© Paul Koch 1-1 Chapter 20. Value-at-Risk (VaR) I. Motivation: A. Option sensitivities like delta, gamma, vega,..., describe different aspects of risk.

Slides:



Advertisements
Similar presentations
VALUE AT RISK.
Advertisements

Chapter 25 Risk Assessment. Introduction Risk assessment is the evaluation of distributions of outcomes, with a focus on the worse that might happen.
Options, Futures, and Other Derivatives 6 th Edition, Copyright © John C. Hull Chapter 18 Value at Risk.
Chapter 12: Basic option theory
Value at Risk Chapter 18 Pertemuan 07
VAR METHODS. VAR  Portfolio theory: risk should be measure at the level of the portfolio  not single asset  Financial risk management before 1990 was.
Chapter 21 Value at Risk Options, Futures, and Other Derivatives, 8th Edition, Copyright © John C. Hull 2012.
VAR.
Chapter 21 Value at Risk Options, Futures, and Other Derivatives, 8th Edition, Copyright © John C. Hull 2012.
Value at Risk Concepts, data, industry estimates –Adam Hoppes –Moses Chao Portfolio applications –Cathy Li –Muthu Ramanujam Comparison to volatility and.
RISK VALUATION. Risk can be valued using : Derivatives Valuation –Using valuation method –Value the gain Risk Management Valuation –Using statistical.
Lecture Presentation Software to accompany Investment Analysis and Portfolio Management Seventh Edition by Frank K. Reilly & Keith C. Brown Chapter.
Duration and Yield Changes
Market-Risk Measurement
CHAPTER 4 Background on Traded Instruments. Introduction Market risk: –the possibility of losses resulting from unfavorable market movements. –It is the.
FRM Zvi Wiener Following P. Jorion, Financial Risk Manager Handbook Financial Risk Management.
The Three Common Approaches for Calculating Value at Risk
Value at Risk (VAR) VAR is the maximum loss over a target
“Money is better than poverty, if only for financial reasons,”
Volatility Chapter 9 Risk Management and Financial Institutions 2e, Chapter 9, Copyright © John C. Hull
The Lognormal Distribution
Brandon Groeger April 6, I. Stocks a. What is a stock? b. Return c. Risk d. Risk vs. Return e. Valuing a Stock II. Bonds a. What is a bond? b. Pricing.
Options, Futures, and Other Derivatives 6 th Edition, Copyright © John C. Hull Chapter 18 Value at Risk.
Value at Risk.
Risk Management and Financial Institutions 2e, Chapter 13, Copyright © John C. Hull 2009 Chapter 13 Market Risk VaR: Model- Building Approach 1.
Lecture 5: Value At Risk.
Measuring Returns Converting Dollar Returns to Percentage Returns
Hedging and Value-at-Risk (VaR) Single asset VaR Delta-VaR for portfolios Delta-Gamma VaR simulated VaR Finance 70520, Spring 2002 Risk Management & Financial.
Advanced Risk Management I Lecture 6 Non-linear portfolios.
FRM Zvi Wiener Following P. Jorion, Financial Risk Manager Handbook Financial Risk Management.
Alternative Measures of Risk. The Optimal Risk Measure Desirable Properties for Risk Measure A risk measure maps the whole distribution of one dollar.
Market Risk Chapter 10 © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. McGraw-Hill/Irwin.
Irwin/McGraw-Hill 1 Market Risk Chapter 10 Financial Institutions Management, 3/e By Anthony Saunders.
©2003 McGraw-Hill Companies Inc. All rights reserved Slides by Kenneth StantonMcGraw Hill / Irwin Chapter Market Risk.
A History of Risk and Return
HJM Models.
Options, Futures, and Other Derivatives, 5th edition © 2002 by John C. Hull 22.1 Interest Rate Derivatives: The Standard Market Models Chapter 22.
LECTURE 22 VAR 1. Methods of calculating VAR (Cont.) Correlation method is conceptually simple and easy to apply; it only requires the mean returns and.
1 Value at Risk Chapter The Question Being Asked in VaR “What loss level is such that we are X % confident it will not be exceeded in N business.
Value at Risk Chapter 20 Value at Risk part 1 資管所 陳竑廷.
Chapter 08 Risk and Rate of Return
Topic 5. Measuring Credit Risk (Loan portfolio)
Fundamentals of Futures and Options Markets, 5 th Edition, Copyright © John C. Hull Value at Risk Chapter 18.
Value at Risk Chapter 16. The Question Being Asked in VaR “What loss level is such that we are X % confident it will not be exceeded in N business days?”
Market Risk A financial firm’s market risk is the potential volatility in its income due to changes in market conditions such as interest rates, liquidity,
Estimating Volatilities and Correlations Chapter 21.
Value at Risk Chapter 20 Options, Futures, and Other Derivatives, 7th International Edition, Copyright © John C. Hull 2008.
Options, Futures, and Other Derivatives, 5th edition © 2002 by John C. Hull 16.1 Value at Risk Chapter 16.
Options, Futures, and Other Derivatives, 4th edition © 1999 by John C. Hull 14.1 Value at Risk Chapter 14.
Estimating Volatilities and Correlations
CHAPTER 10 Market Risk Copyright © 2011 by The McGraw-Hill Companies, Inc. All Rights Reserved.McGraw-Hill/Irwin.
1 VaR Models VaR Models for Energy Commodities Parametric VaR Historical Simulation VaR Monte Carlo VaR VaR based on Volatility Adjusted.
Value at Risk (VaR).
Hedging and Value-at-Risk (VaR)
Types of risk Market risk
The Three Common Approaches for Calculating Value at Risk
5. Volatility, sensitivity and VaR
Value at Risk and Expected Shortfall
Market-Risk Measurement
Chapter 12 Market Risk.
Risk Mgt and the use of derivatives
A Brief History of Risk and Return
Types of risk Market risk
Chapter 20. Value-at-Risk (VaR)
Financial Risk Management
Market Risk VaR: Model-Building Approach
Volatility Chapter 10.
Lecture Notes: Value at Risk (VAR)
Lecture Notes: Value at Risk (VAR)
Presentation transcript:

