Giga-bit Geodesy e-VLBI at 22GHz Hiroshi Takaba Gifu University, Japan.

Slides:



Advertisements
Similar presentations
SCARIe: Realtime software correlation Nico Kruithof, Damien Marchal.
Advertisements

E-VLBI down-under Tasso Tzioumis ATNF, CSIRO July 2005 Towards e-VLBI.
Giga-bit Geodesy e-VLBI Using the Super-Sinet Hiroshi Takaba (Gifu University, Japan)
Status of KVN Instrumental Phase Calibration System Development Do-Heung Je 1, Moon-Hee Chung 1, Ji-Man Kang 1, Seung-Rae Kim 1, Min-Kyu Song 1, Sung-Mo.
Japanese VLBI programs, East Asian VLBI Network and Space VLBI;VSOP-2 H.Kobayashi(NAOJ) 2011, Jan., 27 Future of VLBA.
Current status of OCTAVE
Prototype SKA Technologies at Molonglo: 3. Beamformer and Correlator J.D. Bunton Telecommunications and Industrial Physics, CSIRO. Australia. Correlator.
Ongoing e-VLBI Developments with K5 VLBI System Hiroshi Takeuchi, Tetsuro Kondo, Yasuhiro Koyama, and Moritaka Kimura Kashima Space Research Center/NICT.
15 Sep 2006 IVS VLBI2010 Haystack0 It’s About Time !!!!!
VSOP-2 Ground Link Station - Tracking Station Requirements - National Astronomical Observatory of Japan Y. Kono.
Current LBA Developments Chris Phillips CSIRO ATNF 13/7/2005.
E-VLBI developments with the K5 VLBI system Koyama Yasuhiro *1, Kondo Tetsuro *1, Kimura Moritaka *1, Takeuchi Hiroshi *1, and Masaki Hirabaru *2 *1 Kashima.
SKA-Japan Industry Forum [SKA-Japan Workshop 2010] EMC & Microwave Systems November 05, 2010.
KVN Current Status of Daejeon Correlator for EAVN Se-Jin Oh and staff of Correlator team of KASI/NAOJ 8 th East Asian VLBI Workshop, 8~10 July
Developments for real-time software correlation e-VLBI Y. Koyama, T. Kondo, M. Kimura, M. Sekido, M. Hirabaru, and M. Harai Kashima Space Research Center,
GBT Spectral Baselines – Tuesday, 11 March 2003 GBT Spectral Baseline Investigation Rick Fisher, Roger Norrod, Dana Balser (G. Watts, M. Stennes)
Trial on the Efficient Use of Trunk Communcation Lines for VLBI in Japan Noriyuki Kawaguchi NATIONAL Astronomial Observatory,Japan eVLBI Workshop
New correlator MicroPARSEC Igor Surkis, Vladimir Zimovsky, Violetta Shantyr, Alexey Melnikov Institute of Applied Astronomy Russian Academy of Science.
LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.
Update on LBA Technical Developments CASS Chris Phillips 11 October 2013.
Spectral Line VLBI Chris Phillips JIVE The Netherlands Chris Phillips JIVE The Netherlands.
上海天文台 Shanghai Astronomical Observatory e-VLBI Progress in China Zhang Xiuzhong, team of Chinese VLBI Network Shanghai Astronomical Observatory Chinese.
Kondo, T. *1*2 and T. Hobiger *2 Kondo, T. *1*2.
TOW 2007: Correlator Theory Kerry Kingham - U.S. Naval Observatory Roger Cappallo – Haystack Observatory Mike Titus - Haystack Observatory.
1 1 January 27, 2009 VLBI2010 Proof-of-Concept Signal Chain Arthur Niell MIT Haystack Observatory.
The Gala-V, our unique solution for the VLBI2010 Kazuhiro Takefuji On behalf of VLBI Group of NICT/Kashima.
(Spectral Line) VLBI Chris Phillips CSIRO ATNF Chris Phillips CSIRO ATNF.
A Proposal Constructing mm/sub-mm VLBI Network by East-Asian Power M. Miyoshi (NAOJ) EAVN Symposium Hokkaido Univ. 2015/07/10 1 Oct VERA
ASTROMETRY OBSERVATION OF SPACECRAFT WITH VERY LONG BASELINE INTERFEROMETRY ---- A STEP OF VLBI APPLICATION FOR SPACECRAFT NAVIGATION ---- M.Sekido, R.Ichikawa,H.Osaki,
Radio Astronomy Applications Group Kashima Space Research Center National Institute of Information and Communications Technology EGU2005 GI3-1TH5P-0057.
