Extraction Michael Bevins May 17, 2007 12GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.

Slides:



Advertisements
Similar presentations
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Advertisements

PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Existing Arcs and 4m Dipole Preliminary Design and Safety Review Beam Transport Interface Mike Bevins February 22, GeV Upgrade - Beam Transport.
Tritium Target 9 December Overview Design and major subsystems Thermal/structural analysis Cell filling Vent and stack T2 detection and monitoring.
G2p/GEp Beamline Tim Michalski Project Lead. Overview Facilitate the design, procurement, and build of the beamline – up to the target chamber g2p/GEp.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
LIGO-G D partial ADVANCED LIGO1 Optical Layout Cavity Lengths Input Mode Cleaner (IMC) »IMC FSR = ~9 MHz »Length = ~16.6 m = ~HAM1 to HAM3 separation.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Bubble Chamber Planning Meeting 04 September
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC Engineering Challenges and Solutions for MeRHIC.
Quad Girders Michael Bevins May 3, GeV Upgrade - Beam Transport Quads & Girders, Arc 10 and Hall D Layout Preliminary Design and Safety Review.
Bubble Chamber Installation Kick-Off Meeting May 28, 2014, Grames Let’s discuss two jobs between the cryounit and injector gate. Bubble chamber (5D) New.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
SLA – Oct. 07 BDS-KOM1 Installation Overview Acknowledgment: F. Peters, M. Munro, J. Kim G. Aarons, C. Corvin, P. Rodriguez Fred Asiri/SLAC.
Thomas Jefferson National Accelerator Facility Page 1 IPR October 18-20, 2011 John J. LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
Proton Plan Director's Review 8/15/06 – Booster Corrector UpgradeDrennan1 Proton Plan Booster Corrector Upgrade Directors Review August 2006 Presenter:
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka,
ELENA Support system 6/11/2014 Antti Kolehmainen on behalf of WP Support system
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
2008 Beam Transport Design Status and Safety Review Beam Transport - Layouts, Stands, Girders, Vacuum, etc… Mike Bevins, Ross Bailes & David Green For.
MEIC Collaboration Meeting Site Development - Rebecca YaskyOctober 6, 2015.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review Vacuum Systems H.-C. Hseuh January 4, 2007 Vacuum Systems.
Status of MAMI C Hans-Jürgen Arends CB-Meeting, Basel October 4-6, 2006.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys.
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
Hall A Installation Review John J. LeRose 2/25/2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Injector Status Timur Shaftan, Injector Group Leader 9 th ASAC meeting for NSLS-II Project February 1-2, 2012.
February 17-18, 2010 R&D ERL Gary McIntyre R&D ERL ERL Status & Schedule Gary McIntyre February 17-18, 2010 ERL Status & Schedule.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
The SNS Power Upgrade Project Building on the Success of the SNS Accelerator Deployment Kevin Jones Research Accelerator Division Director.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Communication Tools Used For Commissioning the 12 GeV CEBAF Accelerator Brian Freeman WAO (Mainz, Germany) October 2014.
Extraction/Separator Setup Michael Spata Operations Stay Treat July 16, 2015.
High energy beam transport.
PETRA III, Status and Upgrade
LERF as Cryomodule Testing Facility Set-Up and Installation Logistics
Michael Sullivan and John Seeman SLAC National Accelerator Laboratory
UK RFD Pre-Series cryomodule
Potential Use of PEP-II Magnets by Project X
The first shipment of SPEAR3 magnets (9 dipoles and 12 quadrupoles) arrived April 3. The second shipment (3 dipoles, 7 quadrupoles, and 6 sextupoles)
Experimental equipment Edgar L. Black February 17, 2019
Performance Recovery at CEBAF
MEIC Cost Estimate Overview
J. Seeman Assistant Director for PPA/LCLS
Electron Beam Systems ETC and Methodology
Extraction Michael Bevins May 17, 2007
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review

Outline Introduction & Scope Requirements & Specifications New/Modified Extraction Elements/Girder Count Beam Transport Layouts Safety Considerations Cost Estimates Risk Assessment Summary

Introduction & Scope The extraction region must be upgraded to support transport of higher energy beam to halls A, B, & C and 5 th pass beam to the new arc 10 to support 12GeV operations Songsheet level machine layouts will be presented along with cost estimates Extraction Region

Requirements & Specifications Alignment specs –Quads & dipoles positioned to +/-0.5mm in x & y, +/- 1.0mm in z Vacuum specs –Beam line partial pressure of hydrogen <10-6 torr –Total average pressure of all other constituents less than 5x10-7 torr Fabrication, welding, cleaning & handling, and leak checking specs still apply –22631-S-001 Fabrication of Ultra-High Vacuum Equipment –22632-S-001 Cleaning and Handling of U.H.V. Components –22633-S-001 Welding Specification For U.H.V. Components –22634-S-001 Helium Leak Test For U.H.V. Components –Note an update and modernization of our vacuum specs is underway

New/Modified Extraction Elements/Girder Count Preliminary - pending CASA review and more detailed vacuum study Elements in red are part of I&C WBS

Beam Transport Layout - Extraction

Extraction Layouts – RF Separators 12GeV Configuration Current Configuration Relocated New Two new pedestal stands Existing supports New quad girder New double quad girder

Extraction Layouts – RF Separators

Extraction Layouts – Septa Magnet Stacks 12GeV Configuration Current Configuration Relocated New Two new pedestal stands YA Septa Stacks YB/YR Septa Stack New quad girder Two YBs Three YRs One relocated and one new support stand Two new support stands

Extraction Layouts – Septa Magnet Stacks Existing YA Septa StackExisting YB Septa Stack

Extraction Layouts – Dipole Magnet Stacks 12GeV Configuration Current Configuration New Two new support stands New BP Dipole Stack Three BPs

Extraction Layouts – Dipole Magnet Stacks 12GeV Configuration Current Configuration New

Extraction Layouts – Dipole Magnet Stacks New New support stand BQ/BP Dipole Stack Three new BPs 12GeV Configuration New pedestal for 5 th pass BP downbeam support Two existing BQs BP Dipole Stack New BP Two new pedestal supports for 5 th pass BP

Extraction Layouts – Dipole Magnet Stacks Existing BP Dipole Stack Existing BQ Dipole Stack BP StackBQ Stack

Safety Considerations Personnel Training –Jlab & sub-contractor Radiation –Designated areas for containment and radiation survey of material that will be removed from the tunnel Material handling –Provide provisions for lifting Electrical Hazards –Package and support electronics, power leads and terminal blocks to control electrical hazards

Cost Estimates – Extraction WBS Rollup WBS Elements I have covered today * * Septa and dipole vacuum chambers

Cost Estimates - Highlighted WBS Stands - Procurements

Risk Assessment Technical - Low –Girders & Supports – very similar designs exist and are already proven –Vacuum - existing designs already proven, detailed vacuum analysis TBD –Alignment - same as existing machine Procurement Schedule - Low –No long-lead items identified Cost – Low –Good cost estimates for machined parts Vendor & Jlab shop budgetary estimates

Summary Preliminary extraction beam transport layouts and cost and installation estimates are complete based on present scope We are in a good position to support our DOE External Project Reviews this summer We will continue to work closely with our friends throughout the lab (safety, CASA, installation, vacuum, alignment, RadCon, I&C, magnet measurement, operations, procurement & facilities) as we move forward Detailed design will be completed to support assembly and installation schedules We look forward to comments & recommendations from the committee