Sprint 107 Review / Sprint 108 Planning May 20, 2013.

Slides:



Advertisements
Similar presentations
Connect Team Connect Team Outside Contrib Outside Contrib Unscheduled Backlog Bugs Feature Requests BA Review Requirement Docs Epic Large Tasks or Features.
Advertisements

What is Agile? Agile is a software methodology based on iterative and incremental development, where requirements and solutions evolve through collaboration.
Agenda −Scrum with TFS 2010 using MSF for Agile 5.0 −Planning the Project −How do you plan the project? −Project planning in TFS 2010 −Planning a Sprint.
Building Your Project Work Plan in March 2, 2007 HP Project & Portfolio Management by Dan Gallagher See NOTES page for Presentation Discussion, Tips &
Process and tools Individuals and interactions over Following a plan Responding to change over Comprehensive documentation Working software over Contract.
Scrum. An evolutionary/iterative/incremental/agile software process The main roles in Scrum are: – Scrum team: Team of software developers – Scrum master.
Project Management with TFS 1. What TFS offers for Project Management? Work Item tracking 2 Portfolio backlog Backlog Issue tracking Feature Product Backlog.
New Proposal Review Form Revised 09/10/2008 Office of Sponsored Projects (512)
SQL Wiki Plugin Team Wirox. Team RIT Eugene Marcotte Chris Daniels Paul Yates Matt Blackwood J. Scott Hawker Xerox Tim Luksha Peter Alfvin.
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
PopMedNet Software Development Life Cycle Chayim Herzig-Marx Harvard Pilgrim Health Care Institute Daniel Dee Lincoln Peak Partners.
Label production Solution with Label Gallery programs Label Gallery is used for general label design and print GalleryForm is used to create data entry.
Copyright © The OWASP Foundation Permission is granted to copy, distribute and/or modify this document under the terms of the OWASP License. The OWASP.
CONNECT 4.0 Technical Deep Dive February 19, 2013.
Sprint 114 Review / Sprint 115 Planning August 26th, 2013.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group December, 2011 Austin, TX PWG F2F.
Sprint 99 Review / Sprint 100 Planning January 28, 2013.
Summary Report Project Name: Voluntary Universal Healthcare Identifiers Brief Project Description: The VUHID project supplies globally unique healthcare.
CONNECT Roadmap Updated version after June 27 th, 2013 Requirements and Prioritization Meeting 1.
CONNECT: Install Webinar for Code-A-Thon September 7 th, 2010.
VA Pain Coach (VPC) Mobile Applications (Apps) Phase Two (MAP2) Sprint 1 Demo/Review Report April 22, 2015.
Sprint 104 Review / Sprint 105 Planning April 8, 2013.
Second Annual Japan CDISC Group (JCG) Meeting 28 January 2004 Julie Evans Director, Technical Services.
Sprint 112 Review / Sprint 113 Planning July 29 th, 2013.
CONNECT Roadmap Draft version as of February 4 th,
© 2011 IBM Corporation OSLC Communications Workgroup 21 March 2012.
Enhancements to FasTrak PR Project Update Retail Market Subcommittee November 8, 2006 Adam Martinez Mgr, Market Operations DPO.
Sprint 103 Review / Sprint 104 Planning March 25, 2013.
Sprint 115 Review / Sprint 116 Planning September 9th, 2013.
Sprint 158 Review / Sprint 159 Planning May 18 th – June 1 st 2015.
Release Management Configuration management. Release Management Goal Coordinate the processes through the project development life cycle Ensure the.
UK Link Programme Dashboard Report Change Overview Board: 13/05/2014 Critical HLD activities complete enabling entry into Detailed Design Detailed Design.
Sprint 101 Review / Sprint 102 Planning February 25, 2013.
Dr. Nguyen Hai Quan.  Why SCRUM?  What is SCRUM?  Some terms  SCRUM Meetings  Sprint  Estimation  Product backlog  Sprint backlog  Whiteboard.
Sprint 110 Review / Sprint 111 Planning July 1 st, 2013.
Sprint 102 Review / Sprint 103 Planning March 11, 2013.
ARIP Technical Committee Convener Call 07 April
CTI Technical Committee Convener Call 11 May
Sprint 106 Review / Sprint 107 Planning May 06, 2013.
Sprint 108 Review / Sprint 109 Planning June 3 rd, 2013.
Query Health Distributed Population Queries Implementation Group Meeting October 11, 2011.
Query Health Distributed Population Queries Implementation Group Meeting February 7, 2012.
Sprint 169 Review / Sprint 170 Planning Oct 19 th – Nov 2 nd 2015 – s169.
Sprint 116 Review / Sprint 117 Planning September 23th, 2013.
Sprint 105 Review / Sprint 106 Planning April 22, 2013.
Request for Service (RFS) Process and Metrics Update June 24, 2008.
Environmental Protection Agency 1 The High Production Volume Information System (HPVIS) Demonstration and Status National Environmental Partnership Summit.
SCRUM.
Sprint 170 Review / Sprint 171 Planning Nov 2 nd – Nov 16 th 2015 – s170.
HIE Certified Network Pilot Testing w CONNECT May 02, 2013.
CONNECT CCB Meeting May 16, Balancing current + future needs CONNECT needs to support the current 2012 production and operational needs of the Federal.
Objectives: Upgrade Siebel to a supported application Upgrade Oracle database to current version Deliver all existing user functionality with no degradation.
Sprint 174 Review / Sprint 175 Planning Dec 28 th – Jan 11 th 2016 – s174.
Sprint 113 Review / Sprint 114 Planning August 12th, 2013.
Sprint 175 Review / Sprint 176 Planning Jan 11 th – Jan 25 th 2016 – s175.
Sprint 173 Review / Sprint 174 Planning Dec 14 th – Dec 28 th 2015 – s173.
1Copyright © 2012, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group August, 2012 Redmond, WA PWG F2F.
C Copyright © 2006, Oracle. All rights reserved. Integrating with Oracle Streams.
NASBLA Social Media: What is it for? NASBLA is involved in numerous Social Media that all serve a distinct purpose. So, what are they all for?
Scrum Overview. Agenda What is scrum…and what it isn’t Scrum’s Characteristics The Scrum Process Scrum Phases Measurements Key Practices Backlogs Sprint.
IBM Software Group ® WebSphere ® Support Technical Exchange Transactions in WebSphere Process Server Lalitha Chandran.
#msdevcon Community Track IMPLEMENTATION OF SCRUM Bernardin Katić Insa Investment Software AG.
Managing Software Development Projects with Jira.
Sprint 177 Review / Sprint 178 Planning Feb 8 th – Feb 22 nd 2016 – s177.
Scrum.
Scrum MODULE 3 – Part 3.
Summarizing Our Models to Date
Scrum - Plan a Sprint Great Video (but added release /sprint layer)
MTS#59 - Input from CTI Silvia Almagia May 2013
Scrum in Action.
Presentation transcript:

