Evaluation of Columbia River Sustained Hydro Peaking Capacity Eric King / Mary Johannis PNW Resource Adequacy Technical Committee Meeting May 31, 2006.

Slides:



Advertisements
Similar presentations
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Advertisements

Hydro Peaking Capacity Analysis & Northwest Regional Forecast Comparison Resource Adequacy Technical Committee July 28, 2010.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
TMT Presentation March 31, 2010 Scott English Water Quality Program Manager NWD Reservoir Control Center.
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
Genesys Model Enhancements October 4, 2011 NW Resource Adequacy Steering Committee Meeting Gwendolyn S Shearer.
April Runoff Forecasts for the Columbia Basin and Power Supply Implications Jim Ruff and John Fazio Council Meeting April 14, 2010 Boise, ID.
31 DECEMBER VARIABLE FLOOD CONTROL DRAFT FOR LIBBY RESERVOIR U.S. Army Corps of Engineers Northwestern Division, North Pacific Region.
EE535: Renewable Energy: Systems, Technology & Economics
Federal Columbia River Power System Operations Planning.
COLUMBIA RIVER SYSTEM OVERVIEW
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
contents INTRODUCTION. HYDRO POWER PLANT IN INDIA. WORKING.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
Prospects of Wind and Pumped Storage systems’ integration in Greek islands George Caralis Mechanical Engineer NTUA Wind Energy Laboratory.
California SONGS\OTC Plants Assumptions TEPPC – Data Work Group Call Tuesday, September 15, 2015.
Climate Change and The NW Power Supply Climate Impacts on the Pacific Northwest University of Washington April 21, 2009.
Hydro Power 102. Hydroelectric Models in the Northwest.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
Resource Adequacy Technical Committee Meeting April 6, 2011.
Developing an Adequacy Metric Resource Adequacy Forum Technical Subcommittee Meeting October 16, 2009.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
Revising the Pacific Northwest Resource Adequacy Standard Resource Adequacy Technical Committee June 23, 2011.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Visit by Government Officials from Mozambique COLUMBIA RIVER SYSTEM BRIEFING III U.S. Army Corps of Engineers Northwestern Division North Pacific Water.
Loss of Load Probability (LOLP) Project October 16, 2009 Resource Adequacy Technical Committee Meeting.
Illustrative FCRPS Examples Comparing Capacity Adequacy Calculations for Federal Hydro- Dominated System Mary Johannis PNW Resource Adequacy Technical.
Comparison of LOLP Practices Mary Johannis PNW Resource Adequacy Technical Committee Mtg January 23, 2009.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
Proposed Contract to Perform Regional Sustained Hydro Peaking Capability Study Mary Johannis PNW Resource Adequacy Steering Committee January 29, 2008.
May 31, Resource Adequacy Capacity Standard Resource Adequacy Forum Technical Committee May 31, 2006 Background Image: Bennett, Christian Science.
June 27, Pacific Northwest Resource Adequacy Assessment for 2010 and 2012 Resource Adequacy Forum Steering Committee Meeting Northwest Power Pool.
Evaluating Hydro Capacity for Capacity Adequacy Standard: Selection of Hydro Events Mary Johannis PNW Resource Adequacy Technical Committee Mtg November.
Evaluating Hydro Capacity for Capacity Adequacy Standard: Selection of Hydro Events Eric King/ Mary Johannis PNW Resource Adequacy Technical Committee.
Guidance for Utility Adequacy Assessments Steering Committee Meeting January 29, 2010.
January 29, 2010Resource Adequacy Steering Committee 1 Sustained Peaking Capacity Analysis Initiated by the Adequacy Forum Input Information from Utilities.
Relationship of Regional Resource Adequacy Standards to Utility Planning PNW Resource Adequacy Steering Committee Meeting June 27, 2007.
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
USACE Managing a Drought  Overview  Timeline  Depletion Scenario Current Status– 17 Oct 07.
2009 Pacific Northwest Resource Adequacy Assessment Resource Adequacy Technical Committee October 16, 2009.
Mid-Columbia Coordinated Hydro Operations Model John C. Howard CddHoward Consulting Ltd. CEATI 2009.
HMTF Update TAS Nov 3-4, 2015 Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Work Group - Chair.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Moving toward a Final Resource Adequacy Standard Resource Adequacy Forum Steering Committee Meeting September 27, 2007.
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Steering Committee Meeting April 13, 2007.
Work Plan Resource Adequacy Forum Technical Committee July 29, 2009.
Capacity Metric & Hydro Capacity Assessment Decisions Mary Johannis PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
September 28, 2012 Draft Assessment Results Technical Committee Meeting September 28,
Out of Region Market Assumption Resource Adequacy Technical Committee December 1, 2011.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
Pacific Northwest Resource Adequacy Assessment for 2011 and 2013 Resource Adequacy Forum Steering Committee Meeting July 21, 2008.
CEC/CPUC Energy Storage Workshop LADWP Pumped Hydro John R. Dennis LADWP Director Power Planning & Development November 20,
Sustained Hydro Peaking Capacity Contract with Don Long Finalizing Phase II SOW Mary Johannis PNW Resource Adequacy Technical Committee Mtg January 23,
Defining LOLP Resource Adequacy Forum Technical Subcommittee Meeting November 14, 2008.
2010 Northwest Regional Forecast Resource Adequacy Technical Committee April 22, 2010.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Yuma Agriculture Water - Rights and Supply Terry Fulp Director, Lower Colorado Region Yuma Agriculture Water Conference January 13, 2016.
Power Supply Adequacy for the 2021 Operating Year Resource Adequacy Advisory Committee Steering Committee Webinar June 8, 2016.
HYDRO ELECTRIC POWER PLANTS BY Prabhakaran.T AP/MECH
Steering Committee Webinar March 25, 2016
Resource Adequacy Assessment for 2015 Interim Results Resource Adequacy Forum Technical Committee Meeting July 28, 2010.
Technical Committee Meeting March 18, 2016
Progress on Resource Adequacy Assessment for 2017
Presentation transcript:

Evaluation of Columbia River Sustained Hydro Peaking Capacity Eric King / Mary Johannis PNW Resource Adequacy Technical Committee Meeting May 31, 2006 PNGC Offices, Portland, OR

May 31, 2006PNW Resource Adequacy Technical Committee Mtg 2 Steering Committee Adopted Form of Capacity Metric and Target Metric = Planning Reserve Margin Using 1 in 2 Loads Contingencies such as cold snap loads reflected in reserve margin 5-7% Contingency Reserve x % Outage Uncertainty y % Adverse Load & Load Forecast Uncertainty

May 31, 2006PNW Resource Adequacy Technical Committee Mtg 3 Comparison of FCRPS Capacities FCRPS Installed Hydro Cap= 21,500 MW 1 Hour Sustained Hydro Cap= 17,200 MW 10 Hour Over 5 Days Sustained Hydro Cap= 15,600 MW Sustainable Operational Cap= 11,200 MW Sustained Hydro Peaking Capacities White Book

May 31, 2006PNW Resource Adequacy Technical Committee Mtg 4

May 31, 2006PNW Resource Adequacy Technical Committee Mtg 5 Comparison of Reservoir Storages Operation to Meet Average Loads FCRPS Combined EOM Storage in Feb FCRPS Combined EOM Storage in Feb Operation to Meet Cold Snap Loads

May 31, 2006PNW Resource Adequacy Technical Committee Mtg 6 What Target Means to FCRPS FCRPS Cap to Meet 1 in 2 Load Planning Reserve Capacity No Resource Adequacy Acquisitions needed unless FCRPS cap to meet 1 in 2 loads + Planning Reserve is > 15,600 MW

May 31, 2006PNW Resource Adequacy Technical Committee Mtg 7 Pilot Study: Evaluation of Sustained Peak Hydro Capacity under a Worst Case Scenario

May 31, 2006PNW Resource Adequacy Technical Committee Mtg 8 Hydro Generation Results Capacity MWs (Hydro) 1 HR2 HR4 HR10 HR FCRPS17,23717,16317,10515,757 FCRPS & MID-Cs 21,45821,36221,29819,731

May 31, 2006PNW Resource Adequacy Technical Committee Mtg 9 We know that we have over MW of installed capacity, yet we are unable to generate this. Why, because: – We know we hold some capacity out for reserves –We have some turbines out for maintenance –Fore bay and tail water elevations all impact head, which impact capacity –water supply –Operating limitations –other impacts All the above impacts our instantaneous and sustained capacity.

May 31, 2006PNW Resource Adequacy Technical Committee Mtg 10 The system operated to full hydraulic extent (i.e. LIB, HGH, and DWR are operating to their full unit availability. GCL is allowed to draft up to 2 feet/day, the Snake and Lower Columbia projects operate with in their full normal operating range). NOTE: This constitutes a sustained draw down of the FCRPS. This type of analysis takes water from future periods, which will need to be accounted for later. For example, over the 5 day period: –Libby is drafted 5.5 feet; –HGH is drafted 3.5 feet, –DWR is drafted 7 feet; –and GCL is drafted 8 feet over and above what they normally would have been

May 31, 2006PNW Resource Adequacy Technical Committee Mtg 11 The system operated to full hydraulic extent (continued) LOWER SNAKE: The longer the sustained Peak – the lower the Peak MID-C: Rocky Reach and Rock Island – The 50 hour sustained Peak small lowering of their Peak Wanapum and Priest operate close to full all hours (with some spill) LOWER COLUMBIA: Operate close to full discharge