Reporting and payment claims Black Sea Basin ENPI CBC Programme Training for Grant Beneficiaries and Partners Bucharest 18 June 2014 Financial Unit.

Slides:



Advertisements
Similar presentations
Click to edit Master title style 1 Financial aspects of closure European Commission Felix LOZANO, DG Agriculture and Rural Development.
Advertisements

Management verifications Franck Sébert European Commission DG Employment, Social Affairs and Equal Opportunities.
“MED P ROGRAMME ” Z ERO C O (2) Z ERO EMISSION CO MMUNITIES F INANCIAL MANAGEMENT SYSTEM K ICK O FF M EETING J UNE 17° 18° 2010.
GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES.
Co-funded by the European Community eContentplus programme WP1 – Project Management Reporting and financial issues Milva Carbonaro GISIG.
LIFE Platform meeting Denmark 2008 Tommy Sejersen, Financial Desks EC DG ENV – LIFE Unit Telephone
Large Scale Projects Aleksejs Šaforostovs LSP Project Manager Joint Technical Secretariat.
ESPON 2013 Programme Info Day on Calls and Partner Café Brussels, 10 May 2012 How to apply: Application Form and Eligibility A Decade of Territorial.
Workshop on irregularities EEA and Norway Grants Financial aspects related to the irregularities Herdis Bjornevik Svendsen Financial Controller.
Foresters towards life-long learning for the better forest management HUSKROUA/1001/028 Administrative requirements and procedures Lesya Loyko FORZA NGO.
Project Implementation training session for actions financed under the Call for Proposals Joint Managing Authority Levi,
This project is funded by the EUAnd implemented by a consortium led by MWH Expenditure verification Estonia Latvia Russia ENPI CBC Programme Project Management.
Financial Reporting Joint Technical Secretariat Seminar for Beneficiaries August Rēzekne, Latvia.
This work is part of EQUITY ACTION which has received funding from the European Union, in the framework of the Health Programme.
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
1 CASIP-SMEs project Project & Financial and Management Committee Meeting Luxembourg, 15th November 2012 This project is funded by the European Union Provided.
Green Partnerships Local Partnerships for Greener Cities and Regions 1st Reporting /Presage Other administrative issues Portugal, 8-10 July 2013.
Expenditure verification Joint Technical Secretariat Seminar on reporting 13 August Rezekne, Latvia.
Reporting Instructions For Beneficiaries and Partners of the HUSKROUA ENPI CBC Programme November 2011.
Delegation of the European Commission to Russia 1 Financial Reporting for Grant Contracts General Conditions
INTERREG IVA 2 Mers Seas Zeeën Crossborder Cooperation Programme Part-financed by the European Regional Development Fund (ERDF) Legal framework:
South East Europe Transnational Cooperation Programme Bologna, 15° June 2009 Kick-off meeting of project SARMa SEE Joint Technical Secretariat.
Financial Management MW-Sonet 16 th – 19 th of March 2011, Turkey.
DG DEVCO, Unit B.6 Brussels, November Outline 1.Useful links 2.General conditions 3.General issues 2.
Tacis Contracting Procedure Documents to be submitted together with the application:  Original Declaration by the Financial Lead Partner for Tacis  Partnership.
DG DEVCO, Unit B.6 Brussels, April Outline 1.Useful links 2.General conditions 3.General issues 2.
Narrative reporting: good practices. Joint Technical Secretariat Seminar for Beneficiaries February 2012 Narva, Estonia.
Financial reporting Linda Wormö, MA Per Dahlström, MA 1st October,2015 Kuopio, Finland.
ACP S&T Programme - Stakeholder conference October Implemented by the ACP Secretariat Funded by the European Union EDULINK - ACP Science and.
Delegation of the European Commission to Russia European Union Delegation to the Russian Federation 1 Financial Reporting for Grant Contracts General Conditions.
