EDM collaboration meeting WBS 9.0: Slow controls, Simulations, DAQ/data analysis Chris Gould- North Carolina State University and Triangle Universities.

Slides:



Advertisements
Similar presentations
Make This work with EPICS! 2006
Advertisements

1 1999/Ph 514: Channel Access Concepts EPICS Channel Access Concepts Bob Dalesio LANL.
EPICS Noboru Yaamamoto Jan 27, 2009 for EPICS seminar at RRCAT, Indore Installing EPICS.
Experimental Facilities Division ANL-ORNL SNS Experimental Data Standards (Status) Richard Riedel SNS Data Acquisition Group Leader.
Applying Wireless in Legacy Systems
Peter Chochula CERN-ALICE / Dpt. Of Nucl. Physics MFF UK Bratislava Queued... HTTP IPX,SPX Component Client Component Client COM Component Client COM DCE-RPC.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
Experimental Physics and Industrial Control System (EPICS) Overview Bob Dalesio, Dec, 2002.
Plans for EPICS in Hall D at Jefferson Lab Elliott Wolin EPICS Collaboration Meeting Vancouver, BC 30-Apr-2009.
Elder Matias Canadian Light Source University of Saskatchewan CLS – Control System Overview.
14th April 1999Hepix Oxford Particle Physics Site Report Pete Gronbech Systems Manager.
Single Board Computers and Industrial PC Hardware at the CLS
A+ Guide to Managing and Maintaining Your PC Fifth Edition Chapter 22 All About SCSI.
1 Jim Miller Boston University Chicago meeting, June 6-8, 2007 Slow Controls, Simulations and DAQ/Data Analysis— WBS 1.7.
Shuei MEG review meeting, 2 July MEG Software Status MEG Software Group Framework Large Prototype software updates Database ROME Monte Carlo.
Bring The Best to VeriSign. 2 VM3:Software Engineer –Network Operations Req # : 175,183 Position : Software Engineer - Network Operations Job Description.
Upgrade to Real Time Linux Target: A MATLAB-Based Graphical Control Environment Thesis Defense by Hai Xu CLEMSON U N I V E R S I T Y Department of Electrical.
Readout & Controls Update DAQ: Baseline Architecture DCS: Architecture (first round) August 23, 2001 Klaus Honscheid, OSU.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
CLS: Control System E. Matias, R. Berg, G. Wright, T. Wilson, T. Johnson, R. Tanner and H. Zhang Canadian Light Source University of Saskatchewan Invited.
Experimental Physics and Industrial Control System (EPICS) Overview Bob Dalesio, June 24, 2001.
Operated by Los Alamos National Security, LLC for NNSA U N C L A S S I F I E D LDAQ – the New Lujan Center Data Acquisition Application Frans Trouw, Gary.
SNS Integrated Control System EPICS Recent Applications and Future Directions Bob Dalesio June 12, 2001.
Introduction to EPICS (Ned Arnold, John Maclean).
Independent front-end read out subsystems for 17 detectors in three underground sites. All electronics modules of each subsystem are reside in one VME.
Experimental Physics and Industrial Control System (EPICS) Overview Bob Dalesio, May 11, 2000.
1 Introduction to UniDAQ Makoto Yoshida (Osaka Univ.) MICE DAQ 2005/9/1.
1 The Five Parts of an Information System
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
Issues in Accelerator Control Bob Dalesio, December 23, 2002.
A First Look at the June Test Beam DAQ Hardware architecture Talk Presented 8 April, 2008 John Anderson HEP Electronics Group Argonne National Laboratory.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
E. Beise, U Maryland Revisit the EDM sensitivity E. Beise, U Maryland Oct 2007 collaboration meeting Boston, MA starting points: Golub & Lamoureaux, Phys.
