ORDC Options Analysis SAWG Market Analysis 12/16/2015.

Slides:



Advertisements
Similar presentations
October 7, 2013 QMWG Ancillary Services Methodology Changes Bill Blevins Manager, Operations Planning.
Advertisements

Proposal on Ancillary Service Deliverability Requirements QMWG January 6, 2012.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.
ERCOT Staff Comments Regarding the Proposed Suspension of Residential 2005 Annual Validation RMS Presentation August 10, 2005.
Ancillary Services Methodology Changes for 2015 Sandip Sharma Bill Blevins Dan Woodfin.
SAWG Update to WMS February 4 th, 2015 Brandon Whittle.
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
Load Resource Inputs to the Multi-Interval Real-Time Market ERCOT is requesting input from LRs and QSEs to enable running meaningful MIRTM simulations.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
Recommendation for Board approval of updated nodal fee filing Steve Byone Overview –Historical summary –Highlights from approved interim Nodal Surcharge.
Three Decimals for Profile Resolution. 2 Pro Case for Three Decimals for Profile Resolution  Generation 15 minute pattern rarely has 2 adjacent equal.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) April 2015 Update to COPS.
Capacity Forecast Report Sean Chang Market Analysis and Design Suresh Pabbisetty CQF, ERP, CSQA Credit CWG/MCWG September 16, 2015 ERCOT Public.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
Market Mitigation Concept Group Update Jim Galvin April 26, 2004.
Financial Reporting (Overview & EFIS Users). 2 General Reporting Requirements  Reporting requirements are outlined in the 2011/12 Child Care Business.
Updated Cost/Benefit Analysis for PRR Part A/S Bidding Proposed Methodology.
Mitigated Offer Cap Presented to: NATF Date: September 29, 2009 By: Mark Patterson, Manager Market Operations Support (ERCOT) 1September 29 NATF Meeting.
Bill Hellinghausen EDF Trading North America
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
Updated Cost/Benefit Analysis for PRR 567 Multi-Part A/S Bidding PRS January Meeting January 19, 2006.
1 Project Update and Summary of Project Priority List (PPL) Activity April 16, 2015.
July 10, 2008 ROS Early Delivery Systems Status – R6.3 2 Hour Test John Dumas and Jeff Gilbertson.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
2014 & 2015 Unannounced Unit Testing Summary ERCOT ROS February 4 th, 2016.
DAM Self-Commitment Issues & Solutions, Part 2 Shams Siddiqi, Ph.D. (512) April 21, 2008.
1 ORDC Curve Discussion ERCOT QSE Managers Working Group 9/4/2015.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1 Nodal Stabilization Market Call December 27, 2010.
Ancillary Services Methodology Changes Bill Blevins Manager, Operations Planning.
Analysis of August 13, 2015: ORDC, RRS & PRC Changes Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) November 13, 2015.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
A Broad Review of August 13, 2015 and Similar Historical Situations Luminant Energy January 22, 2016.
1 Project Update and Summary of Project Priority List (PPL) Activity February 11, 2016 ERCOT Public.
Randy S. Baker Director, Credit Risk Management F&A Committee – Preview for CWG / MCWG October 20, 2009 Potential Credit Risk Model Quarterly Update: Q
RATF Policy Decisions Progress Report of RATF May 29, 2014.
Next Steps on Reserve Discount Factor and 2016 Ancillary Service Methodology ERCOT Staff Date 02/25/2016.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
1 Nodal Stabilization Market Call December 16, 2010.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
September 23, 2011 Report On ERCOT Action Items From September 6, 2011 RTDF Meeting John Dumas ERCOT.
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
Capacity Forecast Report Fall Update Sean Chang Market Analysis and Design Suresh Pabbisetty CQF, ERP, CSQA Credit CWG/MCWG December 16, 2015 ERCOT Public.
1 NPRR638 Back-casting Updated and Supplementary Results CWG/MCWG Suresh Pabbisetty, ERP, CQF, CSQA. ERCOT Public May 20, 2015.
1 Project Update and Summary of Project Priority List (PPL) Activity to Date June 11, 2014.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
Multi-Interval Real-Time Market (MIRTM) Updates SAWG Sean Chang Market Analysis February 22, 2016 ERCOT Public Version
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
Use of ONTEST Resource Status over Telemetry: – ERCOT protocol permits the use of telemetered Resource Status code “ONTEST” during periods of start-up.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
General Overview Of Resource Costs
RTDF Overview of Data Analysis & Status of “Consesus Items”
Real-Time Co-Optimization:
Real-Time Co-optimization of Energy & Ancillary Services
Real-Time Co-optimization of Energy & Ancillary Services
Presentation transcript:

ORDC Options Analysis SAWG Market Analysis 12/16/2015

2 Contents Introduction Section 1: June 1, 2014 – October 31, 2015 Backcast Section 2: January 1, 2011 – December 31, 2011 Backcast Section 3: Sensitivity Analysis Section 4: Option 2: Add ORDC to DAM Section 5: Options 6 & 7: X = URS + RRS

3 Introduction

ERCOT Public | Top 4 Introduction Options for changing ORDC parameters were proposed at 11/13/2015 and 12/2/2015 SAWG. ERCOT was asked to analyze the options and present the following results: Additional PNM contributed by ORDC RTORPA # of hours histogram where RTORPA > $100/MWh, $500/MWh, $1000/MWh ERCOT was asked to analyze the following dates with actual FIPs: June 1, 2014 – October 31, 2015 January 1, 2011 – December 31, 2011 Market behavior changes after ORDC implementation, changes in SWOC, and changes in price floors will significantly affect the validity of 2011 backcast results. Since market behavior affects results in both periods, it is recommended to use the backcast only to compare options.

ERCOT Public | Top 5 Options Current ORDC implementation values are in red. See ORDC Options Whitepaper Redline from for more details.

ERCOT Public | Top 6 Section 1 June 1, 2014 – October 31, 2015 Backcast

ERCOT Public | Top 7 June 1, 2014 – October 31, 2015

ERCOT Public | Top 8 June 1, 2014 – October 31, 2015

ERCOT Public | Top 9 June 1, 2014 – October 31, 2015

ERCOT Public | Top 10 June 1, 2014 – October 31, 2015

ERCOT Public | Top 11 June 1, 2014 – October 31, 2015

ERCOT Public | Top 12 Probability of Falling Below Minimum Contingency Level on August 13, 2015 Min PRC at SCED snapshot on August 13, 2015 was MW

ERCOT Public | Top 13 Section 2 January 1, 2011 – December 31, 2011 Backcast

ERCOT Public | Top 14 January 1, 2011 – December 31, 2011

ERCOT Public | Top 15 January 1, 2011 – December 31, 2011

ERCOT Public | Top 16 January 1, 2011 – December 31, 2011

ERCOT Public | Top 17 January 1, 2011 – December 31, 2011

ERCOT Public | Top 18 January 1, 2011 – December 31, 2011 * Price response at $75 significantly reduces non-summer month prices for all options

ERCOT Public | Top 19 Probability of Falling Below Minimum Contingency Level on August 3, 2011 Min PRC at SCED snapshot on August 3, 2011 was MW

ERCOT Public | Top 20 Section 3 Sensitivity Analysis

ERCOT Public | Top 21 Sensitivity Analysis Offline and available resources had varying levels of startup time and startup cost. Assuming that all those resources will be online any time prices were greater than a particular level might indicate over commitment. Hence, a sensitivity analysis was done to show a range of outcomes: 1.Price response any time prices were greater than $75/MWh 2.Price response when prices go above $75/MWh for 2 hours 3.Price response any time prices were greater than $250/MWh 4.Price response when prices go above $250/MWh for 2 hours 5.No price response 2 hours was estimated based on average start times, start costs, and time needed to recover average start costs.

ERCOT Public | Top 22 June 1, 2014 – October 31, 2015 (Sensitivity)

ERCOT Public | Top 23 June 1, 2014 – October 31, 2015 (Sensitivity)

ERCOT Public | Top 24 January 1, 2011 – December 31, 2011 (Sensitivity)

ERCOT Public | Top 25 January 1, 2011 – December 31, 2011 (Sensitivity)

ERCOT Public | Top 26 Section 4 Option 2: Add ORDC to DAM Snapshot from August 13, 2015 as an example

ERCOT Public | Top 27 August 13, 2015 – HE 17

ERCOT Public | Top 28 August 13, 2015 – HE 17 This table highlights points on the curve from the previous slide

ERCOT Public | Top 29 Section 5 Options 6 & 7: X = URS + RRS A look at the 2016 AS methodology values

ERCOT Public | Top 30 URS + RRS from 2016 Ancillary Service Methodology Without RRS floored at 2750 MW

ERCOT Public | Top 31 URS + RRS from 2016 Ancillary Service Methodology With RRS floored at 2750 MW

ERCOT Public | Top 32 For data and additional details, please see the following posted files on the 12/16/2015 SAWG Meeting Page: SAWG ORDC Options Analysis 2011 Data.xlsx SAWG ORDC Options Analysis 2014 – 2015 Data.xlsx Further Information

ERCOT Public | Top 33 End