© Paul Koch 1-1 Chapter 20. Value-at-Risk (VaR) I. Motivation: A. Option sensitivities like delta, gamma, vega,..., describe different aspects of risk for a portfolio. 1. Banks typically compute each of these measures every day for each of the market variables they are exposed to. Traders & managers for the firm must know their situation. 2. There may be hundreds of these market variables. This analysis leads to huge number of risk measures each day. -- too much information for senior management to use.

© Paul Koch 1-2 I.B. Definition of VaR 1. VaR is an attempt to provide a single number that summarizes the total risk in a portfolio of financial assets. 2. VaR aims to make a statement of the following form: “We are X% certain that we will not lose more than V dollars in the next N days.” 3. Appeal: easy to understand. Simply asks, how bad can things get? 4. The variable, V, is the VaR of the portfolio. V is a function of two parameters: N, the time horizon; X, the confidence level.

© Paul Koch 1-3 I.C. Regulators Require VaR for Banks 1. Calculation of VaR was made easier in Oct. 1994, when J.P. Morgan made its RiskMetrics database of volatilities and correlations freely available to all market participants. 2. The REGULATORS require Financial Institutions to use VaR. e.g., Banks are now required to calculate VaR; Regulators use VaR in determining required capital for a bank, to reflect the market risk it is bearing. 3. Bank regulators use N=10 and X=99; They consider losses over a 10-day period that are expected only 1% of the time.

© Paul Koch 1-4 I.D. Background for VaR Facts about the Normal distribution:

© Paul Koch 1-5 II. Volatilities A. The risk that a portfolio will lose value depends on the volatilities of the market variables it is exposed to. These volatilities play a key role in determining VaR. B. Definition. 1.Recall definition of volatility for B / S model: σ = std dev of continuously compounded return in ONE YEAR.  T ½ = std dev of continuously compounded return earned in time T. **The “Square Root Effect”: uncertainty increases as a function of sqrt(T). 2.In VaR calculations, T is measured in DAYS, so σ is "volatility per day." σ day = std dev of continuously compounded return in ONE DAY, = std dev of proportional change in asset price in ONE DAY. a. Note: σ day  σ year / (252) ½ ; there are 252 trading days in one year. Thus, σ day  σ year (.06).

