STAFF Report Patrick Robert, Rodrigue Piberne & STAFF team.

Slides:



Advertisements
Similar presentations
Status of data production and delivery. 2 17th CAA CrossCal Meeting – 25 March Status of dataset delivery 2.Status of data production pipeline.
Advertisements

CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov CLUSTER / STAFF Action items C. Burlaud, P. Robert, M. Maksimovic, N. Cornilleau-Wehrlin,
STAFF Report. 1.Status of data delivery 2.Delivery Plan 3.Status of data pipeline 4.STAFF/FGM cross calibration 5.Conclusions 2 15th Cross-Calibration.
STAFF-SC / FGM Comparison I. Spectrograms comparison II. Average spectra comparison III. Wave Forms comparison IV. Noise Level Conclusions Cross_Calibration.
Sept. 2008EFW INST+SOC PDR RBSP EFW GSE and SOC-GSE GSE and SOC-GSE (Science Operations Center In Support of INT) John Bonnell Will Rachelson Matt.
FGM report 10 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Chris Carr, Tim Oddy, André Balogh I mperial College London November 2009.
FGM report 9 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Paul French, Chris Carr, Tim Oddy, André Balogh I mperial College London March.
11 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011 STAFF CAA products & Cross-Calibration activities Patrick ROBERT & STAFF Team 5) STAFF-SC CWF.
1 10th CAA Cross-Calibration meeting, Paris, 2-4 November 2009 STAFF/SC cross-calibration activities Patrick ROBERT, C. Burlaud & STAFF Team 2) The Calibrated.
0. Short reminder of STAFF-SC and STAFF-SA experiment I. status of open action items II. status of data production III. status of calibration IV. status.
CAA 12th Cross-cal meeting Toulouse Oct STAFF status report N. Cornilleau-Wehrlin,P. Robert, V. Bouzid, and STAFF team.
Comparison of STAFF-SA and WBD Magnetic components of intense whistler-mode chorus Prepared by Ondrej Santolik 14th CAA Cross-Calibration meeting, York,
CAA 9th Cross-Calibration Workshop, Cambridge, England, 25th-27th March CLUSTER / STAFF ● status of calibration and archiving activities ● archiving.
CLUSTER/STAFF DATA at CAA. 11th Cross-Calibration Meeting, 7-9th April 2010, Goslar. C. Burlaud, P. Robert, O. Santolik, N. Cornilleau-Werhlin, P. Canu,
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 GERB Ground Segment B.C.Stewart RAL.
1 12th CAA Cross-Calibration meeting, Toulouse, Oct 2010 STAFF/SC Calibration & Cross-Calibration activities Patrick ROBERT & STAFF Team, LPP 2)
SWGTemplate- 1 UCB, Nov 15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Search Coil Magnetometer (SCM) team Co-i: A. Roux, O. Le Contel Technical Manager(*):
1 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011 STAFF CAA products & Cross-Calibration activities Patrick ROBERT & STAFF Team 5) STAFF-SC CWF.
STAFF Report Prepared by R. PIBERNE. 2 1.Status of software development 2.Status of Experiment Calibration / Cross Calibration 3.Status of dataset delivery.
WHISPER action items Gábor Facskó, Jean-Gabriel Trotignon,Séna Kougblénou, Xavier Vallières, Guillaume Lointier LPC 2 E/CNRS, Orléans, France 10th CAA.
1 CAA 2009 Peer Review, Jesus College, Cambridge, UK, March CAA Peer Review: Selected Recommendations.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
DAA PEACE Status A. Fazakerley, B. Mihaljčić, I. Rozum, A. Lahiff, G. Watson, D. Kataria UCL Department of Space and Climate Physics Mullard Space Science.
9 th CAA Cross-Calibration Workshop, Jesus College, Cambridge, UK, March /17 CAA Graphics: Pre-generated/On-demand Panels and Cross-Calibration.
16 th CAA Cross-Calibration Workshop IRAP, Toulouse, 6-9 November20121 Removing strong solar array disturbances and telemetry errors from DC magnetic field.
CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu EDI Status of Calibration and Archiving Activities.
Cross-Calibration Meeting, ESTEC, February Comparison of the EDI and FGM Measurements of the Magnetic Field Magnitude Plot shown.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
Cluster Active Archive Status of DWP Activities Simon Walker, Keith Yearby, Hugo Alleyne ACSE, University of Sheffield.