CDMS Computing Project Don Holmgren Other FNAL project members (all PPD): Project Manager: Dan Bauer Electronics: Mike Crisler Analysis: Erik Ramberg Engineering:
1 EIR Nov 4-8, 2002 DAQ and Online WBS 1.3 S. Fuess, Fermilab P. Slattery, U. of Rochester.
DoE Review January 1998 Online System WBS 1.5  One-page review  Accomplishments  System description  Progress  Status  Goals Outline Stu Fuess.
Connecting LabVIEW to EPICS network
Takeyasu Ito University of Tennessee/Oak Ridge National Laboratory EDM Cost and Schedule Review February, 2005 Beam Splitter / State Selector, Polarizing.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Slow controls R and D Chris Gould North Carolina State University and TUNL.
Computing at SSRL: Experimental User Support Timothy M. McPhillips Stanford Synchrotron Radiation Laboratory.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
1 1999/Ph 514: Supported Hardware EPICS Supported Hardware Ned D. Arnold APS.
EPICS Noboru Yaamamoto July 11, 2006 for EPICS seminar at VECC,Kolkata Installing EPICS.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
1 Channel Access Concepts – IHEP EPICS Training – K.F – Aug EPICS Channel Access Concepts Kazuro Furukawa, KEK (Bob Dalesio, LANL)
EDM Fast Start Presentation WBS 11 – Assembly and Commissioning Vince Cianciolo, Paul Huffman May 23, 2006.
Hardware/Software Co-Verification with RTOS Application Code Michael Bradley, Mentor Graphics Kainian Xie, Hyperchip Inc.
Moving the NPDGamma Experiment to the SNS FnPB Christopher Crawford University of Kentucky overview of NPDGamma transition to the SNS expected.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
Software Tools for the ATLAS Superconducting Accelerator Maria Power Principal Engineer Accelerator Control Systems Argonne National Laboratory Workshop.
R&D Plan on Light Collection Takeyasu Ito Los Alamos National Laboratory.
An Introduction to Epics/Tango Steve Hunt Alceli EPICS Meeting 2008 INFN Legnaro 15 Oct 17:15.
JLab Accelerator Controls Matt Bickley MaRIE discussion April 26, 2016.
May 18th, 2003 RT2003, Montreal1/100 MIDAS Short Course Stefan Ritt (Paul Scherrer Institute, Switzerland) Pierre André Amaudruz (TRIUMF, Canada)
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
Integrating Advantech PCI I/O cards into EPICS. Outline ANTARES computer control and data acquisition systems architecture STAR computer control and data.
RF Control Electronics for Linacs Overview of activities at Electronics Division, BARC RF control electronics for: 1.Super-conducting Heavy Ion Linacs.
EPIC S Noboru Yaamamoto July 11, 2006 for EPICS seminar at VECC,Kolkata Installing EPICS.
Geant4 in the FNAL g-2 Experiment Kevin Lynch Boston University August 2009 g-2 Collaboration Meeting.
Dark Matter Search With an Ultra-low Threshold Germanium Detector proposed by Tsinghua University Seoul National University Academia Sinica Qian Yue.
ATF/ATF2 Control System
The ILC Control Work Packages
Initial Adaptation of the Advanced Regional Prediction System to the Alliance Environmental Hydrology Workbench Dan Weber, Henry Neeman, Joe Garfield and.
DAQ Architecture Design of Daya Bay Reactor Neutrino Experiment
Geant4 in HARP V.Ivanchenko For the HARP Collaboration
Channel Access Concepts
EPICS: Experimental Physics and Industrial Control System
Channel Access Concepts
Presentation transcript:

EDM collaboration meeting WBS 9.0: Slow controls, Simulations, DAQ/data analysis Chris Gould- North Carolina State University and Triangle Universities Nuclear Laboratory

Major subgroups Four sub tasks, divided into six work packages 9.1 Slow controls 9.2 Simulations 9.3 Data acquisition system 9.4 Data analysis

Slow controls EPICS (Experimental Physics and Industrial Control System) used to control the experiment (SNS, APS..) Five identical sub-systems for neutronics, cryogenics, He-3, inserts, and magnetic fields (N,C,H,I,M) N,C,H,I,M groups will select hardware compatible as much as possible with existing EPICS software Utilize Unix/Linux and VME to capitalize on existing software libraries at APS Deliver VME systems to subgroups to incorporate into their control systems

EPICS Supports a Standard Control System Architecture Workstations: Sun Hp DEC/Alpha Silicon Graphics PC OS: Unix, Some Windows I/O Controllers: VME,VXI PCI, Workstations OS: vxWorks, Unix, Windows RTEMS, RTLinux, L4 linux Field I/O Remote and Local I/O Buses: Control Net, PCI, CAN-Bus, Industry Pack, VME, VXI, PCI, ISA, CAMAC, GPIB, Profibus, Bitbus, Serial, Allen-Bradley, Modbus, Yokogawa, G-3, Ethernet/IP Field I/O Site LAN/WAN Field I/O Courtesy Bob Dalesio (APS)

Simulations Overall simulations/GEANT guru needed to coordinate efforts Neutronics: transport from the guide into the cell, plus inside and outside (n,gamma) backgrounds (UKY+..) Measurement cells: modeling n and 3He transport (spins and trajectories) and interactions (NC State, Caltech+..) Light transport: from initial uv production to pe’s per event at pm tubes (LANL+….) Experiment optimization: simulation of all aspects of a run cycle (Illinois?+..) B and E fields: full simulation of E and B fields in a complete experimental configuration (Caltech+…)

Neutronics simulations confirm input from SNS neutronics model for FNPB simulate neutron beam transport into measurement cell write code to analyze the neutron activation write code to analyze small angle scattering through windows write code to design collimation document summarizing results to collaboration simulate effect of neutron/gamma backgrounds write code to model beam-induced neutron/gamma backgrounds write code to model external neutron/gamma backgrounds document summarizing results to collaboration simulate required external neutron/gamma shielding write code to model requirements of external neutron/gamma shielding document summarizing results to collaboration

Experimental run cycle optimization simulation to optimize experimental run parameters write code to model 3He filling with polarization tracking/monitoring write code to model neutron filling with polarization tracking/monitoring write code to optimize EDM measurement sequence write code to model the application of fields to the measurement region write code to model the 3He removal document summarizing experimental run parameters

Measurement cell dynamics write code to model magnetic and electric fields into code simulate trajectories in measurement cells write code for UCN trajectories write code for 3He trajectories simulate spin dynamics in measurement cells write code for UCN spins write code for 3He spins Write code to model n-3He interactions document summarizing neutron cell dynamics

Light transport simulations write code to model UV propagation from capture event write code to model light down conversion process write code to model visible light transport write code to model detection, with estimates of photoelectron production write code to model afterpulse propagation and detection document summarizing light transport for collaboration

DAQ and data analysis simulation DAQ incorporates transient digitizers, cosmic rejection (maybe), and local analysis capability 1 kHz event rate at ~ 10kB/event = 10MB/sec 20 TB of data anticipated – archived locally and off site using RAID arrays and tape Need a fast DAQ/analysis system to supplement TD system Asssess need for cosmic rejection Simulation of afterpulsing needed to guide TD purchase specifications and DAQ needs

Cost Estimate – unburdened hardware Servers: 5 x ($20K +$12K) = $160K + $22K (vxworks) = $182K Clients: workstation x 4 +14TB RAID = $42K 9.2: DAQ: Transient digitizers etc. $57K Cosmic suppression system $100K 9.3: Simulations: 4 x ($7K) = $28K 9.4 Data analysis: 14TB RAID system + 20TB tape back up $39K Total unburdened hardware = $448K

Cost Estimate – totals Unburdened hardware = $448K (assume 100% capitalized)*1.10 contingency = $493K (last time: $378K for electronics, cables, computers; the difference is the cosmic suppression system) Software engineer 2579hrs*$92 = $237.2K Technician 506hrs*$63 = $30.9K Total personnel*1.10 contingency = $295K TOTAL ~$800K

Company LANL Current Date 5/23/2006 Title Electronics, Computers, Simulations, Data Analysis Project Start 10/16/2006 8:00:00 AM Project Finish 9/21/2008 5:00:00 PM

Staffing Plans While many tasks are nominally assigned, significant career advancement opportunities remain: Overall subsystem manager Work package coordinators for simulations, DAQ and data analysis Simulation guru with GEANT expertise particularly needed to lay out overall guidelines for subgroups EPICS experts/volunteers needed for all of five subsystems