LARP Accelerator Systems 6-Year Plan FY09-FY14 10 April 2009 LARP CM12 Napa, CA Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research.

Slides:



Advertisements
Similar presentations
July 7, 2008SLAC Annual Program ReviewPage 1/23 LHC Accelerator Research at SLAC T. Markiewicz SLAC Department Head (9/2008) LARP Accelerator Systems Division.
Advertisements

The 2nd Tevatron Electron Lens and tests of a new electron gun in the framework of Beam-Beam Compensation project Yu. Alexahin, V. Kamerdzhiev, G. Kuznetsov,
Gaussian TEL gun progress V. Kamerdzhiev, G. Kuznetsov, V. Shiltsev LARP Collaboration Meeting 10 Danfords on the Sound, Port Jefferson, NY, April 23-25,
30 min DCI Hall, LAL Orsay October 2010
LARP Accelerator Systems : “home work” Vladimir Shiltsev bnl - fnal- lbnl - slac US LHC Accelerator Research Program.
T-980 Crystal Collimation Recent Results T-980 Collaboration: FNAL, SLAC, BNL, CERN, PNPI, IHEP, INFN D. Still CM14 April 27, 2010.
Eric Prebys LARP Program Director 1/8/09.  Background  Summary of review findings  Partial response  Coordination with CERN  New initiatives  Lumi.
Eric Prebys LARP Program Director Jaunary 14, 2009.
 Guidance from DOE  $13M with a 6 month continuing resolution at 84%.5*.84*13+.5*13 = $11.96M  Separate money ($1-2M) found for APL planning!  General.
BROOKHAVEN SCIENCE ASSOCIATES Peter Bond Deputy Director for Science and Technology October 29, 2005 New Frontiers at RHIC Workshop.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) February 16, 2010.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Alexei Fedotov Project Management.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Long-range and head-on beam-beam compensation studies at RHIC with lessons for the LHC W. Fischer, N. Abreu, R. Calaga, Y. Luo, C. Montag, G. Robert-Demolaize.
Ralph Assmann What Do We Want To Measure (in 2009) R. Assmann S. Redaelli, V. Previtali CERN/BE discussed with W. Scandale CERN/EN26/3/2009CC09  See also.
Eric Prebys LARP Program Director 4/8/09.  All meetings will take place in Chardonnay room (partitioned for parallel sessions).  Wireless available.
LARP Accelerator Physics 19 June 2008 LARP+LAUC DOE Review, LBNL Wolfram Fischer/BNL BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
Director’s Review 5/5/03 Spalding DRAFT RLS 1 Project Planning  Documentation to DOE June 1  DOE Review ~July 22 Documents Summary Project Overview,
Eric Prebys LARP Program Director 7/13/09.  Background  Summary of findings from last review  Partial response  Coordination with CERN  New initiatives.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Summary of Accelerator Systems New Initiatives Parallel Session 19 October 2007 LARP CM#9 - SLAC Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator.
1 RHIC Run-15 p-p Head-on beam-beam compensation Wolfram Fischer, Xiaofeng Gu (liaison physicist), S.M. White, Z. Altinbas, D. Bruno, M. Costanzo, J. Hock,
Scattered electrons as possible probes for beam halo diagnostics. P. Thieberger, C. Chasman, W. Fischer, D. Gassner, X. Gu, M. Minty, A. Pikin Speculations.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
J. Strait Fermilab 16 October 2006 Consideration on LHC upgrade from A US perspective.
October 4-5, Overview of ARRA funded AIPs at C-AD Wolfram Fischer October 4, 2010.
F LHC Accelerator Research Program Accelerator Systems Tanaji Sen FNAL/APC  Project management  Accelerator Physics  Instrumentation  Beam commissioning.
CERN Phase II Collimation Conceptual Review Summary 09 April 2009 LARP CM12 Napa, CA Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research.
LARP Accelerator Systems Status & Plans 13 July 2009 DOE Review, FNAL Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
View From CERN Summary of Upgrade Projects:  Phase 1 IR upgrade: construction project  LINAC4: construction project  Phase 2 collimation: design finalization.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
LHC Commissioning & Upgrades LHC Commissioning & Upgrades as part of LARP Accelerator Systems Vladimir Shiltsev FNAL/AD bnl - fnal- lbnl - slac US LHC.
Vladimir Shiltsev Considerations on Beam-Beam Compensation with Electron Lenses in LHC April 27, 2006.
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
LARP Accelerator Systems Status, Plans, Questions 14 January 2009 CERN-US Meeting, CERN Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
SLAC Accelerator Development Program Tor Raubenheimer OHEP Accelerator Development Review January 24-26, 2011.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Joint IR Studies: Operating Margins Nikolai Mokhov Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program LARP Collaboration Meeting SLAC.
Status of Head-on Beam-Beam Compensation BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program A. Valishev, FNAL 09 April 2009 LARP CM12.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
Eric Prebys LARP Program Director January 14, 2009.
Beam Instrumentation and Diagnostics for BBLR tests in LHC & commissioning in HL-LHC Rhodri Jones (CERN Beam Instrumentation Group) 4 th Joint HiLumi LHC-LARP.
LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC Status Report E. Harms 28 March 2006.
4/27/06 1 US LHC ACCELERATOR RESEARCH PROGRAM brookhaven - fermilab – berkeley - slac US LARP Inner Triplet Cryogenics and Heat Transfer LARP Collaboration.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
U.S. Activities on the High-Luminosity LHC: LARP Sustainability & Evolution as a Construction Project HiLumi-LARP Collaboration Meeting October 26, 2015.
LARP Accelerator Systems Status & Plans 19 June 2008 DOE Review, LBNL Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Six-dimensional weak-strong simulations of head-on compensation in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam.
BNL Overview DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson.
Eric Prebys LARP Program Director July 14, LARP FY10 and Beyond - E. Prebys 2 Guidance: LARP funding decreases $1M/yr Assume: $13 M LARP total for.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) February 4, 2011.
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
RHIC head-on beam-beam compensation with e-lens N. Abreu, W. Fischer, Y. Luo, C. Montag, G. Robert-Demolaize J. Alessi, E. Beebe, A. Pikin 1. Introduction.
Updates on Tevatron and LARP Vladimir Shiltsev FNAL/Accelerator Physics LARP/Accelerator Systems.
 Presented ongoing activities in LARP  Magnet Systems  Accelerator Systems  Program Management  Also presented plan for “spinning off” construction.
WP 4: Crab Cavity Ed Ciapala, Erk Jensen BE-RF, CERN HL-LHC Meeting, CERN, 20 Oct 2010.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) May 16, 2011.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LARP Review, June 10, 2013Magnet Cost and Schedule – M. Kaducak 1 IR Quadrupole Cost and Schedule Marc Kaducak LARP Review June 10, 2013.
Electron lens studies in support of RHIC / LHC Wolfram Fischer 28 July 2010 Fermilab Accelerator Advisory Committee Meeting.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
LARP Accelerator Systems D. Rice, J. Rosenzweig, M. White LARP 2009 review.
CRYSTAL COLLIMATION EXPERIMENT AT THE TEVATRON CSN1 LNF 17 September 2007 Walter Scandale CERN.
Adriana Rossi, Sergey Sadovich
LHC External Collimation Review
Presentation transcript:

LARP Accelerator Systems 6-Year Plan FY09-FY14 10 April 2009 LARP CM12 Napa, CA Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program

LARP CM April 2009Collimation Conceptual Review Summary - T. MarkiewiczSlide n° 2 / 25 General Comments First cut of program and budget requests without sufficient review and detail –Lab-to-lab split not specified yet –LARP-to-Non-LARP split not completely specified yet –Individuals and their FTEs not identified yet –One very coarse overhead loaded salary ($250k) used to convert LARP funded FTEs to dollars –M&S and travel requests assumed to include lab overhead Nonetheless, having something on paper is a good way to start discussion Will not discuss PS2 nor Crab but have included their totals (such as I know them as of 630 AM today) as their funds will come out of Accelerator System pot. FY09 numbers have been constructed to reflect the actual budget (before contingency allocation)

LARP CM April 2009Collimation Conceptual Review Summary - T. MarkiewiczSlide n° 3 / 25 FY09-FY14 Plan

LARP CM April 2009Collimation Conceptual Review Summary - T. MarkiewiczSlide n° 4 / 25 Accelerator Systems

LARP CM April 2009Collimation Conceptual Review Summary - T. MarkiewiczSlide n° 5 / 25 PS2

LARP CM April 2009Collimation Conceptual Review Summary - T. MarkiewiczSlide n° 6 / 25 CRAB

LARP CM April 2009Collimation Conceptual Review Summary - T. MarkiewiczSlide n° 7 / 25 Rama’s Input to this Excercise