Technical Assistance Office 1 SOCRATES - MINERVA GRANT AGREEMENT 2004 Kick-Off Meeting, Brussels 22 October 2004.
Grant contract and annexes Training for Auditors Estonia/Latvia/Russia ENPI CBC Programme Riga, Tartu, April 2012.
Reporting and payment claims Black Sea Basin ENPI CBC Programme Training for Grant Beneficiaries and Partners Bucharest 18 September 2013 Financial Unit.
Verifications related to the awarded contracts under the framework of the Joint Operational Programme Black Sea Basin, financial checks for projects under.
Preparing a project budget Annex B1 ENPI Annex B1 ENPI Annex B2 IPA Annex B2 IPA Annex G Eligibility of expenditure Annex G Eligibility of expenditure.
Technical Assistance Office 1 SOCRATES - MINERVA GRANT AGREEMENT 2004 Contractual and Financial Management Administrative and Financial Handbook.
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
1. TEMPUS PROGRAMME PROJECT REPRESENTATIVES’ MEETING Brussels, March 2010 Management of the Grant Agreement.
Interim report I The Northern Beauty Barents visual arts in
INTERREG III B CADSES Neighbourhood Programme Administrative and Financial Aspects of Hydrocare Project Dr. Janka Strakova Project contact.
DG Justice and Consumers Project Modifications DG Justice and Consumers.
Faculty of Technical Sciences, University of Priština in K. Mitrovica Administrative Issues (from the guidelines) – Siniša ILIĆ – Belgrade, The School.
MATcHES Project Ruse, February 26, 2014 Nohelia Morales Martínez Project number: TEMPUS BG-TEMPUS-JPHES This project has been funded with.
27 th of June 2013 GCCA Tanzania:Integrated Approaches for Climate Change Adaptation Information session on the Call for Proposals Contract and budgetary.
EU - China 11 Guidelines for Applicants rules for applications European Union Delegation to China & Mongolia Beijing Information Session 14 th November.
Management of the Grant Agreement By Philippe Ruffio & Nathalie Hoste-Luxen Tempus project representatives’ meeting Brussels December 2011.
The LIFE Programme: the EU funding tool for the Environment and Climate Action Lorenzina Bruno, Senior Financial Officer EASME – C.1.6 LIFE NGO Kick-off.
Project Implementation training session for actions financed under the 2nd Call for Proposals Joint Managing Authority, Branch Offices.
Financial reporting Joint Technical Secretariat Beneficiary Seminar Seminar for Beneficiaries February 2012 Narva, Estonia.
1 Details of the Sword Contract Kick-off meeting Autonomous Province of Trento Trento, December 18-19, 2014 SWORD (School and WOrk-Related Dual learning)
23/03/2011 Programme ACP-UE d’appui aux secteurs culturels ACP EU-ACP PROGRAMME SUPPORT TO ACP CULTURAL SECTORS (ACPCULTURES II + ACPFILMS II) 1st CALL.
Kolarctic ENPI CBC Programme Project implementation training session under the 1st Call for Proposals FINANCIAL ISSUES Joint Managing Authority.
Chisinau, Republic of Moldova 2017
Chisinau, Republic of Moldova 2017
Reporting and payment claims
Chisinau, Republic of Moldova 2017
Structural Funds Financial Management and Control, Romania
Structural Funds Financial management and Control, Romania
4.4 Procurement by grant beneficiaries
Contractual obligations
PROJECT MANUAL Galina Georgieva Project Officer
Financial management of DBBT project
Chisinau, Republic of Moldova 2017
Management Verifications & Sampling Methods
INTERREG IPA CBC “GREECE ALBANIA ”
Presentation prepared by Andreja Tonč, Team Leader
Management Verifications & Sampling Methods
Financial and Administrative presentation on PARTICULATES project
Practical Aspects and Running of the Project
Contractual and Regulatory Framework
Presentation transcript:

Reporting and payment claims Black Sea Basin ENPI CBC Programme Training for Grant Beneficiaries and Partners Bucharest 18 June 2014 Financial Unit