© Paul Koch 1-6 II.C. Estimating Volatility 1. Define σ n = volatility per day ( σ day ) for market variable, calculated on day n. Thus, σ n 2 = variance rate of the market variable on day n. 2. Standard approach: Estimate HISTORICAL VOLATILITY. Let { S 1, S 2,..., S n } be daily closing prices. Let u i = ln ( S i / S i-1 ) = daily returns. Then σ n 2 = 1 / (n-1) Σ ( u i - mean(u) ) 2 Or, use approximation: Let mean(u) = 0; then σ n 2 = 1/n Σu i 2. [ Mean daily return ≈ 0; This is simple, & gives good approximation. ]

© Paul Koch 1-7 II.C. Estimating Volatility 3. Alternative approach: EWMA (Exponentially Weighted Moving Avg). a.The sample variance in 2. weights all u i 2 terms equally (same weight on day 1 or day n). EWMA weights u i 2 terms less if they are further back in time. Result: σ n 2 = λ σ n (1 - λ) u n 2 (0 < λ < 1). b.Note1: If you substitute successively for σ n-1 2, σ n-2 2,..., you can see that σ n 2 depends on sum of past u i 2 terms, where weights decline exponentially : 1 st : Result is also true in period n-1: --- σ n-1 2 = λ σ n (1-λ) u n-1 2. Thus:σ n 2 = λ (λσ n (1-λ)u n-1 2 ) + (1-λ) u n 2 = λ 2 σ n (1-λ) [ λ u n u n 2 ]. 2 nd :Result is also true in period n-2: --- σ n-2 2 = λ σ n (1-λ) u n-2 2. Thus:σ n 2 = λ 2 (λσ n (1-λ)u n-2 2 ) + (1-λ) [ λ u n u n 2 ] = λ 3 σ n (1-λ) [ λ 2 u n λ u n u n 2 ]. k th :After k such substitutions, λ k ≈ 0, so we get : σ n 2 = λ k σ n-k 2 + (1-λ) [ u n 2 + λ u n-1 + λ 2 u n … + λ k u n-k 2 ] orσ n 2 ≈ 0 + (1-λ) [ u n 2 + λ u n-1 + λ 2 u n … + λ k u n-k 2 + … ].

© Paul Koch 1-8 II.C. Estimating Volatility More on EWMA:  n 2 =  n (1- ) u n 2 3.c. Example:Let λ =.9, σ n-1 =.01, and u n =.02; Thenσ n 2 = (.9)(.0001) + (.1)(.0004) = andσ n =.0114 Note: In this example, return on day n (u n =.02) > σ n-1 (=.01). Thus, when we add u n 2 to get our new estimate, this increases σ n. If, instead, u n < σ n-1, this would decrease σ n. Thus, updated estimates of σ n depend greatly on recent u n. Note1: EWMA approach can be updated easily each day. Simply keep current estimate of σ n-1, & consider the new daily return, u n. Note2: EWMA approach succeeds in tracking changes in volatility; If true σ n 2 ↑ over time, the values for u i 2 will also ↑, so σ n 2 will ↑. Note3: λ determines how responsive σ n 2 is to changes in u i 2. Low value of λ means u i 2 terms further back mean less; recent u i 2 more. High value of λ means u i 2 terms further back mean more; recent u i 2 less.

© Paul Koch 1-9 III. Correlations A. Intuition: The risk that a portfolio will lose value also depends on the correlations among the market variables it is exposed to. 1. Suppose portfolio is exposed to risk that both Euro & Yen will ↓. We should consider whether these exchange rates are correlated! i.e., If Euro ↓, does Yen also tend to ↓? B. Definition. 1.Consider two market variables, U & V (returns/changes in 2 prices). Let: σ u,n = daily volatility of variable U, calculated on day n; σ v,n = daily volatility of variable V, calculated on day n; cov n = covariance between daily returns, U & V, on day n. Then ρ uv = cov n / σ u,n σ v,n.

