JKLM Reese Hollow 118 2HU Gas Well Release

Slides:



Advertisements
Similar presentations
ENVIRONMENTAL MONITORING AT SOLID WASTE (SW) LANDFILLS QUIZ Ruxandra Floroiu, Environmental Engineer, ECSSD WB Safeguards Workshop Chisinau, Moldova October.
Advertisements

Natural Gas Drilling Activities - A State Perspective Ryan Benefield, P.E. Deputy Director, Arkansas Department of Environmental Quality
Basic Economic Development Course in Pennsylvania Environmental and Commercial Real Estate Legal Issues Surrounding Economic Development Act 2 Issues Scott.
Further Site Investigation Sutton Walls Former Landfill
Harris County Pollution Control Services Department Enforcement of Bacteria Requirements in Wastewater.
Environmental Regulation and Hydraulic Fracturing in California
Hydraulic Fracturing Regulatory Act Public Act Prohibitions and Enforcement Fracking Industry Seminar Rend Lake College July 30, 2013 LISA MADIGAN.
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
Copyright © 2008 by West Legal Studies in Business A Division of Thomson Learning Chapter 50 Environmental Law and Land Use Controls Twomey Jennings Anderson’s.
The Proper Location and Construction of a Residential Water Well.
All Fracked Up Kyle Hicks, Matt Gnegy, Robert Simmons and Christopher Coppock.
CHESTER, PENNSYLVANIA RISK STUDY Reginald Harris, Senior Toxicologist/Regional Environmental Justice Coordinator EPA Region III.
Notices of Violation, Orders to Cease Operation and Consent Orders.
Federal Mogul Department for Environmental Protection Kentucky Division of Waste Management February 10, 2015 Presented by Chris Jung To Protect and Enhance.
Performance Audit (May 2014) Office of Conservation, DNR Oil and Gas Program Concluded (among others): o Does not perform appropriate routine inspections.
Water Issues Related to Marcellus Gas Drilling Activity Water Issues Related to Marcellus Gas Drilling Activity Bryan Swistock Water Resources Extension.
“GAS MART” petroleum facility in Florida By: Ernest Twum-Barimah Zhengzhong Fang (John) Zhengzhong Fang (John)
1 Hydraulic Fracturing Regulatory Processes in Louisiana James H. Welsh Commissioner of Conservation.
Environmental Investigation by Con Edison Former E115th Street Gas Works November 13, 2007.
It’s not my Fracking Problem! Regulations, Liability, and the Process of Hydraulic Fracturing Katie Heath November 30, 2010.
SHALE PLAYS IN THE INTERMOUNTAIN WEST: LEGAL AND POLICY ISSUES Development of Shale: Water Resource Concerns & Policy Considerations Katy Dunlap, Esq.
Printed by DEVELOPING A NON-PUBLIC WATER SUPPLY PROGRAM FOR THE STATE OF GEORGIA Scott A. Uhlich, MCP Georgia Department of Human.
Hydraulic Fracturing in the Marcellus Shale Formation Why regulation under the Safe Drinking Water Act is needed.
Michael A. Skiffington Program Support Manager Virginia Department of Mines, Minerals and Energy W&M ELPR Spring Symposium Williamsburg, VA – March 28,
Kathy Metropulos Division of Drinking and Ground Waters Protecting your aquifer: What to consider when drilling oil and gas wells.
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
Well Construction Example 1 Screen in Target Confined Aquifer C Confined Aquifer B Proper Well Construction Requirements In addition to the Virginia Department.
Preventing Nonpoint Source Pollution
West Texas Legislative Summit ENVIRONMENTAL ISSUES Environmental Regulations Affecting Transportation Carlos Swonke Director, Environmental Affairs Division.
John N. Dougherty, PG Lisa Campbell, PG EPA Region 2, New York City
Regulatory Aspects of the Underground Hydrocarbon Storage (UHS) Program and the Role Contractors Have in This Lyons Celebration Center, Lyons, Kansas February.
Fracking 101. Fracking is a debated environmental and political issue. Industry’s insist it is a safe and economical source of clean energy; critics,
1 GROUNDWATER REMEDIATION OF A HIGHLY CONTAMINATED BEDROCK SITE - The Oxygen Infusion Phase - J. Morrow D. Side By :
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
HYDRAULIC FRACTURING (FRACKING) AND OFFSHORE DRILLING IN FLAGLER COUNTY CITY COUNCIL WORKSHOP JUNE 9, 2015.
Marcellus Gas Drilling and Water Resources PA’s abundant water resources - a blessing and a concern Bigger rigsMore wastewaterMore waterMore disturbance.
Monitoring and Protecting Groundwater During Oil & Gas Development Overview of Colorado Aquifer Systems November 26, 2012 Christopher J. Sanchez, P.G.
 Rick Rusz, Supervisor of Groundwater Permits Unit, Water Resources Division, and decision maker for the Groundwater Discharge Permit.  Ginny Pennala,
AIM: What is fracking? Why is fracking such a controversial topic? DN: What do you know about fracking?
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
VI. Purpose of Water Treatment
Hays Trinity Groundwater Conservation District Education and Technology “a role for today, a goal for tomorrow” Commissioners Court Presentation.
USEPA Region 2 Vapor Intrusion Study Cayuga Groundwater Contamination Site March 4, 2009.
OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION February 18, 2012.
Former DuPont Barksdale Works Project Update May 19, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Bureau of Environmental Health Assessment Massachusetts Department of Public Health February 13, 2002 Public Meeting: MDPH Activities in South Weymouth.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
UNSM Spring Workshop, Yarmouth, Nova Scotia Some More Facts about Hydraulic Fracturing May 9, 2013 Andrew Blackmer, M.Sc., P.Geo, Dillon Consulting Ltd.
Office of Affordable Housing ENVIRONMENTAL ASSESSMENT REVIEW PROCEDURES FOR THE HOME PROGRAM BY: GEORGIA DEPARTMENT OF COMMUNITY AFFAIRS OFFICE OF AFFORDABLE.
Not all changes will be discussed please view all regulations at
Environmental Sustainability and Pennsylvania’s Laws Pertaining to the Protection of Groundwater Before, During, and After Unconventional Shale Gas Development.
Thom KerrNovember 17, 2015 Colorado’s Continuous Adjustment to Unconventional Resource Development.
COMMON PROBLEMS WHEN REVIEWING WATER WELL PLUGGING RECORDS.
© 2004 West Legal Studies in Business A Division of Thomson Learning BUSINESS LAW Twomey Jennings 1 st Ed. Twomey & Jennings BUSINESS LAW Chapter 48 Environmental.
Marian Anderson Place Site Update City Commission Special Workshop December 14, 2015.
Marshall Landfill Site.  Patrick Cabbage, Hydrogeologist/Site Manager  Bill Fees, Engineer  Carol Bergin, Public Involvement Coordinator.
March 30, 2016 Murrysville Oil & Gas Ordinance Education Series Developer Perspective Huntley & Huntley Petroleum & Natural Gas Exploration Established.
RICK COOPER DIRECTOR OF THE DIVISION OF GAS AND OIL VIRGINIA DEPARTMENT OF MINES, MINERALS AND ENERGY Gas and Oil Well Drilling Requirements for the Tidewater.
Institutional Controls in Pennsylvania’s Brownfields Program Presented by: Jill Gaito Director, Brownfields Action Team Office of Community Revitalization.
Safer Fracking What Would It Look Like? Based on a presentation by Louis Allstadt Former Executive Vice President Mobile Oil Corporation Presented by Susan.
Actions Related to Pittsburgh Water and Sewer Authority Monday, April 25, 2016, 2 pm Tom Wolf, GovernorJohn Quigley, Secretary Dial-in number for audio:
Unity Ground Water Investigation Steve Faryan, USEPA.
N. C. Department of Environment and Natural Resources Division of Waste Management Stony Hill Road Contamination Wake County.
Dry Cleaning and the Environment
DEP Legacy Well Emissions Study
Marcellus Water Issues
Factsheet: Proper Permanent Well Abandonment for Virginia Coastal Plain Wells VDH DEQ What is.
RINGWOOD MINES/LANDFILL SITE PUBLIC MEETING December 6, 2016
Hydrogeologic Investigations of the Silver Lake Wetland
Hold Your Breath—Ohio EPA’s TCE Initiative
Presentation transcript:

JKLM Reese Hollow 118 2HU Gas Well Release Potter County Natural Gas Resource Center Coudersport, PA December 17, 2015

Introduction DEP Representatives Marcus Kohl – Regional Director, Northcentral Regional Office Daniel Spadoni – Community Relations Coordinator, NCRO Jennifer Means – Program Manager, Eastern Oil and Gas District Dave Engle – Environmental Group Manager, Eastern O & G District Mike Panettieri – Oil and Gas Inspector Supervisor, Eastern O & G District Bill Kosmer – Professional Geologist, Eastern O & G District John Hamilton – Program Manager, Safe Drinking Water Program, NCRO Randy Farmerie – Professional Geologist Manager, Environmental Cleanup Program, NCRO

Site Location:

Timeline of Events September 14 - JKLM began drilling the surface hole of the Reese Hollow 118 2HU Gas Well Friday September 18, 2015 first report of “soapy water” in home well received and water sample collected by JKLM Additional reports of impacts to home wells over the following week Monday September 21 –additional home wells sampled by DEP and Penn E&R (JKLM’s environmental consultant) September 22 – Public water supply wells sampled

Timeline of Events, Cont. September 22 – Notice of Legal Presumption to JKLM for 2 private water supplies 58 Pa.C.S. §3218(c)(2): Unconventional operator is presumed responsible for pollution of a water supply: If the water supply is within 2500’ of vertical well bore, and If the pollution occurs within 12 months of certain activities (drilling, stimulation, etc.)

