionals who rely.
© 2012 Ariba, Inc. All rights reserved. Ariba Network Best Practices Defining the Buyer Compliance Policy Leigh Tangretti, Director Network Services.
An Overview. BizLink BizLink is a Social Networking platform for business. It allows colleagues to come together, ask questions, share resources, form.
Project Management and Communication Represented by: Latifa Jaber Al-Ghafran.
Feb. 2, 2004CS WPI1 CS 509 Design of Software Systems Lecture #3 Monday, Feb. 2, 2004.
MENTORING THE TRAINEE MARINE ENGINEER A Programme of the Institute of Marine Engineers (I) for Student Members.
Geant4 Documentation and User Support Geant4 Users Workshop February 2002 Dennis Wright (SLAC)
ETutoring at the University of York Ian Cole Copyright © ijc2005.
Software Configuration Management
1-2 Training of Process FacilitatorsTraining of Coordinators 3-1.
Introduction to Web-Based Repository for Software Testing Tools (WReSTT) 03/16/2009 Florida International University WISTPC 2009 Peter J. Clarke.
| See the possibilities… Customer Relationship Management Overview Fusion 08 Matt Resong.
BC Yukon Technical Support Network BC & Yukon Technical Support Network Welcome.
Release & Deployment ITIL Version 3
IAEA International Atomic Energy Agency EPR-Public Communications L-011 Good Practices for PIOs.
1 Using Technology in ELI Emerging Leaders Institute 2000.
© 2014 Blackboard Inc. All rights reserved.. Describe the different tools that can be used to keep students informed. Announcements Course Messages.
Integration of Service Channels Strategies for Success Iain McKellar, Director, Advisory Services Division.
Leadership for Student Success through After School Programs Presented by: California County Superintendents Educational Services Association with the.
Your User Name is the first portion of your Carleton Connect account eg. mroger4 if the was n.ca
Communication in the ARC network The cornerstone of the network “Communication in the ARC network”, ARC network review, January 14-15, 2015, ESO-Garching.
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Learners May 2006.
Board of Canadian Registered Safety Professionals Certification Maintenance Online Tool BCRSP introduces a new web-based tool to assist certificate holders.
Models of Online Learning – Identifying Components Week 3 Introduction to Web-Based Mentoring and Distance Education.
Welcome to corporate.eircom.ie This presentation aims to give you an overview of corporate.eircom.ie, what it offers you and how best to navigate your.
MyFloridaMarketPlace Roundtable January 21, :00 a.m. – 12:00 p.m. MyFloridaMarketPlace.
Internet Based Distance Education at the HAS Bratislava, February, 7th-9th
Certificate IV in Project Management Course Structure Course Number Qualification Code BSB41507.
Getting Involved in the Research Data Alliance Stefanie Kethers
Lead Management Tool Partner User Guide March 15, 2013
How to register your team and log their steps Training slides for team captains.
In support of Leveraging the Power of ManagePro in Meetings All services provided by Performance Solutions Technology, LLC PH. (707)
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Users December 2009.
A Short Course on Geant4 Simulation Toolkit How to learn more?
Text #ICANN51 GAC / GNSO Joint Meeting 12 October 2014.
Users workshops, publications, presentations and HyperNews Makoto Asai (SLAC) 10/Oct/2002 Geant4 delta-review.
Introducing… the Sustainable Energy 4 All Action Accelerator! Adam Cooper Senior Manager, Accenture Sustainability Services United Nations Global Compact.
® Incentive Programs New Functionality December 6, 2010.
Meeting Goals Makoto Asai and Marc Verderi 2010 Geant4 Collaboration ESA/ESTEC.
Mtivity Client Support System Quick start guide. Mtivity Client Support System We are very pleased to announce the launch of a new Client Support System.
1 Local Readiness Team Lead Meeting June 6, 2007.
Connect. Communicate. Collaborate Click to edit Master title style PERT OPERATIONS.
Meeting goals Makoto Asai and Marc Verderi 2013 Geant4 Collaboration Meeting Seville, Spain.
Payroll Management System
Closing remarks Makoto Asai and Marc Verderi 2012 Geant4 Collaboration Meeting Chartres.
Session 25 COD Customer Service. 1 Customer Service  Agenda -Customer Service Overview -Statistics -Current Initiatives -COD Issues.
Maria Grazia Pia, INFN Genova and CERN1 Geant4 highlights of relevance for medical physics applications Maria Grazia Pia INFN Genova and CERN.
0/8 HyperNews for ATLAS Status and expectations Applications Area meeting, February 1, 2006 Traudl Kozanecki.
Geant4 Training 2003 A Short Course on Geant4 Simulation Toolkit How to learn more? The full set of lecture notes of this Geant4.
Before we get started… A copy of today’s webinar slides will be posted to During the webinar, participants.
IIS Project and Contact Management Systems (CMS): An Efficient Comprehensive Management Approach to IIS Recruitment, Training and EHR Integration IIS Community.
SEG Technical Standards Committee Meeting EAGE Conference Vienna 2011 Wednesday May 25, 2011.
1 Using Technology in ELI Emerging Leaders Institute 2000.
19-23 Nov, h Geant4 Collaboration SLAC Koichi Murakami KEK/CRC.
Company Confidential Americas Aerospace Quality Standards Committee (AAQSC) Private Web Based on SAE Standard Works September 28, 2015 The.
1 Transnational Partner Search Toolkit Transnationality Contact Points Meeting 30 September Warsaw.
Developers Users Committers How do I configure this now? Just one more fix and I am done! CVS Download/Use Software Submit problems/ request features Store.
A Short Course on Geant4 Simulation Toolkit How to learn more?
Getting Started: BCeID Sign Up
Unit4 Partner Portal for Case Creator
This video will walk you though the process of registering for additional workshops if you have registered for any HR workshops in the past using the CVENT.
A Short Course on Geant4 Simulation Toolkit How to learn more?
A Short Course on Geant4 Simulation Toolkit How to learn more?
User Support, User Requirements
Presentation transcript:

User support and requirements capturing processes Geant4 Collaboration organization, management and communication review November 9 th, 2012 Marc Verderi LLR, Ecole polytechnique

09/11/2012Marc Verderi, LLR Ecole polytechnique, Geant4 Review Introduction User support and requirements capturing processes are the most important communication aspects with users. User support: Response to bugs & questions, announcements, tutorials, etc. Requirements capturing: Response to missing functionalities This communication has to deal with challenges: Users’ community is large And keeps growing Users’ community is diverse High energy, nuclear, accelerator, medical, space… With a diversity which is itself growing with a trend on simulating more media response: relaxation, phonon, electron- hole drifting, activation, etc. The Collaboration has set up various communication channels and tools, presented here, to help with communication with users.

09/11/2012Marc Verderi, LLR Ecole polytechnique, Geant4 Review Overview of user support and requirements capturing channels User support and requirements capturing rely on various channels: Fora: Technical Forum HyperNews forum Tools: Announcement mailing list Bug reporting system Requirements tracking system Workshops and tutorials: Users workshops and meetings Geant4 tutorials Liaisons Daily communications

CHANNELS FOR USER SUPPORT AND REQUIREMENTS CAPTURING

09/11/2012Marc Verderi, LLR Ecole polytechnique, Geant4 Review Technical Forum One of the most important and efficient ways of communication between users and Geant4 developers. Allows for detailed discussions on problem findings and on requirements. Typical agenda is: I.Geant4 collaborators presentations: I.Release and/or patch announcements II.Update on requirements III.Possibly, detailed responses to problems II.Users presentations Items (requirements or problems) are discussed during the meetings To understand first if a solution is currently available If not, item is taken on board to be further examined by Geant4 If needed, liaison is created between requesters and Geant4 Requirements are addressed, depending on criticality and resources

