Faculty of Applied Sciences, Dept of Computing, Engineering and Technology ATF 202 – Project Risk Management Alan Stafford Project Manager, AMAP/Digital.

Slides:



Advertisements
Similar presentations
Project management.
Advertisements

Chapter 7 Managing Risk.
PROJECT RISK MANAGEMENT
Note: See the text itself for full citations. Information Technology Project Management, Seventh Edition.
Risk Analysis & Management. Phases Initial Risk Assessment Risk Analysis Risk Management and Mitigation.
Service Design – Section 4.5 Service Continuity Management.
Chapter 7: Managing Risk
Risk Management Chapter 7.
Projmgmt-1/33 DePaul University Project Management I - Risk Management Instructor: David A. Lash.
Project Risk Management
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 COMP201 Project Management.
Software project management (intro)
The Australian/New Zealand Standard on Risk Management
Chapter 8 Risk Analysis Management of Computer System Performance.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
Project Management Hoang Huu Hanh, Hue University hanh-at-hueuni.edu.vn.
8 Managing Risk Teaching Strategies
Effectively applying ISO9001:2000 clauses 5 and 8
贾银山 Software Engineering, Chapter 5 Slide 1 Project management.
©Ian Sommerville 2000Software Engineering, 7th edition. Chapter 5 Slide 1 Chapter 5 Project Management Modified by Randy K. Smith.
Project management DeSiaMore 1.
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
Project Risk and Cost Management. IS the future certain? The future is uncertain, but it is certain that there are two questions will be asked about our.
Chapter 11: Project Risk Management
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Concerned with activities involved in ensuring that software is delivered: on.
Chapter 10 Contemporary Project Management Kloppenborg
Risk management process
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
Managing Risks in Projects. Risk Concepts The Likelihood that some Problematical Event will Occur The Likelihood that some Problematical Event will Occur.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Risk Management Project Management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Project Management By: Dr Madhu Fernando Project Risk Management
Chapter 11: Project Risk Management
1 Chapter 5 Project management. 2 Project management : Is Organizing, planning and scheduling software projects.
Chapter 7 Managing risk and quality. Learning objectives discuss the importance of risk in a project and how it can be managed explain the processes of.
Management & Development of Complex Projects Course Code MS Project Management Risk Management Framework Lecture # 22.
Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Chapter 15: Risk Management
©Ian Sommerville 2000 Slide 1 Project management l Organising, planning and scheduling software projects l Objectives To introduce software project management.
Risk management (lecture). D efinitions of risk General: standard deviation Finance: volatility of return and costs Risk in project management (Lockyer.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Chapter 3 Project Management Chapter 3 Project Management Organising, planning and scheduling software projects.
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
Project Management IV1021Fö5 Risk Management. Agenda Project Risk Project Risk Management The Risk Management Process Goal: get an understanding of basic.
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
SOFTWARE PROJECT MANAGEMENT
1 Project management. 2 Topics covered Management activities Project planning Project scheduling Risk management.
Project Risk Management Planning Stage
The Risk Management Process
Risk Management. 7–2 Where We Are Now 7–3 Risk Management Process Risk –Uncertain or chance events that planning can not overcome or control. Risk Management.
Information Technology Project Management Managing IT Project Risk.
University of Sunderland CIFM02 Unit 5 COMM02 Project Hazard Management and Contingency Planning Unit 5.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Project management 1/30/2016ICS 413 – Software Engineering1.
1 Project Management C53PM Session 4 Russell Taylor Staff Work-base – 1 st Floor
RISK MANAGEMENT FOR COMMUNITY EVENTS. Today’s Session Risk Management – why is it important? Risk Management and Risk Assessment concepts Steps in the.
Stoimen Stoimenov QA Engineer SitefinityLeads,SitefinityTeam6 Telerik QA Academy Telerik QA Academy.
LECTURE 7 AVIATION SAFETY & SECURITY
Project management (2) By: Zhou Chunlin School of Tourism, Conference and Exhibitions Henan University of Economics and Law.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Project management. Software project management ■It is the discipline of planning, organizing and managing resources to bring about the successful completion.
Chapter 3 Project Management Parts of this presentation is extracted from Ian Sommerville’s slides located at
Ashima Wadhwa.  Probably the most time-consuming project management activity.  Continuous activity from initial concept through to system delivery.
1 Project management Organising, planning and scheduling software projects.
Risk Management.
8 Managing Risk (Premium).
Chapter 11: Project Risk Management
Risk management Chapter 7 Copyright ©2016 Pearson Education, Inc.
Risk management.
Risk management.
Presentation transcript:

Faculty of Applied Sciences, Dept of Computing, Engineering and Technology ATF 202 – Project Risk Management Alan Stafford Project Manager, AMAP/Digital Factory project