Timeline of Events, Cont. September 23 – JKLM meeting with public water suppliers and Potter Co EMA Use of public water supplies in area stopped as a precaution September 26 –report that pond along Route 6 had been impacted

Timeline of Events, Cont. September 30 – NOV issued to JKLM for release Violations of Oil and Gas regulations: Failure to prevent pollution of fresh groundwater; Drilling through fresh groundwater with a substance other than air, freshwater or freshwater based drilling fluids; and Violations of the PA Clean Streams Law: Unpermitted discharge of a polluting substance: Violations of Pennsylvania’s Clean Streams Law

Timeline of Events, Cont. October – November – Investigation continues with additional monitoring of water supplies October 27 – Presumptive Determination letters sent to 2 water supply owners Late October-early November - 4 Monitoring wells installed on the well pad and sampled November 18 – Plugging of the Reese Hollow 118 2HU gas well completed

Timeline of Events, Cont. November 19 – JKLM initiated post-plug sampling of water supplies and monitoring wells December 14 - Determination letters sent to 4 additional property owners regarding impacts to water supplies

Investigation What was released Sampling of existing locations Home wells Public water supply wells Surface water Monitoring wells

Products used on well pad Surfactant Isopropanol based soap/foam booster Rock Oil Used to assist drilling, multiple different products may have been used Not authorized products for top hole use Is the last bullet a correct statement

Sampling DEP sampled for: MBAS – indicator of soap Isopropanol 65 Volatile organic compounds and 68 semivolatile organic compounds precise makeup of rock oil not initially known, to be conservative tested for wide range of organic contaminants this is a longer list of constituents than the drinking water list 23 Metals and General Chemistry parameters – brine constituents Methane, ethane and propane

Environmental Sampling Over 100 groundwater wells and springs sampled 9 stream and pond sampling locations Over 500 water samples collected to date between JKLM and DEP

Private Water Supplies Initial results found chemicals related to release in home wells Isopropanol Acetone – associated with surfactant and its degradation BTEX (petroleum related) MBAS increased turbidity Alternative water supplies provided to impacted residents No groundwater sampling results from home wells currently exceed the primary drinking water standards for constituents related to the release Some of the impacted wells still have slightly elevated turbidity The impacted wells will continue to be monitored for any recurrence of the contamination

Private Water Supply Complaints 14 complaints received by DEP 6 positive impact determinations at this time One non-impact determination Seven currently still being evaluated, no determination made at this time

Public Water Supplies Pumps turned off as a precautionary measure to not spread plume No evidence of impact to Public Water Supplies as a result of release Prior to making a determination on restarting the Public Water Supply wells, a 72-hour well purge will be conducted, followed by split sampling

Surface Water Sampling Results 8 sample points established along streams and sampled weekly 9 springs and 1 pond sampled Results 1 spring and pond showed an initial impact No current impacts observed

Monitoring Wells 4 monitoring wells installed on the well pad in late October and early November Constructed to mimic home well construction Packer tests performed to look at specific intervals within wells Geophysical well logging completed of monitoring wells and gas well Sampled before and after abandonment of gas well Transducer also put in monitoring wells and nearby home wells to look for changes in groundwater elevation during gas well abandonment

Monitoring Well Results Geophysics indicated wells intercepted fracture zones Results of sampling 2 rounds completed Low levels of MBAS, petroleum constituents (BTEX), tert-butyl alcohol and phthalates(plasticizer) found in samples. Additional monitoring well locations being evaluated

Gas Well Plugging and Abandonment October 21st Notice of Intent to Plug a Well form submitted to DEP November 17th Cleaned out well bore from 0 to 684’ (attainable bottom at 684’) Set bottom cement plug from 634’ – 684’ November 18th Wait on bottom plug cement to set Placed gravel from 374’ – 634’ November 19th Placed gravel from 259’ – 374’ Placed sand filter from 190’ – 259’ Set top cement plug from 0 – 190’ Weld plate/monument on top of casing Plugging Certificate due December 19th

Ongoing activities Samples from 15 groundwater locations and 8 surface water locations collected on a weekly basis, includes public water supply wells and impacted home wells Hydrogeologic evaluation and sampling of monitoring wells on-going Department enforcement action still being developed

Planned Future Activities Permanently restore/replace impacted water supplies Resume operation of public water supply wells at request of water system operators after satisfactory testing results received A report will be submitted summarizing all activities once investigation is complete

Contact Dan Spadoni Community Relations Coordinator Department of Environmental Protection Northcentral Regional Office 208 West Third Street Suite 101 Williamsport, PA 17701 570.327.3659 dspadoni@pa.gov