Financial reporting in contract The narrative and financial reporting is described in article 4 of the Special Conditions of the contract and complemented by: Article 15.1 of General Conditions derogated by art SC, explaining the conditions for payment claims and the documents to attach Annex V to contract: model of payment request Annex VI to contract: model of financial report Annex VII to contract: model of expenditure verification report Financial Unit

Payment claims during the project According to General Conditions article 15.1 Option 2 derogated by Special Conditions art. 4.2 Option 2, for projects not exceeding 24 MONTHS and where the financing provided by JMA is between € up to €, there is: A pre-financing of 30% from ENPI grant after the signature of the contract Forecast second pre-financing instalment representing maximum 50% of the ENPI grant A balance representing maximum 20% of the grant Total sum of pre-financings not exceeding 80% of ENPI grant. The reports shall cover the Action as a whole, regardless of which part of it is financed by the JMA. Financial Unit

Annex VI of Grant Contract (Excel file) The financial part of Annex VI is an Excel sheet with five parts: General information on how to use it Forecast budget and follow-up Interim Report Sources of funding Final report Financial Unit

General information Nota bene: The Beneficiary alone is responsible for the correctness of the information in the tables check the information sent by your partners!! Forecast budget and follow-up Requested only for information purposes but very useful also for your project financial monitoring!! Other The sheet “sources of funding” has to be included both in interim and final reports Figures have to be rounded to the nearest euro cent Financial Unit

Use of exchange rates Exchange rates: The project accounting has to be kept in the national currency used by each partner Interim and final reports include, for each budget line, four columns for each currency: number of units, unit cost in original currency, total cost in original currency and total cost in Euro Exchange rate to use is the arithmetical average of the one in Inforeuro for the concerned period (sum of the exchange rates of the months of the reporting period rounded to 4 decimals, divided by the number of months) Let’s see an example of calculation of exchange rate for the report! Financial Unit

Use of exchange rates 1.Go to Inforeuro web site, indicate your currency and press Enter Financial Unit

Use of exchange rates 2.Click “Download in table format” and open the Excel file with all the monthly exchange rates: ue&currency=507&Language=en Financial Unit

Use of exchange rates 3.Calculate the average exchange rate to use in the Excel (see example for a reporting period from Mar 2011 to August 2011): Financial Unit

Interim/ Final report The amount of eligible expenditure has to be indicated in the sheet called “Interim Report” Financial Unit

Interim/ Final report 1.Identify the project with its number and implementation period, indicate the period covered by the report and copy the budget in the contract Financial Unit

Interim/ Final report 2.If JTS/JMA has authorized any reallocation between budget lines or the use of part of the reserve for contingency, indicate it in the columns beside the “original” budget Financial Unit

Interim/ Final report 3.For each currency and budget line, fill-in the requested information: number of units, unit cost, total cost in original currency and total cost in Euro, using the exchange rate, calculated as mentioned in previous slides Financial Unit

Interim/ Final report For each category, add up the number of units from all currencies and the total amount in Euro for each currency: Add the cumulated costs of previous period, if it is not the first payment claim, and calculate the cumulated cost (i)(h)+(i) 0 Cumulated costs (from start of implementation to present report included) (in EUR) Cumulated costs (before current report) (in EUR) Financial Unit

Budget forecast and follow-up This is a key table to verify that the project remains within the budget flexibility rules, as mentioned in article 9.2 of the General Conditions and it will still remain at the end of the following period. As a result of this calculation, you may identify the need to request authorization for a budget change. Financial Unit

Sources of funding Do not forget that it is compulsory to include the table with the actual sources of funding so far. Financial Unit

Annex V: request for payment Annex VI with the table has to be an attachment to Annex V, which is the formal request for payment. You will find the model as an annex to your contract. Financial Unit