Learning outcomes: What is meant by the term risk in the context of projects Be aware of the significance of risk and its role in project management Understand the meaning of Hazard, Risk & Importance Understand the elements and intent of Risk Analysis and purpose of a risk register Understand the elements and intent of Risk Management Cultural nature of risk management Faculty of Applied Sciences, Dept of Computing, Engineering and Technology ATF 202 – Project Risk Management

 We live with RISK every day  How do you assess risk?  80 mph on motorway?  40 mph past a primary school?  Aren’t you making a mental sum of the likelihood of an incident and the consequences?  Do you think differently for something new as opposed to a regular activity?  Do you reflect before action, during and after? Introduction & reflection

 Are we rational about risk? Which is the greater risk, MMR vaccine, Nuclear Power, Flight or everyday Driving ? What about cycling in traffic?

 If you were managing a project would the everyday way you deal with risk be good enough?  What if something went fatally wrong?  What if an occurrence adversely affected the project delivery and you incurred a penalty?  What if you left part way through the project? Introduction & reflection

Risk in Projects What is different about Risk in projects and everyday life? Why are project managers particularly concerned with risk?

Risk in Projects  Projects are one off undertakings as opposed to operations where things are tried and tested.  Therefore greater likelihood of things going wrong  Consequences (magnitude) can be serious  Need to have a robust approach

Basic concepts of Risk Terminology and concepts

Basic concepts of Risk Risk = “The possibility of suffering harm or loss” (as a result of exposure to the hazard) Importance = Likelihood x Magnitude A Hazard = something that has potential to cause harm or loss e.g. delays, cost, failure What are the hazards, risks & importance for The turkey? The cooks “project”?

Risk in Projects  What kinds of risk affect projects? Technical failure Project Risks (internal) Human error Acts of nature Business failure due to Political, Economic, Technological, Social, Legal, Environmental changes Consequence: Project becomes invalid Responsibility of Senior management Part of the Business Case Consequence: Deviation from the project Physical financial Schedule Business Risks (external)

Risk in Projects  What kinds of risk affect projects? Technical failure Project Risks (internal) Human error Acts of nature Responsibility of the Project Manager Consequence: Deviation from the project Physical financial Schedule

Methodologies To ensure consistency and quality of approach it is normal to follow a recognised methodology

 There are various frameworks and models to help deal with risk and they are all very similar Project Management Institute Methodologies

Methodology All methods can be broken down into : “Risk Analysis” & “Risk Management” We will follow the Project Management Institute model

Methodology

1) Risk Identification 2) Risk Quantification Two key concepts – Hazard and risk What is a hazard? A Hazard- something that has potential to cause harm to a project e.g. delays, cost, failure What is a Risk? Risk = “The possibility of suffering harm or loss from exposure to a hazard”. Risk Analysis

1) Risk Identification 2) Risk Quantification Two key concepts, Hazard and risk Risk Analysis Hazard? Risk (magnitude x likelihood)? What would be the consequences? For the individuals concerned? For you & the firm? For the delivery of the project?

1) Risk Identification 2) Risk Quantification Two key concepts, Hazard and risk Risk Analysis Hazard? Risk (magnitude x likelihood)?

 Generic hazards, e.g.  People factors  experience and appropriateness of experience  skills, turn-over rate, level of absenteeism  cultural differences Risk Analysis 1) Risk Identification 2) Risk Quantification What is a hazard?  Project specific hazards, e.g.  Application specific factors  the nature of the application  complexity of the project  the size and cost of the project

 Generic hazards, e.g.  People factors  e.g. experience and appropriateness of experience  skills, turn-over rate, level of absenteeism  Project specific hazards, e.g.  Application specific factors  the nature of the application  Complexity of the project  the size and cost of the project Risk Analysis 1) Risk Identification 2) Risk Quantification Think about where can things go wrong? Inputs might be:  Product breakdown structure – impact on cost, quality, schedule  Work breakdown structure  Estimates – optimistic, pessimistic?  Team (experienced/inexperienced)  Similar project to another or new ground? What is a hazard?

 Two main approaches  Use of checklists  Brainstorming When would you use each method?  Knowledge based software is also available to help with the task of hazard identification Risk Analysis 1) Risk Identification 2) Risk Quantification Hazard & Risk? Generic hazards Project specific hazards

 How do we put a value on the risks identified?  This may feed back to senior management (go/no go)  May influence the contingency funding/planning Risk Analysis 1) Risk Identification 2) Risk Quantification

Risk Analysis 1) Risk Identification 2) Risk Quantification  Once identified risks should be assessed for their possible affect on the project  The level of importance or priority of a risk must also be established.  This is often done by assessing the risk value  Possible to use qualitative/quantitative methods

