Zack Burchman Travis Gang Dana Geer Matt Seekins Faculty Advisor: Mike Rosen GMCR Contacts: Wade Hodge Paul Comey Jason King.

Slides:



Advertisements
Similar presentations
The following photo essay shows a 2011 Hyundai Equus Sedan being transformed from a running passenger car into a specialized platform used for photographing.
Advertisements

Purpose Body Making module is designed for bending the laminated foil film in the shape of a tube, for welding the side seam and for cutting bodies with.
Palestine TV Test Jason Link University of Hawaii ANITA Collaboration Meeting at UCI 4/7/05 – 4/9/05.
Mu2e Production Target Remote Handling By: Michael R. Campbell, Fermi National Accelerator Laboratory, , System Layout Basic.
Steering Columns.
SOLAR TRACKER PROJECT. INTRODUCTION: Solar tracker is a system that is used to track sun light to increase the efficiency of electricity gained from solar.
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
PKI-Anwendungen 6/2/ Base framework. PKI-Anwendungen 6/2/ Bottom frame.
By: Devin Noyes And Mike Ambrisco. Background Azimuth Angle – Angle in deg clockwise from due north. Zenith Angle – Angle in deg up from horizontal.
Team members Duc Le Ron Pahle Thanh Nguyen Khoa Tran Sponsor Edwards Vacuum Ltd. Advisor Dr. Dave Turcic.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
Generating Motion Moving a part adds no value (except in packaging) Moving a tool adds no value unless work is done on part. So, we want to avoid moving.
Heating element to heat rim to approx. 600℉ Track to move cups from one subcomponent to the next. Linear actuator for control upward motion of cup. Cup.
Pneumatic Actuators Brief Overview Kunal Sinha Grad General Engineering EFR : 2 per min.
Drilling machine.
Electric control Presented by Andrew Mitch Sav Little Phil Justin.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
Chapter 8Basic Computer Maintenance  8.1Preventive Maintenance 8.1Preventive Maintenance 8.1Preventive Maintenance  8.2Monitoring System Performance.
Zack Burchman Travis Gang Dana Geer Ryan Neary Matt Seekins Faculty Advisor: Mike Rosen GMCR Contacts: Wade Hodge Paul Comey Jason King.
Tennis Ball Assembly Line Robots have become an important part to the manufacturing industry. The ability of these machines to act human-like makes it.
ROBO-course In association with SeAMK. What is the ROBO-course? It is a Course that teaches how to build and and program robot. The courses idea is to.
Zack Burchman Travis Gang Dana Geer Ryan Neary Matt Seekins Faculty Advisor: Mike Rosen GMCR Contacts: Paul Comey Wade Hodge Jason King.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
Zack Burchman Travis Gang Dana Geer Matt Seekins Faculty Advisor: Mike Rosen GMCR Contacts: Wade Hodge Paul Comey Jason King.
Robotic Sensor Network: Wireless Sensor Platform for Autonomous Topology Formation Project: Sponsored By: Advisor: Dr. S. Jay Yang, CEManager: Steven.
Transverse Feed Assembly Analysis. Transverse Feed Assembly Motion in the X and Y direction was initially planned to occur exclusively in the base plate.
Perry Lapper Progress. Frame With Actuators Outside Frame.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
Zack Burchman Travis Gang Dana Geer Ryan Neary Matt Seekins Faculty Advisor: Mike Rosen GMCR Contacts: Wade Hodge Paul Comey Jason King.
CLIC Permanent Magnet Quadrupole update 1 st December 2010 Mechanical Engineering status N. Collomb1.
IPod analyses Paul, Ethan, Niels. Casing: Plastic cover Dual injection molding ▫White cover ▫Transparant layer on top of this Advantages ▫Lower part cost.
Art 12 x 10 Measure art, i.e. 12 x 10 Measure Face (width) of molding i.e. 1 ½ wide Add width of Art (12) + 2 x width of Frame (3) = 15 inches + 1/8 inch.
Engineer Training Ink Insertion TJ8300 / TJ8500 Ink Insertion.
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
IPC-2221 Connectors and Interconnects
Generating Motion Moving a part adds no value (except in packaging) Moving a tool adds no value unless work is done on part. So, we want to avoid moving.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Mid-Semester Presentation Senior Design October 5, 2010
Generating Motion Moving a part adds no value (except in packaging) Moving a tool adds no value unless work is done on part. So, we want to avoid moving.
Zack Burchman Travis Gang Dana Geer Matt Seekins Faculty Advisor: Mike Rosen GMCR Contacts: Wade Hodge Paul Comey Jason King.
Mar 18, 2003PFIS CDR1 Control System Summary of Changes Since PDR All the motors, drivers, sensors, switches, etc. have been chosen Built up a mechanism.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
6/9/2016 Quick Reference Parts Guide Introduction This Quick Reference Parts Guide is an easy way to locate part numbers to common replacement parts. It.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Piezo Tuning System (PTS)
It’s…….
Rebuilding a 6 m Dish antenna
Material Transfer Apparatus
SeaPerch Structural System
SeaPerch Structural System
Parul Institute of Engineering & Technology
LARP Phase II Secondary Collimator RC1
Jason Link University of Hawaii
Quick Reference Parts Guide Introduction

SeaPerch Structural System
Generating Motion Moving a part adds no value (except in packaging)
Drilling machine.
Generating Motion Moving a part adds no value (except in packaging)
K2 Schematic Analysis and Pictorial Diagram
Control System Summary of Changes Since PDR
SeaPerch Structural System
STEEL PLATES.
Mechanical Bioreactor
Bunker Project Schedule/Budget
SC1R Cold Box PDR Assembly Sequence
JLAB CHL 2K COLD BOX REPLACEMENT
Presentation transcript:

Zack Burchman Travis Gang Dana Geer Matt Seekins Faculty Advisor: Mike Rosen GMCR Contacts: Wade Hodge Paul Comey Jason King

ComponentPrice Vacuum$ Heat Punch$ Frame$ Electrical Components$ TOTAL$

 Still waiting for some minor parts to help tidy everything  Organize and clean up all wiring  Get all subassemblies running together  Mount hardware to framework  Obtain correct measurement info for the linear actuator and stepper motor so they can be programmed accordingly  Assemble the pneumatic system and test

 Finish steel mounting plate for heating element  Install spikes on punch face and on spring mechanism  Mill track and add nylon to ease movement  Cut and mount vacuum tubing  Get lower vacuum mounting box RP’d  Install couplings and get heat/punch moving  Test heating element once it arrives  Integrate entire system and control via PC