Security WG: Report of the Spring 2010 Meeting Renaissance Hotel Portsmouth, VA May 7, 2010 Howard Weiss NASA/JPL/Cobham +1-443-430-8089.

Slides:



Advertisements
Similar presentations
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
Advertisements

1 CCSDS Security Working Group Fall 2008 Meeting October 2008 Berlin Germany.
7-Apr-2014-cesg-1 Joint CMC-CESG Meeting NH Conference Centre, Nordwijkerhout, Netherlands Hosted by ESA/ESTEC 7 April 2014 CCSDS Engineering Steering.
30-March-2015-cesg-1 Martin Suess (AD) Rick Barton (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) October.
PS 1 16 June 2006 SEA CESG SUMMARY Rome, Italy, 16 June 2006.
Security WG: Report of the Winter 2007 Meeting Colorado Springs, CO USA January 20, 2007 Howard Weiss NASA/JPL/SPARTA
Security WG: Report of the Spring 2015 Meeting Caltech, Pasadena CA USA 27 March 2015 Howard Weiss NASA/JPL/PARSONS
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
CCSDS Security WG Management Remarks Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > www.DLR.de/rb Slide 1.
1 Security Policy Framework & CCSDS Common Criteria Use CCSDS Security WG Fall 2005 Atlanta, GA USA Howard Weiss NASA/JPL/SPARTA
MOIMS Reportp. 1 Digital Repository Audit and Certification BOF Goal  Obtain CCSDS / ISO approval of a standard that establishes the criteria that a repository.
Symmetric Key Management Books Development Plan Daniel Fischer (ESA) Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
Security WG: Report of the Fall 2014 Meeting BSI, London UK 14 November 2014 Howard Weiss NASA/JPL/PARSONS
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2010 London, UK Takahiro Yamada, JAXA/ISAS.
Security WG Status Review ESA European Space Operations Centre Darmstadt, Germany 16 April 2012 Howard Weiss NASA/JPL/SPARTA
Security WG: Report of the Fall 2005 Meeting Atlanta GA September 16, 2004 Howard Weiss NASA/JPL/SPARTA.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) April.
1 CCSDS Security Working Group Fall 2010 Meeting October 2010 British Standards Institute London, UK Howard Weiss NASA/JPL.
Information Architecture WG: Report of the Winter 2007 Meeting January 20, 2007 Dan Crichton, Chair NASA/JPL.
Security WG: Report of the Fall 2008 Meeting DIN, Berlin Germany October 17, 2008 Howard Weiss NASA/JPL/SPARTA
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/PARSONS November 2014 BSI, London.
1 CCSDS Threat Document Discussion CCSDS Security Working Group Fall 2004 Meeting CNES, Toulouse FR Howard Weiss NASA/JPL/SPARTA
Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
Security WG: Report of the Spring 2005 Meeting April 14, 2004 Howard Weiss.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
Security WG: Status Briefing Noordwijkerhout, The Netherlands) 31 March 2014 Howard Weiss NASA/JPL/PARSONS
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
Information Architecture WG: Report of the Spring 2006 Meeting June 16, 2006 Dan Crichton, Chair NASA/JPL.
1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.
Information Architecture WG: Report of the Fall 2005 Meeting September 16, 2005 Dan Crichton, Chair NASA/JPL.
1 Information Security Planning Guide CCSDS Security WG Spring 2005 Athens, GR Howard Weiss NASA/JPL/SPARTA April 2005.
Security WG: Report of the Spring 2008 Meeting Marriott Courtyard Crystal City, VA March 14, 2008 Howard Weiss NASA/JPL/SPARTA
SLS AREA REPORT May SLS AREA REPORT CESG MEETING Montreal, 17 May 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
November SECURITY WORKING GROUP REPORT November 2004.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Information Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Steve Hughes, NASA/JPL.
1 CCSDS Security Working Group Spring 2014 Meeting 31 March – 1 April 2014 Noordwijkerhout, The Netherlands Howard Weiss NASA/JPL/PARSONS* Identity crisis:
1 Document Status CCSDS Security Working Group March 2008.
1 CCSDS Security Working Group January 25 Telecon.
SM&C WG Plenary CCSDS Spacecraft Monitoring & Control WG (SM&C) Workshop #17, Darmstadt (D), Apr 2012 Mario Merri, ESA/ESOC, Chairman.
1 CCSDS Security Working Group Spring 2011 Meeting May 2011 Deutsches Institut für Normung (DIN) Berlin, Germany Howard Weiss NASA/JPL.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
Security WG: Report of the Fall 2015 Meeting ESA/ESOC, Darmstadt DE 12 November 2015 Howard Weiss NASA/JPL/PARSONS
Security WG: Status Briefing BSI, London UK 10 November 2014 Howard Weiss NASA/JPL/PARSONS
Security WG: Report of the Spring 2014 Meeting NH Hotel Leeuwenhorst Noordwijkerhout, The Netherlands 3 April 2014 Howard Weiss NASA/JPL/PARSONS
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
1 20 April 2009 Cross Support Service Area Cross Support Service Area Opening Plenary Colorado Springs, Colorado, USA 20 April 2009 Erik Barkley (AD) /
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
Information Architecture WG: Report of the Fall 2004 Meeting November 16th, 2004 Dan Crichton, NASA/JPL.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/Cobham (Parsons) October 2011.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
Security WG: Report of the Spring 2004 Meeting May 13, 2004 Howard Weiss, NASA/JPL/SPARTA.
Security WG: Report of the Spring 2006 Meeting Rome, Italy June 16, 2006 Howard Weiss NASA/JPL/SPARTA
Security WG: Status Briefing Cleveland, Ohio USA 15 October, 2012 Howard Weiss NASA/JPL/SPARTA skype: hsweiss.
The CCSDS Security WG is chartered to:
Security WG: Status Briefing
Security WG: Report of the Fall 2005 Meeting
CCSDS Systems Engineering Area: Security Working Group
Security WG: Report of the Spring 2016 Meeting
Security WG: Report of the Fall 2013 Meeting
Delta-DOR WG: Report of the Fall 2010 Meeting
Presentation transcript:

Security WG: Report of the Spring 2010 Meeting Renaissance Hotel Portsmouth, VA May 7, 2010 Howard Weiss NASA/JPL/Cobham

Meeting Agenda 4 May 2010 (09:00 – 17:00) – Welcome, opening remarks, logistics, agenda bashing, introduction for new attendees – Review results of Fall 2009 meeting – High-level Document Status (security architecture, algorithms, key management, mission planners, glossary) – Review CWE WG entries: charter, programs, schedules – Meet w/SANA – BNSC becomes the UK Space Agency (Black) – Security Architecture FINAL review (Black) – Algorithm Document review (Weiss) – Think about testing for Yellow Book – Authenticated Encryption Algorithms (Aguilar-Sanchez) – Glossary Review (Weiss)

Meeting Agenda (cont) 5 May 2010 (09:00 – 17:00) – Mission Planner’s Guide (Biggerstaff) – Key Management (Fischer/Sanchez-Aguilar) » Identity-Based Key Management (Birrane) – Network Layer Security (Pajevski/Weiss) – Link Layer Security (Weiss/all) – Other areas of discussion – New work areas 6 May 2010 – 09:00-17:00: Space Data Link Security WG 7 May 2010 – 09:00-12:30: Space Data Link Security WG – 13:00-17:00: SEA Wrap-up Plenary

Attendance NameOrganization Address Howard Weiss Mark Daniel Martin Lorenzo Clayton Craig Mike Ignacio Fred Marc

Executive Summary  Attendees from UKSA, ESA/ESTEC, ESA/ESOC, DLR, ASI, CSA, NASA/GSFC, NASA/JSC, and NASA/JPL. No attendees from CNES.  Charter revisions will be discussed via .  Discussed BNSC becoming the UK Space Agency (UKSA).  Discussed SecWG contributions/use of SANA (algorithm IDs, glossary)  Reviewed the Security Architecture – we will submit as WG final.  Reviewed Algorithm Blue Book – not too many comments.  Decided to take Security Glossary review to .  Reviewed Mission Planners Guide – minor edits and then final.  Reviewed key management. Green Book has editorial edits.  Discussed KM Blue Book. Just getting started.  Discussed Identity-based keying and Erasure Coding.  Discussed network layer security. Two books: Green to “describe” the IPsec profile for CCSDS and Blue/Magenta to “define” the profile.  Telecon to be held in early Sept.