© Paul Koch 1-10 III.C. Estimating Correlations 1. Historical correlation measures -- equally weighted u i and v i : Letmean(u) = mean(v) = 0; Then:σ u,n 2 = 1/n Σ u i 2 ; σ v,n 2 = 1/n Σ v i 2 ; cov n = 1/n Σ u i v i. Note:This formula gives equal weights to all u i v i terms in cov n. 2. EWMA:cov n = λ cov n-1 + (1-λ) u n v n. Note:Weights on u i v i terms decline as we move back in time. The lower the value of λ, the less weight on older terms, and the more weight is placed on recent observations. Note:Must be consistent how you treat σ u,n 2, σ v,n 2, and cov n. If you get σ u,n 2 & σ v,n 2 with equal (declining) weights, must also get cov n with equal (declining) weights.

© Paul Koch 1-11 IV. Simple Example A. Portfolio 1 consists of $10,000,000 in IBM stock (U); Daily Volatility = σ u,n =.02 (corresponds to annual Vol of.02(252) ½ =.32); Compute the VaR of this portfolio. Let N = 10 days, X = 99. Std Dev of change in IBM pf over 1 day = $10,000,000 (.02) = $200,000. Std Dev of change in IBM pf over 10 days = $10,000,000 (.02) (10 ½ ) = $200,000 (10 ½ ) = $632,456. Assume1: mean(U) = 0. This expected return is likely small relative to Std Dev. e.g., if E(r) over 1 year = 18%, then E(r) over 1 day = 18% / 252 =.07% [ much < 1-day σ u,n = 2% ]; Assume2: U is normally distributed (i.e., S is lognormal). Then there is 99% chance S will not decrease more than 2.33 std dev. (Or a 95% chance S will not decrease more than 1.65 std dev). THUS, the 99% / 10-day VaR is 2.33 x $632,456 = $1,473,621; Or, the 95% / 10-day VaR is 1.65 x $632,456 = $1,043,552.  99% sure won’t lose > $1,473,621 in 10 days; 95% sure won’t lose > $1,043,552 in 10 days.

© Paul Koch 1-12 IV. Simple Example B. Portfolio 2 consists of $5,000,000 of AT&T stock (V); Daily Volatility = σ v,n =.01 (corresponds to annual Vol of.01(252) ½ =.16); Std Dev of change in AT&T pf over 10 days = $5,000,000 x.01 x (10 ½ ) = $158,144 The 99% / 10-day VaR for this portfolio is: 2.33 x $158,144 = $368,405; The 95% / 10-day VaR for this portfolio is: 1.65 x $158,144 = $260,937. [ Less Value-at-Risk than Portfolio 1! ] C. Portfolio3 = Portfolio1 + Portfolio2. In addition, suppose we know ρ uv =.7 We need the Std Dev of this portfolio, U + V. In general, σ(U + V) = [ σ U 2 + σ V ρ σ U σ V ] ½ For this example, we have σ U = $632,456, and σ V = $158,114. Thus, σ(U+V) = [$632, $158, (.7)(632,456)(158,144)] ½ = $751,665 Then: 99% / 10-day VaR for Portfolio3 is 2.33 x $751,665 = $1,751,379 Or: 95% / 10-day VaR for Portfolio3 is 1.65 x $751,665 = $1,240,247

© Paul Koch 1-13 IV. Simple Example D. The Benefits of Diversification. If changes in value of IBM & AT&T were perfectly correlated (ρ = 1), VaR of Portfolio3 would be sum of VaR's of Portfolio's 1 & 2. If IBM and AT&T have correlation < 1, (ρ < 1), VaR of Portfolio3 will be < sum of VaR's of Portfolio's 1 & 2. HERE, ρ =.7; VaR for Portfolio1 (U) = $1,473,621; VaR for Portfolio2 (V) = $368,405; VaR for Portfolio3 (U + V) = $1,751,379. Benefits of Diversification = [ VaR(U) + VaR(V) ] - VaR(U + V) = [ $1,473,621 + $368,405 ] - $1,751,379 = $90,647 This exercise shows that lower correlation means lower VaR.