The OCTAVE-DAS and correlator system for VERA, JVN, Japanese e-VLBI(OCTAVE) and KJJVC Tomoaki Oyama1, Yusuke Kohno1, Syunsaku Suzuki1, Masahiro Kanaguchi1,
Eleventh Synthesis Imaging Workshop Socorro, June 10-17, 2008 THE VLBA SENSITIVITY UPGRADE Craig Walker, NRAO.
1 Gbps Disk-Based VLBI Observation for Future East Asia VLBI Observations Kiyoaki Wajima 18 March 2009 동아시아 VLBI 워크샵 Yamaguchi University Introduction.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
E-VLBI and End-to-End Performance Masaki HirabaruYasuhiro KoyamaTetsuro Kondo NICT KoganeiNICT Kashima
Possible Engineering Support for Dual Polarization and Ultra Wide Band Observation with EAVN N. Kawaguchi National Astronomical Observatory East Asia VLBI.
The Progress Report for KVN Construction Seog-Tae Han and KVN staffs Korea Astronomy and Space Science Institute March18 th 2009.
Status and future of East Asia VLBI network H.Kobayashi(NAOJ) East Asia VLBI
Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Correlator.
The ALMA Phasing Project (APP) APP is an ongoing ALMA Development Project (approved in 2012) to provide the hardware and software necessary to coherently.
VLBI2010 Phase Calibration Signal Generator and Broadband Considerations Christopher Beaudoin Research Engineer MIT Haystack Observatory.
The Future of the VLBA 27 & 28 January 2011 Arecibo, the VLBA and the HSA Chris Salter Arecibo Observatory (National Astronomy & Ionosphere Center) ‏
VLBI Oct Development Status of Broadband VLBI System (Gala-V) -(II) M.Sekido (1), K.Takefuji (1), H.Ujihara (1), M.Tsutsumi.
Astrometric VLBI Observation of Spacecraft with Phase Delay M.Sekido, R.Ichikawa,H.Osaki, T.Kondo,Y.Koyama (National Institute of Information and Communications.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
Possible eVLBI connection between Eastern Asian Observatories Noriyuki KAWAGUCHI National Astronomical Observatory, Japan eVLBI Workshop
Radio Astronomy Applications Group Kashima Space Research Center IUGG2003, Sapporo (C) ISAS Orbit Determination of The NOZOMI Spacecraft using Differential.
M.P. Rupen, Synthesis Imaging Summer School, 18 June Cross Correlators Michael P. Rupen NRAO/Socorro.
Institute of Applied Astronomy Third International VLBI Technology Workshop, Groningen/Dwingeloo, Netherlands, November 10-13, 2014 Current State of Russian.
About JVN about JVN Status Status Results Results Future plans Future plans Japanese VLBI Network (JVN): recent results and future plans for EAVN Kenta.
Correlators ( Backend System )
Improvement of PCAL Signal Distribution on RT-32 Radio Telescopes
Multifunctional Digital Backend (MDBE) for "Quasar" VLBI-network
Celestial and atmospheric H2O detection by direct RF sampling
Haystack Geodesy Program and Technical Development
e-VLBI Deployments with Research Internet
EVLA Advisory Committee Meeting System Status
TWSTFT using DPN signals
Astrometry Observation of Spacecraft with Phase delay
EVLA System PDR System Overview
EVLA M/C Software PDR, 14 May 2002
Observational Astronomy
Observational Astronomy
Simultaneous Multi-Frequency Obs. -Phase Compensation, mm-VLBI
Orbit Determination of The NOZOMI Spacecraft using Differential VLBI Technique According to the ISAS announcement the NOZOMI has completed its final Earth.
(National Astronomical Observatory of Japan)
M.Sekido, R.Ichikawa,H.Osaki, T.Kondo,Y.Koyama(CRL)
Correlator Growth Path
EVLA Advisory Panel Mtg. System Overview
ATCA Wideband Continuum Operation
Presentation transcript:

Giga-bit Geodesy e-VLBI at 22GHz Hiroshi Takaba Gifu University, Japan

Pacific Plate Philippine Sea Plate Gifu Univ. 11m Eurasia Plate North American Plate NAOJ Kagoshima 20m NTT Connection(2.4Gbps) JGN3 (10Gbps) Super Sinet(4.8Gbps) Future Plan GSI Tsukuba 32m NICT Kashima 34m Hokkaido Univ 11m NAOJ Mizusawa 20m ISAS Usuda 64m NAOJ Yakaguchi 32m NAOJ Nobeyama 45m e-VLBI network

鵜飼 Cormorant Fisher, a famous fishing method in Gifu 鮎(AYU) From May 11 to Oct 1

Accuracy of the Geodesy VLBI Accuracy of delay time for one observation Δτ ∝ 1/ SNR Δτ ∝ 1/Bandwidth ~ 1/(Radio Frequency) Accuracy of the Geodesy VLBI Formal Error ∝ Δτ/√(Number of observations) => e-VLBI with Higher Frequency!

Importance of Geodesy for Radio Astrometry For micro-arcseconds Astrometry => less than 1mm accuracy is required! VERA Project, NAOJ S/X, 22GHz, 43GHz

Status for 22GHz System of Gifu 11m antenna Install 22GHz receiver ( Dec ) Cooled LNA to 11K, Trec ~ 20K Tsys ~ 100K at zenith 2Gbps e-VLBI Tests ( April-Dec ) with NICT Kashima 34m antenna 1Gbps geodesy VLBI (Tape Recording) with NAOJ VERA (Oct. 2007)

Gifu 11m - Kashima 34m 22GHz Band e-VLBI 2 Gbps 、 16seconds integration SNR ~5 8 ( Apr.2007 )

Purpose of this Work Development of the Giga-bit e-VLBI system at 22GHz for Geodesy and Astrometry, 2Gbps x 2ch (Now) 2Gbps x 4ch (Next Step)

Giga-bit e-VLBI System Hardware A/D converter(ADS1000): NICT 1024Msps, 2bit sampling =>2.048Gbps Optical transceiver: NAOJ XF type 256 lags Correlator: NAOJ Software Observation Software: Gifu Univ. & NAOJ Analysis Software: Gifu Univ.,NICT & GSI

Giga-bit Realtime e-VLBI instruments at Gifu University Optical Transceiver 2.4Gbps×2 links A/D Converter 2 channels XF Correlator 3 Baselines Control Computer

Real time Correlator Optical Transceiver OC48(2.4Gbps)× 2 A/D converter 2Gbps×2ch Super-Sinet OC48(2.4Gbps) Super-Sinet OC48(2.4Gbps) Super-Sinet OC48(2.4Gbps) Fusion Research Lab. NAOJ ( Mitaka City ) High Energy Lab. Tsukuba Gifu Univ. 11m Telescope32m Telescope Gifu Prefecture’s Information Super Highway Tsukuba CATV Super- Sinet Super- Sinet Geodesy e-VLBI using the Super-Sinet Optical Transceiver OC48(2.4Gbps)× 2 A/D converter 2Gbps×2ch Real time Correlator S X SX SX 100km 7km 300km100km

Real Time e-VLBI, Gifu11m-Tsukuba 32m Sband was processed at Mitaka Correlator Xband was processed at Gifu Correlator Display the fringe pictures every 1 seconds Sband Xband

Geodesy VLBI with K4/K5 and e-VLBI Results of the K4/K5 and e-VLBI coincidents within 3mm !

Problems for Wide-Band VLBI (found from S/X bands e-VLBI) K4 or K5 uses Narrow Bands System with P-cal, video converters, and many samplers => Determine delay time by Band Width Synthesis Method Giga-bit system uses Wide Band IF with only one sampler! How can we determine Delay Time?

Tsukuba32m-Gifu11m e-VLBI data 1 second integration data 1024MHz sampling => 1 lag ~ 1 ns Giga-bit e-VLBI data have very high SNRs, can determine delay time every 1 second! Delay time by Gaussian fitting 1ns 1 sigma 40ps, 100seconds =>4ps

Original data Rotate phases when gap exists Liner Fitting => delay time Delay time determination from phase gradient Frequency (MHz) Phase(degree)

Problem for the Phase Gradient Method Phase shift caused by the band pass filter

Accuracy of the delay time, Gaussian fitting vs Phase gradient => Gaussian fitting method is better Sigma of the delay time by Gaussian fitting [ps] Sigma of the delay time by phase gradient [ps] Strong Source Weak Source

High Speed A/D converter NAOJ is now developing 35GHz A/D => Direct Sampling should be possible at 22GHz with higher mode sampling mode => No Band Pass Filters, Down Converters! => Good phase stability for wider band width!

InP HBT AD Converter developed by NAOJ ADC DMX RF Signal A 32-GHz signal was successfully digitized with 3 bits. (Kawaguchi, 2006)

Another Problem for Giga-bit e-VLBI Comparison of the delay time for K4, K5, and Giga-bit e-VLBI => large drift of the delay time exists only for Giga-bit e-VLBI!

Differences of the delay time for K4 and Giga-bit e-VLBI 1ns Obs. # Xband pico-seconds K4 - Giga-bit e-VLBI 1day

Almost same as K4 Differences of the delay time for K5 and Giga-bit e-VLBI Xband pico-seconds K5 - Giga-bit e-VLBI

No large drift ! Differences of the delay time for K4 and K5 Xband pico-seconds K4-K5 (JD0404)

X band S band K5 - Giga-bit e-VLBI

LNA P-cal Hydrogen Maser Down Converter VLBI Back end 5MHz signal by co-axial copper cable IF signal by optical fiber cable Observation Room Receiver Room More than 100m for large Antenna P-cal system cancels the delay time drift by using the same path for reference signal transfer with down converter!

Giga-bit e-VLBI system for 22GHz High Speed Sampler, working at 22GHz Eliminate band-pass filter and down converters Use digital filter for multi-channel analysis P-cal injection for Phase calibration and delay time correction

LNA P-cal Hydrogen Maser A/D Converter VLBI Backend 5MHz signal by co-axial copper cable VSI data by optical fiber cable Observation Room Receiver Room More than 100m for large Antenna Digital Filter

Conclusion Radio Astrometry needs Geodesy VLBI 22GHz e-VLBI system is under-developing Some Problems were fond for Giga-bit e-VLBI, but will be cleared by using the new RF A/D converter and P-cal system!