ALICE TPC Gas Control System (toward the first fully implemented LHC gas system) S. Haider EP-TA1-GS.

Slides:



Advertisements
Similar presentations
European Organization for Nuclear Research LHC GCS Recipes Geraldine Thomas 11 December 2009.
Advertisements

JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
ALICE TPC Ne/CO2 Gas System. Mixing Rack CO 2 -Removal & (O 2,H 2 O)- Cleaning Rack.
P.C. Burkimsher Alice DCS Workshop 18 March 2002 (Updated 27 March 2003) PVSS - How to get started Paul Burkimsher IT Division COntrols Group Support Services.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
Lukasz ZwalinskiLHCb CO 2 cooling; 1 IBL CO 2 cooling control system Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Michal Zimny,
IBL CO 2 UNICOS CPC6 based control system Lukasz Zwalinski – PH/DT/PO.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
LHC Gas Control System Stefan Haider EP-TA1-GS ALICE DCS workshop, S.Haider2 Outline Introduction and working philosophyIntroduction and working.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
SCADA Systems - What is the scope of this talk? What are SCADA systems? What are their structure and main features? How open are they? How are they evolving?
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
European Organization for Nuclear Research LHC Gas Control System Applications G.Thomas, J.Ortola Vidal, J.Rochez EN-ICE Workshop 23 April 2009.
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
11/03/2003LHC GCS - JCOP ER1 LHC GCS Renaud Barillère – CERN IT-CO.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
Wayne Salter, CERN The LHC Experiments’ Joint Controls Project Framework ALICE DCS Day 10 th September 2001.
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
Naming and Code Conventions for ALICE DCS (1st thoughts)
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
MARCO UNICOS based control system CERN Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
1 UNICOS PVSS Evolution Cryogenics Control Enrique BLANCO Industrial Controls & Electronics Group.
Status of Farm Monitor and Control CERN, February 24, 2005 Gianluca Peco, INFN Bologna.
Chiller control system Lukasz Zwalinski – PH/DT.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
1 JCOP-UNICOS. 2 Purpose of this meeting Requested by IT/CO To present you the UNICOS requirements on the hierarchy classifications Not to discuss the.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
PVSS: Windows  Linux. 13th May Outline Current software architecture PVSS on Linux Demo What has to be redone for Linux console Vacuum, GCS, cryogenics.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
“The LHC GCS Framework” Geraldine Thomas CERN, IT-CO A complete PLC and PVSS automatic code Generation.
Configuration database status report Eric van Herwijnen September 29 th 2004 work done by: Lana Abadie Felix Schmidt-Eisenlohr.
60kW Thermosiphon control system
Atlas Gas Systems - CPC6 Upgrade and Re-Commissioning Infrastructure Meeting – 8th January 2014 Steve Pavis PH-DT-DI/Gas.
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
UNICOS F RAMEWORK Enrique BLANCO* Industrial Controls & Electronics Group Engineering Department, CERN Geneva, Switzerland * On behalf of the UNICOS team.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
Gas system for NA62 Straw detector Roberto Guida On behalf of Gas Service Team NA62 Straw working meeting, March 26, 2012 Outline: P&I Drawing Schedule.
JCOP - 17 October 2001NA60_GAZ - E. Mazel J. Rochez1 A Project for the GAS control System At NA60.
Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS.
Quality Assurance for LHC Gas Systems Stefan Haider / EP-TA1.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
Chiller + Brine + Water control system UNICOS CPC Lukasz Zwalinski – PH/DT.
Database Issues Peter Chochula 7 th DCS Workshop, June 16, 2003.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
C. Kiesling, 11th B2GM PXD Session, KEK, March , Slow Control System for the PXD PXD Support Systems & Control UNICOS Standard PVSS User Interface.
1 Cryogenics Instrumentation & Controls Commissioning for the LHC AB/CO viewpoint Enrique Blanco AB/CO IS.
Alice TOF Production Readiness Review Gas Control Systems.
Experience in Design and Implementation of CO2 Cooling Control Systems
Gas system Commissioning procedures and status
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
Gas System Commissioning
Robert Gomez-Reino Garrido
Presentation transcript:

ALICE TPC Gas Control System (toward the first fully implemented LHC gas system) S. Haider EP-TA1-GS

ALICE TPC gas system status, JCOP S.Haider EP/TA1 Outline Status What did we learn so far Future Conclusion

ALICE TPC gas system status, JCOP S.Haider EP/TA1 Project status (June 2003) Gas HWe-boxPLCPVSScommissioned Mixer Pump CO2-rem. 80%0% Purifier 60%80%0% Distribution 0% Analysis 30%0% Exhaust 0% Backup 30%00% Test in % of Gas HW 100% done

ALICE TPC gas system status, JCOP S.Haider EP/TA1 PVSS Schneider PLC Quantum Schneider PLC Premium Ethernet ProfiBUS WAGO I/O modules Bronkhorst Digital Mass Flow Controllers Control Architecture (for Mixer)

ALICE TPC gas system status, JCOP S.Haider EP/TA1 Typical 2 gas Mixer Control box,- ProfiBUS WAGO interface

ALICE TPC gas system status, JCOP S.Haider EP/TA1 ALICE TPC Mixer rack ProfiBUS-daisy-chain of 4 Mass Flow Controllers

ALICE TPC gas system status, JCOP S.Haider EP/TA1 Using UNICOS… Premium and Quantum (with UNICOS + GCS extension) PVSS (Unicos Beta3 and GCS extensions) Mass Flow Controller, Analog Valve and Frequency controller were originally not in UNICOS (developed by IT/CO)

ALICE TPC gas system status, JCOP S.Haider EP/TA1

ALICE TPC gas system status, JCOP S.Haider EP/TA1 Window tree Modules

ALICE TPC gas system status, JCOP S.Haider EP/TA1 M

ALICE TPC gas system status, JCOP S.Haider EP/TA1 Modes of operation

ALICE TPC gas system status, JCOP S.Haider EP/TA1

ALICE TPC gas system status, JCOP S.Haider EP/TA1

ALICE TPC gas system status, JCOP S.Haider EP/TA1

ALICE TPC gas system status, JCOP S.Haider EP/TA1 What did we learn so far? (1/3) Development  Gas racks and software can be prepared in parallel  Simplified HW drawings were necessary for user panels  SW was tested in the lab without the gas HW ready Process control  Validation of UR states, alarms, commands, etc  Validation of PLC code design  Validation of the UNICOS concept for gas control  UNICOS not easy to start with!

ALICE TPC gas system status, JCOP S.Haider EP/TA1 What did we learn so far? (2/3) PVSS  UNICOS Beta version,- but most of functionality available (~80%)  Validation of window layers, navigation menus etc…  Long way to go for trending !!! Operation  Common look and feel of all Process Control Objects (PCO)  Access of objects in Auto/Manual mode  Recipes for constants, alarms and parameters  FSM based operation

ALICE TPC gas system status, JCOP S.Haider EP/TA1 What did we learn so far? (3/3) Commissioning  After short introduction we were able to operate and fine tune process parameters without the help of the developers  Easily understandable menu structures and concepts of operation  FAST! Took only about 1 week!

ALICE TPC gas system status, JCOP S.Haider EP/TA1 Future plans Alice TPC  Remaining Racks  System integration In 167 with dummy volume Validation of interaction UR identification for top module UNICOS  Porting to UNICOS PVSS release (before system integration)

ALICE TPC gas system status, JCOP S.Haider EP/TA1 GCS framework  Once developed, ALICE TPC will be ported to this gas framework  Rem: Some gas framework components are already used Low level objects in PLC and PVSS Synoptic of PVSS Recipes…

ALICE TPC gas system status, JCOP S.Haider EP/TA1 Conclusion The first “Vertical Gas Slice” with final architecture was successfully implemented and tested. (Visits welcome) We validated: URD, UNICOS for gas, PLC code generation, PVSS, operation issues, PID regulation etc.. Started development of Gas Frame Work with the experience gained