© Paul Koch 1-14 V. Linear Model A. VaR calculations are straightforward when (like in above example): 1. We assume that change in value of portfolio is linearly related to the changes in values of underlying market variables; 2. The changes in values of underlying market variables are normal. B. General Linear Model (GLM): Assume there are n underlying market variables; n ΔP = Σ α i Δx i i=1 where ΔP = $-change in portfolio value in one day; Δx i = prop. change (return) on underlying i th market variable during day; α i = constants. Define: σ i = daily volatility of Δx i ; ρ ij = correlation between Δx i and Δx j. n Then σ p = daily volatility of ΔP, where σ P 2 = Σ α i 2 σ i Σ Σ α i α j σ i σ j ρ ij. i=1 i<j

© Paul Koch 1-15 V.B. General Linear Model 1. Redo previous example; n = 2 assets in Portfolio3; Δx 1 & Δx 2 are prop. changes in prices of IBM & AT&T in 1 day; Measuring values in millions of $, ΔP = 10Δx 1 + 5Δx 2 [α 1 = 10; α 2 = 5] Also given:σ 1 =.02;σ 2 =.01;ρ 12 =.7; Thenσ P 2 = 10 2 x x x 10 x 5 x.02 x.01 x.7 =.0565 andσ P =.238 = std dev of change in portfolio value per day; Thenσ P (10) ½ =.238 (10) ½ =.752 = std. dev. of ΔP over 10 days, and99% / 10-day VaR = 2.33 x.752 = $1.751 million (same answer).

© Paul Koch 1-16 V.C. When Linear Model can be Used 1. When the payoff patterns of the assets in the portfolio are linear. a. Examples: i. Portfolio with no derivatives (stocks, bonds, foreign exchange, & commodities). Here ΔP is linearly dependent on the Δx i (changes in the underlying prices). ii. Portfolio with certain derivatives having linear payoff patterns. e.g.1 Forward contract to buy foreign currency maturing at T. This can be regarded as exchange of a foreign zero-coupon bond for a domestic zero-coupon bond, both maturing at time T. Therefore, we can rewrite this portfolio as linear combination of positions in bonds and foreign exchange, as in i., and ΔP depends linearly on zero-coupon bond prices and exchange rates. e.g.2 Interest rate SWAP. This can be regarded as exchange of a floating rate bond for a fixed rate bond. The fixed rate bond can be regarded as a portfolio of zero-coupon bonds. The floating rate bond will be worth par just after next payment. Thus the interest rate SWAP reduces to a portfolio of long and short positions in zero-coupon bonds.

© Paul Koch 1-17 V.D. Options have Nonlinear Payoffs Thus, linear model only holds approximately when portfolio contains options. 1. Explanation: Consider portfolio of options on a single stock. δ = ΔP / ΔS;  or ΔP = δ ΔS where ΔS is the $ change in the stock price in 1 day. Define Δx as the proportional change (return) in the stock price in 1 day: Δx = ΔS / S;  or  S = S  x Then an approximate relationship between ΔP and Δx is: ΔP = δ ΔS;  or ΔP =  S  x = S   x. When we have position in several market variables that includes options, we can derive approximately linear relation between ΔP & Δx i 's similarly: n ΔP = Σ S i δ i Δx i ; where S i = price of i th market variable; i=1 and δ i = delta of pf wrt i th mkt variable. n This corresponds to old GLM equation: ΔP = Σ α i Δx i with α i = S i δ i. i=1

© Paul Koch 1-18 V.D. Options have Nonlinear Payoffs 2. Example. Consider portfolio of options on IBM and AT&T. Let δ 1 = 1,000 = delta of IBM option position;= (∆P 1 / ∆S 1 ) δ 2 = 20,000 = delta of AT&T option position;= (∆P 2 / ∆S 2 ) S 1 = $120 = share price of IBM; S 2 = $30 = share price of AT&T; σ 1 =.02 = volatility of IBM price changes in one day; σ 2 =.01 = volatility of AT&T price changes in one day. (S 1 ) (  1 ) (S 2 ) (  2 ) As an approximation: ΔP = 120 x 1,000 Δx x 20,000 Δx 2 or ΔP = 120,000 Δx ,000 Δx 2 where Δx 1 & Δx 2 are prop. changes in prices of IBM & AT&T in 1 day, and ΔP is the resulting change in the portfolio. Then the Std Dev of ΔP in one day (in thousands of $) is: [ (120 x.02) 2 + (600x.01) x 120 x.02 x 600 x.01 x.7 ] ½ = Thus the 95% / 5-day VaR is: 1.65 x (5) ½ x 7,869 = $29,033.

