Senior Project 24’x24’ structure By: Andrew LeBlanc ET-493 Fall 2013-Spring 2014 Advising by: Rudolph Rode and Byron Patterson.

Slides:



Advertisements
Similar presentations
Building Codes, Zoning Ordinances
Advertisements

Undergraduate Renewable Energy Courses and Certification Tests John Martini University of Arkansas – Fort Smith ASSET II Annual Meeting Springdale, AR.
Robert Adkins Et 494 Instructor: Dr. Cris Koutsougeras Advisor: Mr. Rode 12/04/2013.
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
Habitat for Humanity Design Review April 2, 2002.
Habitat for Humanity Final Presentation May 3, 2002.
7 Set of Floor Plans Primary Considerations
Chapter 1 Professional, Architectural Careers, Office Practice, and Opportunities.
Steel Building Apartment- Design and Build Sutton Yanosky ET494 – Dr. Cris Koutsougeras Advisor –Mr. Rode.
Where in the World? -Our home is in New Jersey because the State of New Jersey gives generous rebates on top of the rebates granted by the US Government.
Rocky River Design and Engineering Academy Drafting Technology Related Course Offerings Instructor: J. S. Gretsuk.
Module 6/7: DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
Senior Project 24’x24’ structure By: Andrew LeBlanc ET-494 Fall 2013-Spring 2014 Advising by: Rudolph Rode and Byron Patterson.
Genesis Solar Module Brochure ™
DUNLEITH LANE DRAINAGE SYSTEM Justin Lyle and Cody Binder ET 493- Senior Design Advisor: Mohamed Zeidan Construction ET 10/08/2014.
Southeastern Sustainability Center Addition
Steel Fabrication & Erection of Belle Chasse Primary School Belle Chasse, LA Derek Duhon ET Instructor: Chris Koutsougeras Advisor: Edward Rode’
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
Jacob Ruiz W# ET Senior Design Instructor: C. Koutsougeras Advisors: R. Rode May 9, 2014 Jacob Ruiz W# ET Senior Design Instructor:
Agricultural Careers Electrician By: Dr. Frank Flanders and Anna Burgess Georgia Agricultural Education Curriculum Office Georgia Department of Education.
DUNLEITH LANE DRAINAGE SYSTEM Justin Lyle and Cody Binder Senior Design Advisor: Mohamed Zeidan Construction ET 10/08/2014.
ET 493 Senior Design Spring 2013 By: Justin Cifreo, Benjamin Gabriel, Nathan Taylor Instructor: Dr. Cris Koutsougeras Advisor: Dr. Junkun Ma Mechanical.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Senior Design Project Office Building By: Heath Yeager ET – 493 Spring 2014 Advisor: Mr. Rudolph Rode.
Intermodal Center / Multimodal Terminal Presentation Guidelines.
Geary Public School 2010 Bond Issue Vote Tuesday December 14, 2010.
Company Presentation Elie G. Andary Vice President, Construction Operations ANDARY ENGINEERING E n g i n e e r s a n d C o n s t r u c t o r s.
Senior Design Project Et 493 Design of a Two-story Office/Apt For: Dr. Cris Koutsougeras Advisor: Mr. R.E. Rode Prepared by Joshua Price.
Sustainable Construction Methods
Chapter 2 Introduction to Construction Procedures
ET 494 Senior Design II Fall 2013 By: Justin Cifreo, Benjamin Gabriel, Nathan Taylor Instructor: Dr. Cris Koutsougeras Advisor: Dr. Junkun Ma Mechanical.
FOOD ENGINEERING DESIGN AND ECONOMICS
Patrick Roach Robert Arena ET-493 Fall 2014 Instructor: Cris Koutsougeras Advisor: Edward Rode.
HUNTING CAMP FACILITY BY: Ryan Fremin ET 493 Senior Design Construction Engineering Technology Professor: Dr. Koutsougeras Advisor : Mr. Rode.
EDT Cabin Design Project - Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E.
HUNTING CAMP FACILITY BY: Ryan Fremin ET 494 Senior Design II Construction Engineering Technology Professor: Dr. Koutsougeras Advisor : Mr. Rode.
Nikolaus Sires ET-493 Advisor: Dr. Rana Mitra. Problem 1 The site of this senior project is a pond of approximately three acres. I desire to remove one.
Name of the course :Building construction Course code :HED 228 Credit hours :3hours Prepared by Eng. Nadir Abd alrazig siddig.
Architectural Drafting Mr. Higgins
IET 120 CONSTRUCTION PROJECT Name: Elizabeth McClain.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
S09/02 Setting the scene: Two taskswww.scriptureunion.org.uk/light Page: 1 of 6© Scripture Union 2004.
Organize Project Team 1 Project is to build Crew Boat facility on Lake Washington Construction Management involves working in teams to meet owner requirements.
CEE 578 Senior Capstone Design Types of Construction Drawings
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
Steel Fabrication & Erection of Belle Chase Primary School Proposal – Fall 2015 ET 494 – Senior Design II Derek Duhon Instructor: Dr. Koutsougeras Advisor:
ET 493: Senior Design Design of a New Hammond Head Start Center By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras Advisor: Mr. R. Edward.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
DESIGN OF AIRPORT TERMINAL AND CONTROL TOWER
ET 493 – Senior Design Design of a Multi-Office Building BY: WOODROW WILSON INSTRUCTOR: DR. C. KOUTSOUGERAS ADVISOR: MR. R. EDWARD RODE.
ET 494 – Senior Design II Design of a Multi-Office Building BY: WOODROW WILSON INSTRUCTOR: DR. C. KOUTSOUGERAS ADVISOR: MR. R. EDWARD RODE.
Wall Framing Doors Copyright © Texas Education Agency, All rights reserved.
IRC 2009 OVERALL. SITE PLAN PROPERTY LINES LOCATION OF BUILDING GRADES STREETS.
Upon completion of this module, you will be able to:
Commercial Office Building
Multistory Office Building
Designing a Commercial Shopping Center
Commercial Office Building
Design of a Commercial Shopping Center
Multistory Office Building
ET 494: Senior Design Design of a New Hammond Head Start Center
(Additional materials)
4 November 2013 LEHIGHTON AREA SCHOOL DISTRICT.
Wood Structures Topic 8 Quality Workmanship
Decisions and considerations of choosing or building a new home.
Instructor: C. Koutsougeras
Patrick Roach Robert Arena ET-493 Fall 2014 Advisor: Rudolph Rode
Bellemont Fire Station Addition
Multi-Family Fourplex Apartment
Senior Design Project Prepared for: Dr. Koutsegeras Advisor: E. Rode
Presentation transcript:

Senior Project 24’x24’ structure By: Andrew LeBlanc ET-493 Fall 2013-Spring 2014 Advising by: Rudolph Rode and Byron Patterson

Objective  To design and construct a building in which has the following attributes:  24’x24’  Able to be multifunctional  Leave potential for future development

Overall vision  To make Southeastern’s campus more self sufficient and thus saving the University thousands of dollars per year  Start 10 year plan of constructing a sustainability center

Factors in the design  Since the process of pellet mill production is rather dusty and dirty we must take this into consideration  Furthermore, this means that proper ventilation must be installed throughout the building  Since we will be transporting pellets to another building there must be an opening to complete this transport.  Also, since it is woody product it is subject to combust. To ensure safety we must put into place both a sprinkler system and eyewash station

Research on type of building  Steel building is the best option for the type of work and environment the building will be used for.  Properties do not change considerable with time  Ease of repair.  Expanding existing structures  High strength/weight ratio  High ductility rate  General cost is slightly more

Deliverables  Surveying and soil mechanics. Since the project site is already graded and leveled I plan just to take a survey and soil sample to ensure that the site is indeed leveled and the soil is okay to build upon.  OSHA standards. Follow building codes specifications to ensure safety  Drafting. In this aspects I will draw all plans as preliminary drawings and are suspect to change but will be the foundation of the main design process of the structure. In addition, these drawings will help me to identify the technical specifications of each task at hand.  Construction Materials. Gathering a materials list for the project.  Estimation. Estimate the total project including materials, labor, and construction. The owner in which I will be working with has a budget of 17,000 dollars in which I will have to take into consideration.  Project management. I will have to plan and execute the plans in which I construct to meet timely goals to further the projects overall process and quality.

3d view

Floor plan

Timeline  First semester: Fall 2013  9/23-9/29 Set timeline for execution of desired accomplishments for the semester of fall 13’ and spring 14’  9/30-10/6 Research different types of metal structures and which would be efficient for the project and uses at hand.  10/7-10/13 Research pellet mills and the common factors which would affect the materials used in construction  10/14-10/20 Research OSHA standards which apply to pellet mills and solar panels10/21-10/27  10/28-11/3 Draw and design ideas for possible layout and description of building  11/4-11/10 Survey and plot land where project is going to be  11/11-11/17 Since land is already graded and leveled, sample the soil and grade  11/18-11/24 Flooring plan  11/25-12/1 cont.  12/2-12/8 foundation plan  12/9-12/15 cont.

Timeline cont.  Second semester:  1/6-1/12 footing details  1/13-1/19 cont.  1/20-1/26 wall plan  1/27-2/2 cont.  2/3-2/9 wall details  2/10-2/16 roof framing  2/17-2/23 cont.  2/24-3/2 roof details  3/3-3/9 lighting plan/mechanical plan  3/10-3/16 cont.  3/17-3/23 power plan  3/30-4/6 cont.  4/7-4/13 gather materials list  4/14-4/20 estimate  4/21-4/27 put information gathered into PowerPoint  4/28-5/4 present