HyperNews Forum Web-based discussion forum: edu/HyperNews/geant4/cindex edu/HyperNews/geant4/cindex Currently has 27 discussion threads corresponding to either Geant4 modules or application domains. Access: Reading is public Posting and receiving s require minimal registration name, address and institution At present, 2540 such registrants Moderation is minimal Only 2 problems in 10 years Experienced users are encouraged to answering to novice/trivial questions. Often a place to initiate bug reports. A copious open exchange medium, on a continuous communication mode basis. 09/11/2012Marc Verderi, LLR Ecole polytechnique, Geant4 Review

09/11/2012Marc Verderi, LLR Ecole polytechnique, Geant4 Review Communication Tools Requirements tracking system JIRA-based system to track major requirements JIRA system for Geant4 launched about two years ago Agreed major requirements are entered to JIRA Read access is public To allow users to follow progress on requirements. Bug reporting system Bugzilla-based bug report tracking system. 4&query_format=specific&order=bug_id%20DESC&query_based_on= 4&query_format=specific&order=bug_id%20DESC&query_based_on When a user identifies a problem, he/she creates a bug report. Status of each ticket tracked and recorded on the Bugzilla system and made visible to the public Announcement mailing list Registered users receive announcement s Inform on patch or Beta releases, user workshops and tutorials Currently 550 registrants on the mailing list. Past announcements can be consulted for users having a CERN afs account.

09/11/2012Marc Verderi, LLR Ecole polytechnique, Geant4 Review Users Workshop and Meetings Collaboration committed to user workshops and meetings For example: Geant4 Space Users workshop This 9th G4SUW pages are still under construction G4NAMU (Geant4 North American Medical Users organization) Past events of relevance for Geant4 can be found at:

09/11/2012Marc Verderi, LLR Ecole polytechnique, Geant4 Review Geant4 tutorials Geant4 tutorials held several times each year at many different locations and/or targeted audiences. Tutorials are at the initiatives of Geant4 Collaborators, or of users’ communities, etc. Last tutorial organized last week, in Korea, by KISTI and NCC. 5 tutorials in 2012, 8 in 2011, 4 in 2009, etc. Tutorial opportunities are announced on the Geant4 announcement mailing list and posted on the Collaboration web page. Past tutorials and training material are available at: Tutorial presentations and material remain publicly available for some time, so that new users who could not attend at a tutorial may also benefit.

09/11/2012Marc Verderi, LLR Ecole polytechnique, Geant4 Review Liaison and daily communications Liaisons Liaisons appointed to major user groups. Participate to user groups meeting, capture their requirements and inform our developments. Existing current liaisons to ATLAS, CMS, LHCb, ALICE and GATE. Past liaisons to BaBar and HARP. Collaboration has also direct contacts with several other experiments: CALICE, ILC, Mu2e, CDMS, Belle-2, GERDA, etc. Daily communications Each collaborator has also local communications with their local users for day-to-day assistance and private communications with users.

PROCESSES FOR USER SUPPORT AND REQUIREMENTS CAPTURING

09/11/2012Marc Verderi, LLR Ecole polytechnique, Geant4 Review Processes for Bug Reports and Requirements Previous channels help in capturing Bug Reports and Requirements. Once captured, they have to be confirmed first: This is done after further examination of the related WG coordinator(s) This is done under the legitimacy hat of the Steering Board Confirmed Bug reports are then: Signaled as such in Bugzilla Assigned to a developer, who becomes responsible for fixing the problem Weekly reminder is sent to related developers Open bug report progress are examined at each Steering Board meeting Confirmed User Requirements They may not always be addressed, if resources do not permit In such a case, attempt to obtain expertise or resources are made In other case, requirements are: Simply assigned to a WG, if scope is limited to it Or to several WGs, with coordination of the Steering Board and Architecture Team if needed Progress on open requirements are examined at each Steering Board