Sprint 107 Review / Sprint 108 Planning May 20, 2013

Sprint Resource Pages For this sprint, visit: nt+107+Progress+Summary nt+107+Progress+Summary For next sprint, visit: nt+108+Progress+Summary nt+108+Progress+Summary For information on the CONNECT 4.1 release visit: 2

Sprint 107 Summary - Cumulative Flow 3 To Do In Progress QA Done

Sprint 107 Summary - Burndown Chart 4

Sprint 107 Summary – Sprint Stats Points committed = 18.5 –Initial points committed – 12.5 –7 tickets added for 6.0 points of effort, totaling 18.5 points for sprint Tickets committed to sprint = 20 Tickets completed = 20 Points remaining (unclosed) at end of sprint = 0.0 Points completed in sprint (velocity) =

Sprint Proposed Themes Continued Testing for Java 6 & Java 7 Support –Testing on WebSphere 7 Multi-Specification Identification for QD/RD (Initiating) –Review initiating design approach with technical leads from Federal Partners (conference call) –Begin development Run Healtheway certification pilot test cases for a vendor gateway –Continue working on the updated list of Pilot test cases KI/Table+1+-+Test+Cases+%28subset%29 6

Sprint What We are Showing Today CONNECT 4.2  Support adopters/federal partners that want to use CONNECT with Java 6 (Feature request – CONN-350) –CONN-362 – Test CONNECT Testing on WAS 7 /Java 6  Testing during Sprint 107 completed the majority of the work for this feature, one ticket will remain for Sprint 108 Demo (Testing page showing our completed testing configurations) KI/Supporting+Java+version+6https://developer.connectopensource.org/display/CONNECTWI KI/Supporting+Java+version+6 7

Sprint What We are Showing Today  Enhancing multi-specification version support for QD and RD (responding and initiating) (Feature request – CONN 46 & 15) –Held initiating design approach review on May 14 th –Link to initiating design approach- –Development began on responding approach –CONN Update NHINC Assertion Type schema to support initiating and responding multi-spec enhancements –CONN Add 3.0 QD endpoint –CONN Populate ImplementsSpecVersion for QD and RD 2.0 and 3.0 endpoints(unsecured adapter interfaces) 8

Sprint What We are Showing Today Participation in the HealtheWay pilot –CONN Execute smoke test cases for pilot testing –CONN Execute pilot test cases for PD –CONN Execute pilot test cases for QD –CONN CONNECT not populating wsa-To value –CONN Empty relatesToList value on the Entity interfaces results in an empty but existent wsa:RelatesTo header –Working with CCHIT discovered a MTOM issue related to PD and QD: Related tickets addressed this sprint ( CONN-426, CONN-430, CONN-432, CONN-428, CONN-429) Demo (Status on test cases) le+1+-+Test+Cases+%28subset%29 9

Sprint What We are Showing Today Custodial Agent and Community Support Community and Federal Partner Support –CONN Direct Mail Poller is running even after the CONNECT application is undeployed or stopped/disabled –CONN Direct is failing in WebSphere 8.5/7.0 if database event logger is enabled –Prepare for May 21st CONNECT User Group meeting (Devlopment & Test resources weren’t required during this sprint) Custodial Agent Duties 10

Sprint Proposed Themes Final testing ticket for Java 6 & Java 7 Support –Testing on Solaris/ SPARC operating system Multi-Specification Identification for QD/RD –Complete development for responding messages –Begin development for initiating messages Run Healtheway certification pilot test cases for a vendor gateway –Continue working on the updated list of Pilot test cases KI/Table+1+-+Test+Cases+%28subset%29 –Estimate completing test cases by Pilot end date of May 31 Support the May 21 st CONNECT User Group Meeting; George Washington University 11

Sprint 108 – Other tasks Other tasks –Partner and Community Support –Ongoing Custodial Agent Duties Product Backlog selectedProjectId=

CONNECT 4.0 Community Announcements CONNECT Awareness –Open sprint review and planning meetings  Next sprint meeting will be June 3 th –CONNECT 4.0 Blogs and Forum posts – resources/forumshttp:// resources/forums –CONNECT User Group meeting May 21 st – Call for participation and abstracts underway 13

Questions and Discussion 14