FGM Report: Extended Mode Processing 22 nd Cross Calibration Workshop Chris Carr, Patrick Brown, Leah-Nani Alconcel, Tim Oddy, Peter Fox, Cary Colgan (summer.
Double Star Active Archive - STAFF-DWP Data errors and reprocessing Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin LPP.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
FGM report 5 th Operations Review of the CAA Elizabeth Lucek, Patrick Brown Chris Carr, Tim Oddy, André Balogh I mperial College London June 9 th 2010.
Cluster Active Archive Science User Working Group (CAASUWG) - update Matt Taylor on behalf of CAASUWG.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
Laboratoire de Physique des Plasmas C ROSS C ALIBRATION STAFF R EPORT TH M ARCH 2015 L EIDEN Prepared by R. Piberne & R. Katra Laboratoire de Physique.
CIS Action Items 10 th Cross-Calibration Workshop Observatoire de Paris, Nov
1 CAA 21 th Cross Calibration Meeting, Leiden, th Mar 2015 CAA Cross Cal Meeting Mar 2015 Automated Pipeline Processing.
8th Cross-calibration Workshop CIS data delivery report Kinsale – October 2008.
FGM Report 17 th Cross Calibration Workshop Chris Carr, Elizabeth Lucek, Patrick Brown, Leah-Nani Alconcel, Barry Whiteside, Tim Oddy, Peter Fox, André.
Double Star Active Archive - DWP/STAFF 1 Double Star Active Archive STAFF/DWP Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin.
1 11 th CAA Cross-Calibration Workshop, Hotel die Tanne, Goslar, Germany 7-9 April 2010 CAA 11 th Cross-Calibration Workshop Hotel die Tanne, Goslar, Germany.
Laboratoire de Physique des Plasmas 20 TH CAA CROSS-CAL M EETING CLUSTER-STAFF REPORT O CTOBER 2014 G ÖTTINGEN The STAFF Team Laboratoire de Physique.
DAA Status/Progress B. Mihaljčić, A. Fazakerley, G. Watson, C. Anekallu UCL Department of Space and Climate Physics Mullard Space Science Laboratory 21.
WHISPER report whisper team 16th CAA Cross-Calibration workshop Toulouse, France, 7-8 November 2012 CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE Laboratoire.
MSSL * A.N. Fazakerley, I. Rozum, N. Doss, B. Mihaljcic & the PEACE ops team PEACE CAA Action Items Status 11 th CAA Cross Calibration Meeting, 7 – 9 April.
1 CAA 20 th Cross Calibration Meeting, MPS, Gottingen 16th Oct 2014 CAA Cross Cal Meeting Oct 2014 Pipeline Automation Chris Perry.
WHISPER Measurement of DC Magnetic field amplitude Cross Calibration Workshop 2-3 February 2006 AUTHORS: SURAUD Xavier, DECREAU Pierrette, MAZOUZ Farida,
WEC meeting TED status and WEC timing.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
DAA Status/Progress B. Mihaljčić, A. Fazakerley, N. Doss, G. Watson UCL Department of Space and Climate Physics Mullard Space Science Laboratory 18 th.
16 th CAA Cross-Calibration Workshop IRAP, Toulouse, 6-9 November20121 Data gaps and spikes in FGM data.
21st CAA Cross Calibration Workshop Leiden, March 2015 WHISPER report WHISPER team LPC2E/CNRS.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
CODIF CORSS-CALIBRATIONS C. Mouikis, L. Kistler, K. Genestreti UNH 10th CAA Cross-Calibration meeting L'Observatoire de Paris, Paris, 2-4 November 2009.
21 th CAA Cross-Calibration Workshop Leiden, Netherlands24-26 March Introduction.
FGM report 9 th Cross Calibration Workshop Paul French, Elizabeth Lucek, Chris Carr, Patrick Brown, Tim Oddy, Andre Balogh Imperial College London March.
FGM Report 21 st Cross Calibration Workshop Chris Carr, Patrick Brown, Leah-Nani Alconcel, Tim Oddy, Peter Fox Imperial College London 24 March 2015.
Double Star Active Archive - STAFF- DWP 1 K.H. Yearby, S.N. Walker, M. Balikhin University of Sheffield.
Status Report of EDI on the CAA
LFR first PFM calibration results
16th CAA Cross-calibration Workshop
10th CAA Operations Review Annual Report of the CIS Experiment
Cluster Active Archive – Wideband data BM2 mode
1. Introduction: general information
20th CAA/DAA Cross Calibration Meeting
H. Rème, I.Dandouras and A. Barthe IRAP, Toulouse, France
Annual Report of the DWP Experiment 9th CAA Operations Review
Operational Description
Annual Report of the FGM Experiment for the 8th Operations Review of the Cluster Active Archive (CAA) Chris Carr, Leah-Nani Alconcel, Patrick Brown,
Presentation transcript:

STAFF Report Patrick Robert, Rodrigue Piberne & STAFF team

2 16th Cross-Calibration Workshop, IRAP, Toulouse, 6-9 November Status of dataset delivery 2. Delivery plan 3. Status of software development 4. Cross Calibration activity. Smoothed transfer function. STAFF CWF NBR - FGM one event comparison. STAFF CWF NBR -FGM ten years comparison study. STAFF HBR-FGM burst mode Scale: ~1 hour Scale: ~ 5 mn Scale: ~ 30s Scale: ~ 2s 5. Conclusion

a. STAFF-SA ProductContentLevel Num. of files ProducedDelivered to CAA C?_CP_STA_AGC Automatic Gain Control 1 1 file/ 1 sat./24h V04: 01/01/2001 to 31/12/2010 V05: 01/01/2011 to 31/07/2012 V04: 01/01/2001 to 31/12/2010 V05: 01/01/2011 to 31/07/2012 C?_CP_STA_PSD Power Spectral Density 2 1 file/ 1 sat./24h V04: 01/01/2001 to 31/12/2010 V05: 01/01/ /07/2012 V04: 01/01/2001 to 31/12/2010 V05: 01/01/ /07/2012 C?_CP_STA_SMSpectral Matrix2 1 file/ 1 sat./24h V04: 01/01/2001 to 31/12/2010 V05: 01/01/2011 to 31/07/2012 V04: 01/01/2001 to 31/12/2010 V05: 01/01/2011 to 31/07/ Status of dataset delivery On time… 16th Cross-Calibration Workshop, IRAP, Toulouse, 6-9 November 2012

4 ProductContentLevel Num. of files ProducedDelivered to CAA C?_CQ_STA_SA_ NOT SRP_ CAVEATS PSD/SM Caveat2 1 file/ 1 sat./24h V01: 01/01/2001 to 31/07/2012 V01: 01/01/2001 to 31/07/2012 C?_CQ_STA_SA_ PSD NEG_ CAVEATS SM Caveat2 1 file/ 1 sat./24h V01: 01/01/2001 to 31/07/2012 V01: 01/01/2001 to 31/07/2012 C?_CP_STA_PPP Polarisation and Propagation Parameters 3 1 file/ 1 sat./24h V04: 01/01/2001 to 31/12/2011 V04: 01/01/2001 to 31/12/2011 C?_CQ_STA_SA_ UNDEFINED_MFA _ CAVEATS PPP Caveat3 1 file/ 1 sat./24h V01: 01/01/2001 to 31/12/2011 V01: 01/01/2001 to 31/12/2011 On time… PPP waiting aux data 16th Cross-Calibration Workshop, IRAP, Toulouse, 6-9 November 2012

b. STAFF-SC, NBR and HBR mode 5 ProductContentLevel Num. of files ProducedDelivered to CAA C?_CP_STA_DWF Decommutated WaveForm 1 1 file/mode/ 1 sat./24h V02: 01/01/2001 to 31/12/2006 V03: 01/01/2007 to 31/12/ 2009 V04: 01/01/2001 To 31/12/2011 V02: 01/01/2001 to 31/12/2006 V03: 01 Jan to 31 Dec V04: 01/01/2001 To 31/12/2008 C?_CP_STA_CWF_GSE Calibrated WaveForm 2 1 file/ 1 sat./24h V01: 01/01/2001 To 31/12/ C?_CP_STA_CS Calibrated Spectra (will be replaced by CCS) 2 1 file/mode/ 1 sat./24h V02: 01/01/2001 to 31/12/2005 V03: 01/01/2006 to 31/12/2009 V02: 01/01/2001 to 31/12/2005 V03: 01/01/2006 to 31/12/2009 CL_CG_STA_SC_ SPECTRO Spectrograms Plots 3 1 file/ 4 sat./3h V01: 01/01/2001 to 31/12/2011 V01: 01/01/2001 to 31/12/2011 DWF: OK CWF: still an effort… CCS: priority after CWF validation 16th Cross-Calibration Workshop, IRAP, Toulouse, 6-9 November 2012

Year of delivery Product SC DWF Version SC Calibrated Complex Spectra V SC Images2012 SC CWF GSE SC CWF ISR ? ? SA AGC/ PSD / SM/ Version SA AGC/ PSD / SM/ BE products = Version SA Polarisation/ Propagation Delivery plan 16th Cross-Calibration Workshop, IRAP, Toulouse, 6-9 November 2012