Risk Analysis 1) Risk Identification 2) Risk Quantification Marginal - Minimal effect on project e.g. project approval delays Minor – Some effect on project e.g. delay, change in personnel/suppliers Intermediate – Significant effect on project e.g. cost overrun > 10%, equipment not fit for purpose Major - Severe effect on project e.g. project failure, major injury to personnel, Qualitative method of displaying risk

Risk Analysis 1) Risk Identification 2) Risk Quantification Advantage of qualitative methods is that they are easily understood from an overall point of view – showing those risks which need attention. Doesn’t show the “value” of the risk, i.e. the expected cost

Risk Analysis 1) Risk Identification 2) Risk Quantification  Risk impact is often estimated in monetary terms  Risk likelihood is assessed as a probability  Risk exposure therefore is an expected cost

Risk Analysis 1) Risk Identification 2) Risk Quantification Hazard Likelihood Impact Exposure 1Changes to the requirements1 8 8 specification during coding 2Specification take longer than expected 3Staff sickness affecting critical path activities 4Staff sickness affecting non-critical activities Quantitative method of displaying risk

Risk Analysis 1) Risk Identification 2) Risk Quantification Hazard Likelihood Impact Exposure 1Changes to the requirements10% £8k £800 specification during coding 2Specification take longer than10% £6k £600 expected 3Staff sickness affecting30% £20k £6,000 critical path activities 4Staff sickness affecting60% £3k £1,800 non-critical activities Quantitative method of displaying risk, can be shown in monetary terms

Risk Analysis 1) Risk Identification 2) Risk Quantification Output from this process is a Risk Register

Methodology So we have covered the two elements of Risk Analysis using the PMI methodology And have a Risk Register

Methodology Having identified & quantified the risk what are we going to do about it? That’s where Risk Management comes in

Risk Management  Having identified the major risks and allocated priorities, the next task is to decide how to deal with them and there are 3 main options 3) Response Development 4) response Control

Risk Management  3 options 3) Response Development 4) response Control  Risk acceptance  Risk avoidance  Mitigation  Risk reduction  Risk transfer  Contingency

Risk Management  Risk acceptance  Risk avoidance  Mitigation  Risk reduction  Risk transfer  Contingency  Unlikely occurrences  Things you can’t do anything about  “Acts of God”  Could also be something where the fix costs more than the problem! 3) Response Development 4) response Control

Risk Management  Risk acceptance  Risk avoidance  Mitigation  Risk reduction  Risk transfer  Contingency  Attempts to “Design Out” the risk  Avoid the activity or issue, but  by doing so may introduce another 3) Response Development 4) response Control

Risk Management 3) Response Development 4) response Control  Risk acceptance  Risk avoidance  Mitigation  Risk reduction  Risk transfer  Contingency  Reduce either likelihood and/or the impact so that it is acceptable, e.g.  ensure expert is used to reduce risk of failure

Risk Management 3) Response Development 4) response Control  Risk acceptance  Risk avoidance  Mitigation  Risk reduction  Risk transfer  Contingency  Transfer the impact, e.g.  Insurance policy – known cost v impact  Particularly lends itself to physical risks  Your own car or house insurance  Penalty clause with supplier  Benefit: reduce likelihood & impact

Risk Management 3) Response Development 4) response Control  Risk acceptance  Risk avoidance  Mitigation  Risk reduction  Risk transfer  Contingency  Holding something in reserve – should the worst happen, e.g.  Reserve funds  Playing safe  Add additional time to uncertain process  Backup supplier/plan Activated when a trigger takes place, i.e. Response Control

Risk Management 3) Response Development 4) response Control Risk management plan is a response to, and an extension of, the Risk Register Details of responses are recorded and the trigger points that bring them into action

Risk Management 3) Response Development 4) Response Control Ongoing activity throughout the project, part of the plan-action-monitor-control cycle  No matter how thorough the Risk Analysis unforeseen events will arise.  Control can be broken down into  Passive &  Active responses

Risk Management 3) Response Development 4) Response Control  Passive control  Ensuring steps in Response Development are implemented at triggers  Active control  Constant monitoring of triggers  May be part of a risk calendar for example.  Work arounds for unseen occurrences  Last resort/necessary evil – to be avoided.

Summary  Projects are one off undertakings -therefore more risk than normal operations  Terminology – Hazard, Risk, Importance  Methodology – Various standards  Typically consist of elements that can be broken down into:  An example is:

Summary  Risk management is a culture  not a paper exercise or bolt on  has strategic implications, e.g. damage to reputation, loss of future business  Generally more successful if team based  Risk owned by individuals but all contribute  Contributes to “ownership” and “buy-in”  No-Fear culture, i.e. don’t shoot the messenger  Encourage a “learning organisation”  Not a cost but a saving

Faculty of Applied Sciences, Dept of Computing, Engineering and Technology ATF 202 – Project Risk Management Q & A