Summary of Goals and Deliverables 1. Update & evolve the charter. 2. Security Architecture submit as final after edits. 3. Algorithm document moving well. Move to Red at next mtg. Need to get started on Yellow Book for testing. 4. Mission Planners Guide – minor edits and then to Secretariat. 5. Key Management green book – minor edits and then to Secretariat. 6. KM Blue Book for symmetric KM just starting. White book in London. 7. Security glossary – aiming for completion by London. 8. Network layer security – White Book (green) by London.

SEA Area MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.Security WG Goal: Working Status: Active _X_ Idle ____ Summary progress: Seven documents actively being produced (Glossary, Key Management (2), Mission Planners Guide, Algorithms, Network Layer). All docs green. Progress since last meeting: Security Architecture doc final edits, mission planners guide and KM Green completed final edits. Problems and Issues: Resources – Excellent right now but need to ensure continued participation from all member agencies status:OKCAUTIONPROBLEM Comment: Working Group is advancing and producing good products. Docs OK.

Near-Term Schedule DeliverableMilestoneDate Charter Revision Include WG “roadmap”08/10 Algorithm Blue Book Clean up descriptive material into notes, discussion & capture for Green Book 09/10 Key Management Green Book Revise with final edits and then submit to Secretariat 06/10 Key Management Blue Book Changed from Magenta to Blue Book. Create a symmetric KM BB White Book for next mtg 09/10

Near-Term Schedule (cont) Mission Planners Security Guide Final edits Submit to Secretariat Common Criteria Protection Profiles On holdTBD Application Layer Security On holdTBD Network Layer SecurityWhite Book (Green)09/10 Security WG Overview & Capabilities Presentation Create WG overview as basis for explaining capabilities to other WG In process

Open Issues  None

Action Items Item NumberAction Item:Assigned to:Date Due: SecWG0510:1Revise/edit Security ArchitectureMark Stables05/30/10 SecWG0510:2Revise/edit Algorithm documentHoward Weiss09/30/10 SecWG0510:3Agencies need to obtain resources for algorithm testing All10/15/10 SecWG0510:4Investigate ISO alternatives for other encryption algorithms/modes. Ignacio Aguilar Sanchez and Howard Weiss 10/30/10 SecWG0510:5Resend Security Glossary to WG for review & comments Howard Weiss05/15/10 SecWG0510:6Obtain a document number for Algorithms document & provide to Craig Biggerstaff for inclusion in Mission Planner’s Guide Howard Weiss05/15/10

Action Items (2) SecWG0510:7Perform final edits on Mission Planner’s Guide and submit to Secretariat editor. Craig Biggerstaff06/30/10 SecWG0510:8Write Network Layer Security Profile white book (green) Mike Pajevski and Howard Weiss 09/30/10 SecWG0510:9 draft charter changes to WG for comments & discussion Howard Weiss05/07/10 SecWG0510:10Advise Secretariat that PDF documents do not allow comments to be embedded Martin Pilgram05/30/10 SecWG0510:11Ensure that security glossaries currently in SecWG documents are consistent with one another Howard Weiss & Tom Gannett On-going SecWG0510:12Set up telecon for Sept 2010Howard Weiss08/15/10

Resource Problems  Resources are adequate to perform the current tasks.  However, testing will require additional resources (or redirection of current resources)

Risk Management Update  Must ensure that the current trend of additional resources remains and that resources don’t shrink.

Cross Area WG / BOF Issues  Joint meeting with Space Data Link Security WG

Resolutions to be Sent to CESG and Then to CMC  None

New Working Items, New BOFs, etc.  Network Layer Green + Blue/Magenta “profiles”