© Paul Koch 1-19 VI. Quadratic Model Motivation: When Portfolio includes options, the linear model is only an approximation -- it ignores gamma, or curvature. A. Impact of gamma (  ) on the probability distribution of ΔP. (Fig on top; Fig. 20.4, 20.5 on bottom.) 1. When  > 0 (long options) distrib skewed right. When  < 0 (short options) distrib skewed left. a. Payoff pattern on long call option (  > 0). If underlying market variable is normal, implied distribution is skewed to right. b. Payoff pattern on short call option (  < 0). If underlying market variable is normal, implied distribution is skewed to left.

© Paul Koch 1-20 VI. Quadratic Model Translation of Asset Price Change to Price Change for Long Call

© Paul Koch 1-21 VI. Quadratic Model Translation of Asset Price Change to Price Change for Short Call

© Paul Koch 1-22 VI.B. VaR of Portfolio depends on Left Tail for ΔP 99% VaR is value below which is only 1% of distribution (left tail). 95% VaR is value below which is only 5% of distribution (left tail). 1. Positive gamma portfolio is skewed to right; Has thin left tail & fat right tail (less downside). Thus, if you assume distribution of ΔP is normal, VaR too large; true left tail thinner than normal; Area under thin left tail is less than that under normal; so normal VaR suggests bigger loss than reality; should go less far left. 2. Negative gamma portfolio is skewed to left; Has fat left tail & thin right tail (more downside). Thus, if you assume distribution of ΔP is normal, VaR too small; true left tail fatter than normal; Area under fat left tail is more than that under normal; so normal VaR suggests smaller loss than reality; should go farther left.

© Paul Koch 1-23 VI.C. Better Estimation of VaR: Include both δ &  1. Consider a portfolio dependent on a single asset with price S. a. With Linear Model we assumed: δ = ΔP/ΔS; or ΔP = δ ΔS where ΔS is the $ change in the stock price in one day. b. More accurate relation: ΔP = δ ΔS + 1/2  ΔS 2 (Taylor Series Exp.) c. Defining Δx as proportionate ∆S in one day: Δx = ΔS / S, or ΔS = S Δx. d. We can substitute for ΔS above (in b.) to get: ΔP = S δ Δx + 1/2 S 2  Δx 2 i. For portfolio with n underlying market variables, this becomes: (**1) ΔP = Σ S i δ i Δx i + Σ 1/2 S i 2  i Δx i 2 where S i is i th market variable, and δ i &  i are its delta & gamma. ii. This equation generalizes to: (**2) ΔP = Σ α i Δx i + Σ β i Δx i 2 where α i = S i δ i and β i = 1/2 S i 2  i NOTE: Relation in i & ii is nonlinear in Δx i. Also, this assumes each option depends on only 1 mkt variable. Without this assumption, relation is more general: ΔP = Σ α i Δx i + Σ Σ β ij Δx i Δx j.

© Paul Koch 1-24 VI.C. Better Estimation of VaR: Include both δ &  2. Problem: This nonlinear model is not as easy to work with. Can be used with Simulation Approach (more later). a. Nonlinear Equation (**2) can be used to calculate moments for ΔP: n E(ΔP) = Σ β i σ i 2 ; since E(Δx i ) = 0; i=1 n n E(ΔP 2 ) = Σ Σ [ α i α j σ i σ j ρ ij + β i β j σ i 2 σ j 2 (1 + 2 ρ ij 2 ) ] i=1 j=1 b. These moments can be fitted to a normal distribution. (However, once again, assumption of normality is not great.) c. Can also calculate higher moments of ΔP (skewness, kurtosis). Higher moments can then be used with the Cornish-Fisher expansion to estimate the fractiles of the probability distribution of ΔP that correspond to any required VaR.

