Erie Consolidated Lime Co.Lakeview Building Materials SW 101 - Yard Throat SW 97 - Lakeview West Dame MouldingDonco Twistboard Products East Lakeview West.

Slides:



Advertisements
Similar presentations
Create a Detailed CTC Machine Model with JMRI/PanelPro
Advertisements

Railcar 101 The Basics of Railcars: Car Types, Components and Rules
Model Railroading Operations 101: Part 1 – Basic Switching Moves
Card Order Basics. Card Order Basics What is It? –An advanced scheme for operating a model railroad –Allows for a realistic means of determining what.
JMRI Operation Part II More Fun with Operation
Operations on the BDMRR Dispatching for the Birmingham District Model RR.
Oklahoma Railway Museum Located at 3400 NE Grand Blvd Open on Weekends 9AM to 4PM Train Rides – April to October on 1 st and 3 rd Weekends Special Events.
Local Switching Operations Steve Prevette PNR Vice President Burnt Hills and Big Flats RR
Railroad Transportation Marketing Logistics. Rail Characteristics Good fuel economy. Mainly bulk, low-value commodities (coal, stone, lumber), except.
Card Order Update Training March TOPICS Operations –Why, What & How –Call Board –Yards & Permissions –Operating Tips –Manifests Interactive Lessons.
Footprints in the Snow Click on the pictures or take the tour by clicking the arrows Mysterious footprints were found in our yard! Can you tell? How many.
1957 NRHS Convention Roanoke, Virginia Bill Volkmer Was There.
Realistic Operations for Model Railroaders by R. B. Trombley, MMR PSR – NMRA Rev May, 2011.
Model Railroading Operations 101: Part 1 – Basic Switching Moves Tom Crosthwait President, Mogollon & Southwestern RR & Fred Bock, MMR, Chief Dispatcher,
Traffic Flow Analysis Steve Prevette Burnt Hills & Big Flats RR Pasco WA Fluor Hanford City University.
TRAIN OPERATIONS IN THE GARDEN
CE 515 Railroad Engineering
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
Model Railroading Operations 101: Review of Topics Tom Crosthwait President, Mogollon & Southwestern RR & Fred Bock, MMR, Chief Dispatcher, M&Sw.
Mission Promoting the development and growth of maritime shipping via the kingdom's national port of Aqaba through; mobilizing business skills and concepts.
INDUSTRIAL RAILWAY CONFERENCE Rail Conceptual Design Panel Discussion – April 28, 2015.
CE 515 Railroad Engineering Unit-Train Operations Special Freight and Package Services Source: Armstrong Ch 14 & 16 “Transportation exists to conquer space.
Model RailRoad Manager Inventory Management. Inventory: Rolling Stock and Everything Else l Locomotive, Freight Cars, Passenger Cars, Caboose, MOW l Trackage.
Introduction to Railroading
Current Integrated Use of Biomass from Forest Treatment Plummer Forest Products.
B&O CAR CARD AND WAY BILL OPERATIONS. INTRODUCTION To date, the B&O model railroad has directly written switch-lists for movement of cars. By moving to.
COPYRIGHT © AREMA : 1 of 21 Module 2: Train Operations.
Maintenance Management Seminar
Office of Railroad, Pipeline and Hazardous Materials Safety Collision of Metrolink Passenger Train 111 and Union Pacific Freight Train LOF65-12 Signal.
Railroads. Railroad Industry Characteristics Return on Investment –Increased from 5.7% in 1984 to 9.4% in Accounts for 1% of GDP Employs over 200,000.
Mobile Dust Suppression Sprinkling Trolley by Oasis Irrigation Equipment Co Ltd P-6,Scheme-VI, M(S), C.I.T, Kolkata –
Rail Freight Transportation Author: Dr. Alan Erera.
CHAPTER 9 CAR TYPES AND CARLOADINGS.
R. J. Corman Railroad Group 1 Greg Deakle Director – Port and Waterway Intermodal Operations.
Transportation (CHAPTER 23). Over Half of Railroad Employees Run Trains—Over the Road, Yards/Terminals, and Local Crew Districts - Increased in Recent.
2a: Physical features and climate of the Great Plains Flatlands that rise gradually from east to west.
Andy Stobie’s Indoor G scale layout -Original configuration - Reconfigured Design.
Operations 101: A Photo Tour of M&Sw RR Photos by Tom Crosthwait, President, Mogollon & Southwestern RR Editing by Fred Bock, MMR Chief Dispatcher, M&Sw.
Beach house On the water Lots of windows Pool Hot Tub.
The Trunk Lines as Big Business 1. By the early to mid 1850s the great Trunk Line Railroads – the New York Central, the Pennsylvania, the B&O, and the.
Director Rules and Field Support October 30, 2006.
Fire Reporting & Initial Attack (IA) Scenarios Imagine you’re the engineer on the fire train with the person sitting next to you as your crew. Take a radio.
The Trunk Lines as Big Business 1. By the early to mid 1850s the great Trunk Line Railroads – the New York Central, the Pennsylvania, the B&O, and the.
Biomass as an Energy Resource What is this? How much of this do you eat? 5.
Farm Radio In The Field Additional research component. Respondents were asked to submit daily photos based on the following questions: Where you are when.
By Stephanie Zerkel My resources 1.Hydrogen 2.Biomass briquettes.
3840 NW Bus Evans Rd. – Prineville, OR 97754
1 VIIRS McIDAS-V Casselton, ND Train Derailment December 31, 2013 William Straka III 1.
Tailboard Talks Intersection Leapfrog Florida State Fire College Ocala, Florida
Office of Railroad, Pipeline & Hazardous Materials Investigations Collision of a Union Pacific Railroad Freight Train with a BNSF Railway Company Freight.
Cutting and shaping wood BDHS Plain-sawed or Plain sawn Lumber – most economical and least wasteful.
Railway Rolling Stock 铁工 1303 班 组员 : 蒋奔 ( 组长 ) ,胡君雅,简雪昂 资料收集:简雪昂 版面设计 : 胡君雅 制作:蒋奔.
PROJECT UPDATE LRT ALIGNMENT. LRT ROUTE MAP ALIGNMENT OVERVIEW B-line Primarily centre-running; segregated by curbed barrier 13 stops Majority of stops.
Harrisburg Overpass Construction Update July 7, 2015.
What have we done!. DEFORESTATION WHATS GOING ON?
STREET SIDE OF CURRENT BUILDING
The First Big Businesses: Railroads
Principles of a Grid Reference
Koster’s Miniature Railroad Supplies
Visit for more Learning Resources
Transportation Technology
Land Use Types.
Fire Department Truth or Consequences Fire Department built a new complex in 2001 at 310 East 9th Street. This complex was setup to house an EOC/Dispatch.
STREET SIDE OF CURRENT BUILDING
Transportation, Distribution, and Logistics
Cabin Realty & Ag Services www. CabinRealtyAgServices.com
12.3 Moving Freight by Rail Chapter objectives covered in CE361: By the end of this chapter the student will be able to: Describe intermodal operation.
Andy Stobie’s Indoor G scale layout
FREIGHT CAR TRUCK COMPLEX MODERNIZATION
New Central Fire Station
Presentation transcript:

Erie Consolidated Lime Co.Lakeview Building Materials SW Yard Throat SW 97 - Lakeview West Dame MouldingDonco Twistboard Products East Lakeview West WEB 28 Jan 11 V 3.1 Street 1 Mainline Siding Arrival/Departure/Run Around Flat Loading Mainline Siding Run Around Tail Track Eastbound Pickups & Setouts TOFC Gen Strg Cement Cars Cement Loading Cement Cars Open for yard moves General Yard Storage Boxcars RETURN TO DISPATCHER’S OFFICE

Fremont Sawmill Lakeview Shops Fremont Sawmill and Engine Terminal East Water Tank WEB 28 Jan 11 V 3.1 MainlineSiding Fremont Wye Sawdust Fremont Lumber 1 Fremont Lumber 2 Log Flat Storage Log Dump LOCOMOTIVES PROHIBITED Snow Plow Engine Storage RIP Caboose & Fire Cars Fire Cars Run Around Switch Lead Tracks 6 Reserved for TOFC Flats 65 Arrival/Departure/Run Around Track 1 Reserved for Yard Moves Track 2 Reserved for Eastbound Pickup & Setouts Tracks 3 & 4 for General Yard Storage Boxcars and Flats RETURN TO DISPATCHER’S OFFICE Tracks 5 for General Storage & Mech Reefers

East Hagemeister Specialty Lumber Co. Doodlebug Engine House Lakeview Depot Lakeview Ag Center SW Lakeview East SW 105 Lakeview Industries Lakeview Lumber Co. Lakeview Lakeview East SW 109 Sawmill WEB 28 Jan 11 V 3.1 Mainline Siding Tail Track Saw Dust Loadout – Boxcars and Flats Nasty Flats Log Dump Westbound Pickups and Setouts – 10 Cars Saw Dust Arrival/Departure/Run Around Grain Loading – Covered Hoppers Boxcars and Flats East Run Around West Run Around RETURN TO DISPATCHER’S OFFICE