LARP CM April 2009Collimation Conceptual Review Summary - T. MarkiewiczSlide n° 8 / 25 Rotatable Collimator Plan based on schedule shown by Assmann at April 2009 Collimation Review

LARP CM April 2009Collimation Conceptual Review Summary - T. MarkiewiczSlide n° 9 / 25 Luminosity Monitor

LARP CM April 2009Collimation Conceptual Review Summary - T. MarkiewiczSlide n° 10 / 25 “Finished” Instrumentation Tasks

LARP CM April 2009Collimation Conceptual Review Summary - T. MarkiewiczSlide n° 11 / 25 LLRF

LARP CM April 2009Collimation Conceptual Review Summary - T. MarkiewiczSlide n° 12 / 25 “New” Task: Synchrotron Light Monitor

LARP CM April 2009Collimation Conceptual Review Summary - T. MarkiewiczSlide n° 13 / 25 Another “New” Task that fell from the APUL Tree

LARP CM April 2009Collimation Conceptual Review Summary - T. MarkiewiczSlide n° 14 / 25 T980

LARP CM April 2009Collimation Conceptual Review Summary - T. MarkiewiczSlide n° 15 / 25 UA9

LARP CM April 2009Collimation Conceptual Review Summary - T. MarkiewiczSlide n° 16 / 25 Hollow E-Beam Lens as an LHC Scraper Tevatron Demonstration: –demonstrate ~1A hollow beam in DC regime with about 4 sigma of proton beam radius which goes and interacts mostly with proton halo (either at 150 or at 980 GeV) –For that we need to perform-gun simulations (~10k$ SWF), design the gun (~15k$ SWF) build and test it at the stand-alone facility (measure profile, ~40k$ M&S), and then install it in the Tevatron and perform studies (~10k$ M&S). Total is 75k$. The studies will tell us how important the bends in TEL gun are (proton beam goes thru the walls of the hollow e-beam), how the losses depend on the size of the hollow beam and current of hollow beam (when we shrink it, we touch more and more protons). May be we'll be able to see tuneshift of the halo particles due to e-beam (needs some analysis and thinking). Shiltsev

LARP CM April 2009Collimation Conceptual Review Summary - T. MarkiewiczSlide n° 17 / 25 Hollow Electron Lens: New Project?

Beam-Beam Compensation 5 Year Plan BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program W. Fischer BNL, A. Valishev FNAL 09 April 2009 LARP CM12

19 LARP Beam-Beam Task 5-year plan: RHIC received $4M to build 2 electron lenses from the stimulus package (Office of Nuclear Physics – not LARP) Request LARP support on the level of 1.5 FTE for Simulation work at FNAL/SLAC/LBNL, specific to LHC and selected RHIC problems Experiments at Tevatron Request LARP funds for FNAL computer cluster upgrade ($20k) Also request travel support for BNL personnel

20 Current project situation: e-lenses for RHIC -Will receive $4M from stimulus package (includes $1M for labor) Stimulus package has special spending and reporting requirements -Plan for tunnel installation by end of 2011 Have defined major milestones for stimulus package -Collaboration with LARP and CERN LARP supports ~1 FTE at BNL/FNAL/LBL/SLAC for LHC simulations and Tevatron experiments with Gaussian gun A. Kabel, H.-J. Kim, J.-P. Koutchouk, J. Qiang, T. Sen, G. Sterbini, A. Valishev, F. Zimmermann Work distribution Layout: Y. Luo, W. Fischer (AIP co-PIs), S. Pikin Beam-beam simulations: Y. Luo, G. Robert-Demolaize, (N. Abreu), R. DeMaria, C. Montag, W. Fischer Solenoid/gun/collector: S. Pikin, E. Beebe Electron beam transport: M. Okamura 3D e-beam simulations: D. Raparia Power supplies: R. Lambiase Instrumentation: D. Gassner Wolfram Fischer 20

21 Electron Lens for Beam-Beam Compensation

22 Electron Lens for Beam-Beam Compensation

LARP CM April 2009Collimation Conceptual Review Summary - T. MarkiewiczSlide n° 23 / 25 SPS Ecloud Feedback

LARP CM April 2009Collimation Conceptual Review Summary - T. MarkiewiczSlide n° 24 / 25 E-Cloud

LARP CM April 2009Collimation Conceptual Review Summary - T. MarkiewiczSlide n° 25 / 25 Discretionary $25k/lab in FY09 (only?)