7  SA:  Data pipelines are operational.  An updated pipeline with new format + add of new calibration tables will be developed soon.  Warning: - PSD and SM data were formerly described to be in the ISR2 reference frame. Indeed it’s in SR2. - SM BB units are mV².m - ².Hz -1 rather than nT² Hz SM BE units are mV².m - ².Hz -1 rather than nT.mV.m -1.Hz -1. (conversion factor to SI units given in UG) 3. Status of software development 16th Cross-Calibration Workshop, IRAP, Toulouse, 6-9 November 2012

8  SC:  CWF pipeline was updated to fulfil CAA recommendations. HBR and NBR mode are now merged and some timing issues were corrected. The production pipeline was also optimized in order to be as fast as possible: Ex: one year (2002), NBR + HBR + merge + CEFpass = 7 days, with 10 CPU. ≃ 0.6h / GB.  CCS pipeline is under development, with a new data gaps management and will provide data both in GSE system (0.6 – 12.5 or 225 Hz) and in ISR2 system (0.1 – 12.5 or 225 Hz). 16th Cross-Calibration Workshop, IRAP, Toulouse, 6-9 November 2012

9 4.a : Raw transfer function for HBR mode  Experimental transfer function show problems near 50Hz and 100Hz  Ex: C3 – HBR x component Hz 4. Cross Calibration / new results 16th Cross-Calibration Workshop, IRAP, Toulouse, 6-9 November 2012

10 4.b : Smoothed transfer function  Smoothed transfer function  Ex: C3 – HBR x component Hz 16th Cross-Calibration Workshop, IRAP, Toulouse, 6-9 November 2012

11 4.c : STAFF CWF NBR - FGM one event comparison SR2 - STAFF (25 Hz) - FGM (~23 Hz) FGM: CAA FULL STAFF: CWF ≃ 1% σ∆B/B ≃ 1% Both in SR2 system 16th Cross-Calibration Workshop, IRAP, Toulouse, 6-9 November 2012

12 4.d : STAFF CWF NBR -FGM ten years comparison study C1 (average cal) C2 C3 C4 FGM: CAA FULL (~23 Hz) STAFF: CWF (25 Hz) ≃ 1% σ∆B/B ≃ 5% ≃ Or ~ a few nT for low fields (SR2 system) Uncredible stability of the instruments over 10 years… 16th Cross-Calibration Workshop, IRAP, Toulouse, 6-9 November 2012

13 4.e : STAFF HBR-FGM burst mode C1 – SR2 FGM: CAA FULL Burst mode STAFF: CWF HBR mode ≃ 1% σ∆B/B ≃ 6% - STAFF (450 Hz) - FGM (~66 Hz) STAFF Bz does not see DC field but agreement on fluctuations GOOD !! Both in SR2 system Scale: ~1 hour 5 mn 16th Cross-Calibration Workshop, IRAP, Toulouse, 6-9 November 2012

14 4.e : STAFF HBR-FGM burst mode - C1 – SR2 Scale: ~ 5 mn Still good agreement on fluctuations 30s FGM: CAA FULL Burst mode STAFF: CWF HBR mode ≃ 1% σ∆B/B ≃ 6% - STAFF (450 Hz) - FGM (~66 Hz) 16th Cross-Calibration Workshop, IRAP, Toulouse, 6-9 November 2012

15 4.e : STAFF HBR-FGM burst mode C1 – SR2 Scale: ~ 30s 10 s  0.1 Hz good agreement only on fast fluctuations Low frequency agreement in spin plane depend on B polarisation (Will bedetailled in next version of CR and paper) 2s ≃ 3% σB/B ≃ 15% 16th Cross-Calibration Workshop, IRAP, Toulouse, 6-9 November 2012

16 4.e : STAFF HBR-FGM burst mode C1 – SR2 Scale: ~ 2 s 0.1 s  10 Hz ~50 Hz fluctuation : real signal 16th Cross-Calibration Workshop, IRAP, Toulouse, 6-9 November 2012

17 Status of dataset delivery/Delivery plan ~ OK Status of software development - DWF: finished - CWF: finished, but results under checking - CCS software almost ready - SA pipeline: to be updated with new format and new calibration tables Cross Calibration activity. Smoothed transfer function introduced (best HBR calibration). STAFF CWF NBR - FGM one event comparison detailed. STAFF CWF NBR -FGM ten years comparison study. STAFF HBR-FGM burst mode comparaison: comparison at different time scale show limits of each instruments (1 hour, 5 mn, 30s, 2s) All this news results will be integrated in a next version of the STAFF CR, and used for the papers « ~ CLUSTER STAFF/FGM data comparaisons in the common frequency range » 5. Conclusion 16th Cross-Calibration Workshop, IRAP, Toulouse, 6-9 November 2012