SiD collab. Mtg., 30 jan 2008 H.Weerts Stimulate the discussion & Closing Remarks to SiD collaboration meeting 30 January 2008 H.Weerts Argonne National.

Slides:



Advertisements
Similar presentations
A Final Word ILC Jan 8th, 2005 Eric Torrence University of Oregon.
Advertisements

Slides for Project Review 15 Dec ILD Future Colliders ILC, ILC-CLIC & Detectors ILD  VTX,LCTPC,CALICE.
The SiD concept Yannis Karyotakis LAPP Annecy / IN2P3 March 21 st ‘05.
20 Sep 2007Paul Dauncey1 CALICE beam tests Fantastically successful beam test at CERN this summer Yoshi will give a report on this shortly UK easily pulled.
ILCSC and WWS News David J. Miller: ILCSC news for MDI workshop, 6 January ILCSC Membership Recent ILCSC meetings Worldwide Study Plans.
Summary Remarks By Jonathan Dorfan. We Are Living In a Remarkable Time – We Stand at the Door to a A scientific Revolution  Discoveries of the past five.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Silicon Detector: Simulation & Reconstruction Norman Graf SiD Advisory Meeting September 14, 2009.
Snowmass, August 16, 2005 H.Weerts SiD Design Goals and Plans for Snowmass Snowmass H.Weerts Argonne Nat. Lab./ Michigan State Univ.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
Discussion/ Planning Session -ILD organisation: status and plans -Concrete plans -Report from the R&D group: Jan Strube -Report from the parameter group:
General news CLIC detector and physics meeting at LC2013, May 30 th 2013 Lucie Linssen L. Linssen, CLIC detector & physics meeting, May 30th
Linear Collider Common Fund Report M. Hronek1 19.JUN.15 CERN.
Status Report of the LCC Detector R&D task force Maxim Titov (CEA Saclay) Jan Strube (Tohoku University)
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
Lucie Linssen, CLICdp, (bi-)monthly meeting, July 21st CLICdp news CLICdp (bi-)monthly meeting July 21 st 2014.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
@ Future Plans for SiD & Opportunities for collaboration H.Weerts Argonne National Lab.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
ILC in Japan A 10 minute introduction H.Weerts Argonne National Lab March 24, 2014 University of Chicago.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
SiD Engineering Design for the LOI Kurt Krempetz (Layer 5) (Layer 1) VXD.
Workshop Goals SiD RAL Workshop April 14, 2008 John Jaros.
WWSWWS David J. Miller for WWS to ILCSC at Frankfurt, 10 May from the WorldWide Study on Physics and Detectors for ILC 1. LCWS at Stanford
SiD Conceptual Engineering Status Report Kurt Krempetz (Layer 5) (Layer 1) VXD.
ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off The Si licon D etector Design Study SiD Organization & Status H.Weerts Fermilab/Michigan State Univ. SiD kick.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Coil and HCAL Parameters for CLIC Solenoid and Hadron-calorimetry for a high energy LC Detector 15. December LAPP Christian Grefe CERN.
M. Oreglia, ALCPG07, 23 Oct 2007Slide 1 (of 1) Introduction to SiD; Preparing for a LOI Quick overview of SiD Charge to SiD speakers Substance of.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
1J. Brau - ILCSC Meeting - Beijing - August 19, 2004 Organizing the Global Experimental Program The ILCSC has asked the Worldwide Study, as its Physics.
SiD Snowmass 05 Jaros1 Optimizing SiD getting from here….……………….to there SiD Concept/Snowmass August 16, 2005 John Jaros.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
SiD workshop, January 16-18, 2013 H.Weerts Building the SiD collaboration H.Weerts Argonne National Laboratory Proposal & suggestions.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
Accelerator Safety Workshop SLAC Scott L. Davis Accelerator Safety Program Manager – SC Office of Science, U.S. Department of Energy Summary and.
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
MICE – Video conference Alain Blondel, 17 December   MICE selected NEWS: Future meetings Safety review Study of controls Gateway I & Toward Gateway.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
Office of Science January 28, 2008J.Blazey / SiD Workshop / SLAC1 The View from DOE Moving ForwardMoving Forward HEPAPHEPAP FY08 “in review”FY08 “in review”
Atlas Software May, 2000 K.Amako Status of Geant4 Physics Validation Atlas Software Week 10 May, Katsuya Amako (KEK)
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
VLCW06, July 23, 2006 H.Weerts Vancouver, CA 1 Where YOU can contribute in SiD. H.Weerts Argonne National Lab for SiD concept design study.
Detector R&D at Fermilab Some Perspectives Marcel Demarteau For the Fermilab Detector & Physics R&D Group SiD Workshop SLAC January 28-30, 2008.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
7 October 2005SiD tracking – Chris Damerell 1 Chris Damerell Rutherford Appleton Lab  New charge, given to us by ILCSC on 27 th September (following meeting.
Relations with concept groups
Agenda items TEB activities at KILC TDR SVN repository roll-out
Final CALICE OsC meeting: Status and summary of project
Introductory Remarks and Meeting Goals
Input to Strategy currently planned
Strategy Ties Behnke
PDAP Junji Haba, KEK.
What Is Next for SiD ? H.Weerts Argonne Nat. lab..
Preparations for the SiD Workshop at Fermilab, April 9-11
CLIC detector at SiD meeting 28/3/2010
ECAL project in the future 2-3 years
The SiD Detector Outline Overview
January Collaboration Meeting
The DBD: Outline and Scope
Proposal Organisation
Presentation transcript:

SiD collab. Mtg., 30 jan 2008 H.Weerts Stimulate the discussion & Closing Remarks to SiD collaboration meeting 30 January 2008 H.Weerts Argonne National Lab

SiD collab. Mtg., 30 jan 2008 H.Weerts Intro remarks This has been a sobering meeting As we have heard several times ( Barry, Jerry) the case for a Linear Collider remains strong. Science has not changed. Funding situation in UK & US especially towards ILC Attendance down……… SiD keeps making progress Also EPP2010 & P5 in 2007 Am convinced that current P5 in US will come to same conclusion. Rest of world ( world minus (UK+US)) has not changed its mind. So I am convinced that LC will remain priority Therefore SiD is needed & we need to continue Human problem: what will be the time scale for realizing LC/SiD ? Next step: LOI

SiD collab. Mtg., 30 jan 2008 H.Weerts This could be the end of my talk Not much else to say

SiD collab. Mtg., 30 jan 2008 H.Weerts Short term and mid term goals for SiD Create a LOI ( or whatever it will be called) and submit to Research Director (RD) Interact with RD and communicate clear intention to submit LOI Become a “validated” LOI Hard to see beyond this, because it is not clear. Even “validation” meaning is not quite clear However: It is necessary to be “validated”, because it will be required for any future steps for SID

SiD collab. Mtg., 30 jan 2008 H.Weerts Timeline LOI previous Date Milestone 10/1/08 Submit LOI 9/1/08 Begin Final Edit of LOI; complete authorlist 8/1/08 Complete LOI Draft Collaboration Review and Comment 6/1/08 GEANT4 Description Ready Performance Studies Ready Benchmarking Studies Ready 5/08 Freeze Detector Design SubSystems Fully Specified Subsystem Technologies/Alternates Selected Conceptual Engineering Designs Ready 3/08 Freeze Global Parameters First Pass Detector Design 2/08 First Pass Global Parameters 12/07 Subgroup Plans Defined Milestones and Deliverables Manpower Resources Needed 10/1/2008

SiD collab. Mtg., 30 jan 2008 H.Weerts A new draft time line for the SiD LOI Date Milestone 4/09Submit LOI 3/09Begin Final Edit of LOI; complete authorlist 2/09 Complete LOI Draft Collaboration Review and Comment 9/08GEANT4 Description Ready Performance Studies Ready Benchmarking Studies Ready 6/08Freeze Detector Design SubSystems Fully Specified Subsystem Technologies/Alternates Selected Conceptual Designs Ready 4/08Freeze Global Parameters First Pass Detector Design 3/08First Pass Global Parameters Optimization studies 01/08Subgroup Plans Defined Milestones and Deliverables Manpower Resources Needed Activities Optimization studies At UK meeting ? Additional goals ??

SiD collab. Mtg., 30 jan 2008 H.Weerts Benchmarking LOI input We need the planning input we requested; adjust time line

SiD collab. Mtg., 30 jan 2008 H.Weerts Engineering Pre-conceptual thoughts All the way to commissioning Need to continue this in SiD Can not produce anything believable without it DetectorRadius (m)Axial (z) (m) MinMaxMinMax Vertex Detector Central Tracking Endcap Tracker Barrel Ecal Endcap Ecal Barrel Hcal Endcap Hcal Coil Barrel Iron Endcap Iron Example:Global parameters needed

SiD collab. Mtg., 30 jan 2008 H.Weerts Detector R&D Need to identify SiD specific R&D or R&D needed for SiD Should SiD have its own R&D program ??? May work in the US, now that everything is up for grabs Does NOT work outside US because of existing R&D collaborations/efforts My Answer: This may change when SiD is a “validated” detector concept no we should not have our own R&D program; just identify R&D that is needed. (now)

SiD collab. Mtg., 30 jan 2008 H.Weerts HCAL technology Choice of technologies or better: choice of baseline There is a procedure; Vishnu: Information from sub systems tests of all sizes is useful input We will have options ( guaranteed blood pressure increaser) Need options, even just to cover E cm If HCAL group is not able to come to a choice of baseline and options, create SiD internal committee to make this selection. Time scale was: March-April 2008 started laying out the arguments, “pro and con”

SiD collab. Mtg., 30 jan 2008 H.Weerts Final remarks Thank you all for coming/contributing remotely Under difficult circumstances Next meetings: Feb 8 at CERN to establish contact with CERN/CLIC Feb 11 with French groups March 3-6 Sendai meeting ( ACFA) April SiD RAL Thanks to SLAC and the SLAC SiD group for hosting this meeting. Thanks Rich Partridge.

SiD collab. Mtg., 30 jan 2008 H.Weerts THE END