Rules concerning verification system Financial Unit Obligations of the Beneficiary/ partners after the activities are accomplished and payments of expenditures are made  Drawing the individual and consolidated reports (narrative and financial) – Annex VI;  Requesting individual and consolidated expenditure verification reports – Annex VII (3a and 3b), accompanied by the Notice concerning payment request – issued by the First Level Controller/Auditor – ENDORSEMENT OF THE REALITY, REGULARITY AND LEGALITY OF THE EXPENDITURE VERIFIED  To provide an active bank account for the project - Financial Identification Form  To fill in the annex Sources of funding - included both in interim and final reports Joint Managing Authority

Financial Unit III. Identified problems in the Financial reporting - concerning: Annex V of the contract: Payment request Annex VI oh the contract: Financial reports Annex VII of the contract: Expenditure verification reports

III.1. Payment claims - findings Financial Unit PRE-FINANCING PAYMENT OF FINAL BALANCE  Requesting the entire amount of the payment claim mentioned in the contract – although the beneficiary didn’t spend at least 70% of the previous payment and 100% of any previous ones;  The amount claimed for deduction from the total sum of pre-financing should be the amount covered by the consolidated expenditure verification report ;  The period mentioned in the payment claim should be the same with the one from the consolidated financial report.  Presenting all the necessary documents mentioned in second slide – additional supporting documents if is necessary.

III.2. Individual and consolidated reports (financial) – Annex VI (I) The control bodies/ auditors when verifying the reports must take into account the following aspects: 1. All the information and amounts from the consolidated report - should be in line with those presented in the individual reports:  for each currency and budget line, fill-in correctly the number of units, unit cost, total cost in original currency and total cost in Euro, using the exchange rate – there are four columns for each currency;  budget forecast and follow-up – very important key table to verify that the project remains within the budget flexibility rules and it will still remain at the end of the following period. As a result of this calculation, the beneficiary/partner may identify the need to request approval for a budget change. Financial Unit

III.2. Individual and consolidated reports (financial) – Annex VI (II) 2. The reports shall cover the Action as a whole, regardless of which part of it is financed by the JMA - exception of costs relating to final reports, expenditure verification and evaluation of the action. Expenditure is to be understood “incurred” at the date of the actual payment made by the Beneficiary or its partners. 3. All the reported expenditure should respect the budget – in case of need the beneficiary has to notify or request an addendum - in due time. 4. The interest from the pre-financing should be filled in the financial reports – where is the case and where is not - zero. Financial Unit

III.2. Individual and consolidated reports (financial) – Annex VI (III) 5. The expenditure incurred should be declared in the correct reporting period – Ex: salaries paid for the months included in the final reporting period should not be declared in the intermediary report 6. Numbers in the financial reports should be rounded at - two decimals 7. The incorrect use of the exchange rate – use of the arithmetical average of Inforeuro for the concerned period (sum of the exchange rates of the months in the reporting period rounded at 4 decimals, divided by the number of months); 8. An addendum request – if the beneficiary need to amend the headings for administrative costs or the contingency reserve; also, if he wants to use the contingency reserve, he needs prior approval of the JMA; 9. Please respect the percentage limits established within the contract for the administrative costs or other special costs – at the project level Financial Unit

III.3.Expenditure verification reports (I) In the individual reports – the auditor/controller should present a clear situation of the eligible and ineligible expenditure - all the exceptions must be justified; Each individual expenditure verification report should be accompanied by the Notice concerning payment request – issued by the First Level Controller/ Auditor – very useful tool in the verification process In the individual report - the table from point 2 of the report “Procedures performed and factual findings” includes: Budget (main headings in euro), Expenditure reported (main headings in euro), Expenditure verified and Expenditure coverage ratio (% verified Euro); Financial Unit

III.3. Expenditure verification reports (II) The controller/auditor should fill in the consolidated report with all the information from the individual reports - JMA found errors concerning the validated expenditure; The interest from the pre-financing should be filled in the expenditure verification reports – where is the case and where is not - zero. JMA identified arithmetical errors in the reports – beneficiary/partner can request to correct the report. Financial Unit

.. Thank you for your attention! Petrua VOICU, Counsellor Directorate of Programme Authorizing European Territorial Cooperation Programme Authorizing Unit Financial Unit