Status Report 6-Group 8 Sid Munshi Gabriel Castillo Jeff Burg Fahim Peermohammad The Intelli-Home October 3, 2006 To design and implement a control system.

Slides:



Advertisements
Similar presentations
PLC Timer Instructions
Advertisements

1 The University of Jordan Mechatronics Engineering Department PLC: Programmable Logical Controller.
Lecture 7: PLC: Review Questions
S.W.A.T (Security Watching All the Time) Jeff Shin Tyler Stubbs Paul Kasemir Pavel Mayyak.
Networked HVAC Controller Bradley University Department of Electrical & Computer Engineering By: Ed Siok Advisor: Dr. Malinowski.
PLC OPERATION & PROGRAMMING Dr. ONUR TOKER. What is a PLC ? PLC is a computer system controlling a process. inputs - the keyboard is analogous to a proximity.
16.7 Million Color LED Light Fixture Jeffrey Knorr Christopher Yope.
Fabrication Of A Wireless Sensor Network for Extreme Environments Faye Yuen EE 496 / NASA Fellowship Design Review Presentation 1 Fall 2006.
Happy Home Helper Final Status Presentation Jeremy Searle Apr 20, 2004.
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill Technology Education Copyright © 2006 by The McGraw-Hill Companies,
Programmable Logic Controllers Mary Holleboom ENGR 315 Dec. 5, 2001.
WISENET Wireless Sensor Network Project Team: J. Dunne D. Patnode Advisors: Dr. Malinowski Dr. Schertz.
SMALL BUSINESS MANAGEMENT ERP SOFTWARE BY COPY RIGHT BY
Gantt and PERT charts. Representing and Scheduling Project Plans Gantt Charts Useful for depicting simple projects or parts of large projects Show start.
ECE 4951 Lecture 1: Programmable Logic Controllers.
Status Report #7 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 03/23/2011.
Sensors and Actuator Network Based Architectures and Protocols for Smart Homes Bluetooth enabled Smart Home Mark Shaw Giorgio Politano Supervisor: Mieso.
DEC0905 Remote Control of Home Appliances ABSTRACT The objective of this project is to enable users to remotely control home appliances and systems over.
PLC introduction1 Discrete Event Control Concept Representation DEC controller design DEC controller implementation.
PLC: Programmable Logical Controller
STATUS REPORT # 3 RAUL RAMOS JOSHUA TORREY DAVID SANCHEZJESUS LUNA MONITORS PARKING SPACES AUTOMATICALLY AND SENDS STATUS NOTIFICATIONS TO PATROL OFFICERS.
DEVON JOHNSON FABIO GOMEZ JOELLE LAWSON Automated Monitoring System for Hospitals Status Report #3 February 6 th, 2012 Objective: To create an automated.
Status Report #5 Automatic Child Safety Gate: Corry Winslow Roger Battles Philip So Description: A telescoping gate with sensor technology through the.
Automated Industrial Wind Tunnel Controller By Daniel Monahan and Nick DeTrempe Advised by Dr. Aleksander Malinowski.
Unit 9.2_Lesson 2_CD Resource 2f_Plenary Gantt charts From the Gantt Chart answer the question.
Use it, Interconnect it, AutoMate IT™ ( Based on the FlexiMax 9000 Technology)
CLS Machine Protection and PLC Hardware Presentation to Beamlines Group Elder Matias Canadian Light Source University of Saskatchewan October 20, 2001.
Status Report #5 Automatic Child Safety Gate: Corry Winslow Roger Battles Philip So Description: A telescoping gate with sensor technology through the.
Status Report #2 Automatic Child Safety Gate: Corry Winslow Roger Battles Philip So Description: A telescoping gate with sensor technology through the.
Status Report 3 CAPS Cynthia Reyna David Rodriguez Cynthia Salas 9/15/08 Child Abuse Prevention System is a device that will monitor and log abusive hits.
Status Report 4 CAPS Cynthia Reyna David Rodriguez Cynthia Salas 9/22/08 Child Abuse Prevention System is a device that will monitor and log abusive hits.
Logical controllers' programming 2- Programming To program means to order with clarity a group of instructions that step by step they execute operations..
Status Report #6 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 02/28/2011.
Latifa AlAbdulkarim King Saud University October,2009.
SMART ENVIRONMENTAL CONTROL SYSTEM (S.E.C.S) John Ayers Tanner Ricks Jason Stange Jacqueline Ortiz An intelligent HVAC control system that efficiently.
Darren Jordan Adam Huck Daniel Ortiz September 22 nd, 2010 Our design is to install an automated fire suppression system in a vehicle and in the act of.
RAUL RAMOS JOSHUA TORREY DAVID SANCHEZJESUS LUNA MONITORS PARKING SPACES AUTOMATICALLY AND SENDS STATUS NOTIFICATIONS TO PATROL OFFICERS Automatic Monitoring.
DEVON JOHNSON FABIO GOMEZ JOELLE LAWSON Automated Monitoring System for Hospitals Status Report #4 February 13 th, 2012 Objective: To create an automated.
What is a Microprocessor ? A microprocessor consists of an ALU to perform arithmetic and logic manipulations, registers, and a control unit Its has some.
Status Report 1 CAPS Cynthia Reyna David Rodriguez Cynthia Salas 9/7/08 Child Abuse Prevention System is a device that will monitor and log every abusive.
Energy Conservation System (ECS) Status Report #1 James Sturdivant Ionel Taflan Juan Tamez Susan Austin.
Status Report #4 LYRA The Remote Accessible Automated Camera Stand Developed by: Juan Cuellar, Nathan Dye, Timothy Hawley, & Matthew Hect October 8, 2012.
An Overview of Support of Small Embedded Systems with Some Recommendations Controls Working Group April 14, 2004 T. Meyer, D. Peterson.
SMART ENVIRONMENTAL CONTROL SYSTEM (S.E.C.S) John Ayers Tanner Ricks Jason Stange Jacqueline Ortiz An intelligent HVAC control system that efficiently.
The U.S.S.E Team #4 Antonio Alvarez Janice Cruz Jose L. Gamboa Miguel Rivera Status Report #1 January 26 th, 2009 Description: A follower robot that will.
The U.S.S.E Team #4 Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz.
目录 8 in 1 Sensor ◆ 8 in 1 Sensor Unique Features ● Built in PIR motion sensor and light intensity sensor ● Built in 2 Dry Input Ports ● Built in 32 Logics.
SMART ENVIRONMENTAL CONTROL SYSTEM (S.E.C.S) John Ayers Tanner Ricks Jason Stange Jacqueline Ortiz An intelligent HVAC control system that efficiently.
Status Report #4 Bluetooth Tracking System Simoo Sipili Ionatana Sipili Anthony Mickens Lizardo Buleje 2/13/2012 Design an electronic system to track the.
Status Report 6 CAPS Cynthia Reyna David Rodriguez Cynthia Salas 10/13/08 Child Abuse Prevention System is a device that will monitor and log abusive hits.
Status Report 7-Group 8 Sid Munshi Gabriel Castillo Jeff Burg Fahim Peermohammad The Intelli-Home October 10, 2006 The design of a control system for an.
Status Report 4-Group 8 Sid Munshi Gabriel Castillo Jeff Burg Fahim Peermohammad The Intelli-Home September 19, 2006 To design and implement an intelligent.
Sabatier Process Automation TEAM MEMBERS: ALEXANDER KLEIN, CHARLES BRYAN, DUSTIN CLASBY FACULTY ADVISOR: JUDE DEPALMA.
Seminar on "PLC” (Programmable Logic Controller)
USA Factory Automation Market By Electrical Components (Inverters, Touch Panel, PLC, Relay, etc.); and By End User Industry (Automobile, Packaging, Chemical,
PLC Terminology and Application
Status Report 7 CAPS Cynthia Reyna David Rodriguez Cynthia Salas
INTRODUCTION TO PLC.
Programmable control systems
WISENET Wireless Sensor Network
WEB 240 Competitive Success-- snaptutorial.com
WEB 240 Education for Service-- snaptutorial.com
WEB 240 Teaching Effectively-- snaptutorial.com
DT-Assessment Frame Work Term2
8.0 Programmable Logic Controllers 1
Group No: xx Implementation of Wi-Fi based Home Automation using Master Slave Communication Project Advisor: Dr. Khalid Mehmood ul Hasan Department of.
The U.S.S.E Status Report #3 February 16th, 2009
The U.S.S.E Status Report #1 February 2nd, 2009
The Database Development Process
Presentation transcript:

Status Report 6-Group 8 Sid Munshi Gabriel Castillo Jeff Burg Fahim Peermohammad The Intelli-Home October 3, 2006 To design and implement a control system for an intelligent and responsive living space.

Problem Statement: To prevent unnecessary power consumption by automating normal household activities, also to secure the household by implementing a controlled security system. Key Goals & Dates Obtain PLCs 10/09/06 Obtain Sensors 10/14/06 Review Ladder Logic 10/16/06 Interface Sensors to PLCs 11/01/06 Program Microcontroller 11/01/06 Start building scale model home 10/25/06

Tasks completed 95% of parts ordered(75% received) Sensors and PLC ordered(Not received) JTAG emulator ordered(Not received) Ran simple programs on Microcontroller Continued contacting companies for parts Received Confirmation on the Sensors Purchased 650nM laser diodes Working with Micro while waiting for PLC

Ongoing Tasks Learning PLCs10/31/06 Working With Ladder Logic 10/25/06 Design Web page 10/09/06 Programming the Microcontroller11/01/06 Lighting Design10/31/06 Temperature Control System10/31/06 Worrying about project/graduating!On Hold!

Upcoming Tasks Ladder Programming / C++ Running Programs on PLC / Microcontroller Make Webpage Scale Model Home Develop software for Control System Testing and Debugging of entire system

Block Diagram and Work Completed

Gantt Chart