© Paul Koch 1-25 VII. Monte Carlo Simulation A. Alternative approach: Use Simulation to get probability distrib. for ΔP. To calculate a one-day VaR for a portfolio: 1.Value the portfolio today, using current values of market variables. 2.Sample once from multivariate normal probability distrib. of Δx i 's. (Pick parameters -- moments -- of distrib. as desired. See VI.C.2.) 3.Use values of Δx i 's that are sampled to determine simulated new value of each market variable at end of the day. 4.Revalue portfolio at end of the day using the new sampled values. 5.Subtract value in step 1 from that in step 4 to get sample ΔP. 6.Repeat steps many times to build probability distrib. for ΔP.

© Paul Koch 1-26 VII. Monte Carlo Simulation B. VaR is computed as proper fractile of probability distrib. of ΔP. 1. For example, calculate 5,000 sample values for ΔP. The 99% / 1-day VaR is value of ΔP for 50th worst outcome; The 95% / 1-day VaR is value of ΔP for 250th worst outcome; … The N-day VaR is then calculated as the 1-day VaR times (N) ½. 2. Drawback of simulation -- computationally intensive (no problem!). A company's complete portfolio (maybe thousands of assets) has to be revalued many times (step 4). a. Can speed procedure by assuming that equation (**2) describes the relation between ΔP and the Δx i 's. (Can then skip steps 3 & 4 each iteration; no need to revalue the portfolio every time.)

© Paul Koch 1-27 VIII. Use of Historical Data A. Can calculate VaR from simulation based on historical mkt behavior. 1.First create a database consisting of daily movements in all market variables over several years. 2.The first simulation trial lets the % changes in all market variables be those experienced on the first day in the database. 3.The second simulation... on the second day. And so on. 4.The change in portfolio, ΔP, is calculated for each simulation trial and VaR is calculated as proper fractile of the prob. distrib. of ΔP. Here the change in portfolio value can be obtained either by revaluing, or by using equation (**2).

© Paul Koch 1-28 VIII. Use of Historical Data B. Advantage: This accurately reflects historical distrib. of mkt variables. C. Disadvantages: 1. Number of simulation trials is limited to number of days in database. 2. Sensitivity analyses are difficult. (With statistical simulation, can change distrib. parameters & rerun.) 3. Variables for which there are no mkt data cannot easily be included. D. Kurtosis. 1. For many mkt variables, the probability distrib of the Δx i and ΔP that is calculated from historical data often exhibits fat tails, so that extreme outcomes are more likely than normal distrib.. This is positive kurtosis.This can be modeled in the simulation...

© Paul Koch 1-29 IX. Stress Testing A. Can examine how current portfolio would perform under the most extreme market moves seen in the last 10 to 20 years. 1. To test impact of extreme movement in U.S. stock market: a. Could let prop. change in all market variables (Δx i 's) equal those on Oct. 19, 1987 (when S&P 500 changed 22.3 std dev’s). b. Could use Δx i 's on Jan. 8, 1988 (S&P 500 changed 6.8 σ's). 2.To test impact of extreme movement in U.K. interest rates: a. Could use Δx i 's on Apr 10, 1992 (10-yr bond yield rose 7.7 σ's).

© Paul Koch 1-30 IX. Stress Testing B. A way to consider implications of extreme events that happen, but are almost impossible according to normal prob. distribution. 1.For example, under normal distribution, a change of 5σ's happens one day every 7,000 years. In practice, we have seen this once or twice every 10 or so years. C. Simple to do. Once we have the variance of the  in value of the portfolio over 1-day, we can multiply this by any number of standard deviations desired, and then multiply by (N) ½ to get N-day VaR at any confidence level.

© Paul Koch 1-31 X. Orange County Case

© Paul Koch 1-32 X. Orange County Case

© Paul Koch 1-33 X. Orange County Case

© Paul Koch 1-34 X. Orange County Case

© Paul Koch 1-35 X. Orange County Case

© Paul Koch 1-36 X. Orange County Case

© Paul Koch 1-37 X. Orange County Case

© Paul Koch 1-38 X. Orange County Case

© Paul Koch 1-39 X. Orange County Case

© Paul Koch 1-40 X. Orange County Case