US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.

Slides:



Advertisements
Similar presentations
Ramesh Gupta, BNL D1 Dipole Design / IR Magnet Study LARP Collaboration Meeting, Oct 5-6, D1 Dipole Design Task (terminated in 2005) IR Magnet Study.
Advertisements

SC Magnets at Fermilab New Collaring and Coil Pre-stress Limit for a Nb3Sn Magnet Alexander Zlobin Technical Division Fermilab.
1 House, Apr 25, 2004 Accelerator Physics from the Tevatron to the LHC Steve Peggs, BNL - How to increase the luminosity - Beam-Beam.
1 LARP Magnet Program G. Ambrosio Many slides from (with a few modifications): Jim Kerby for the LARP Magnet Collaboration 25 October 2006 Rad-Hard Insulation.
Eric Prebys, FNAL.  So far, we’ve talked about nice, periodic lattice, but that may not be all that useful in the real world. In particular, we generally.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Overview of Possible LHC IR Upgrade Layouts CARE HHH-2004 Workshop CERN 8-11 November 2004 J. Strait, N.V. Mokhov, T. Sen Fermilab bnl - fnal - lbnl -
 An h=4 (30 MHz) RF system will be used for electron operation. For protons, this would correspond to h=56, and the 1 kV maximum gap voltage would only.
Round table magnet discussion and conclusions CARE-HHH IR’07 animated by W. Scandale and F. Zimmermann.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
Eric Prebys LARP Program Director 1/8/09.  This meeting will be both and update and an official response to the review of LARP which took place at LBNL.
E. Todesco PROPOSAL OF APERTURE FOR THE INNER TRIPLET E. Todesco CERN, Geneva Switzerland With relevant inputs from colleagues F. Cerutti, S. Fartoukh,
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
Eric Prebys LARP Program Director Jaunary 14, 2009.
F LARP magnet R&D program Giorgio Ambrosio TD/MSD FNAL Annual Program Review September 07 OUTLINE LARP goals FNAL contribution to LARP FNAL core-program.
 Guidance from DOE  $13M with a 6 month continuing resolution at 84%.5*.84*13+.5*13 = $11.96M  Separate money ($1-2M) found for APL planning!  General.
Eric Prebys Fermilab APC Program Director, LARP April 15, 2010.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) February 16, 2010.
 Good  LARP has grown significantly in size since it started  Gained credibility both here and at CERN US Labs like it as a way to support work CERN.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Paris 5 September 2005 HHH Status progress W. Scandale CERN Accelerator Technology Department CARE-HHH Network: coordinators: F. Ruggiero and W. Scandale.
Bnl - fnal- lbnl - slac US LHC Accelerator Research Program A Quadrupole Design for Crab Cavity Optics Ramesh Gupta Brookhaven National Laboratory Upton,
Partikeldagarna, Göteborg 21 September 2007 LHC: Status and Plans Lyn Evans.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Eric Prebys, Fermilab Director, LARP November 13, 2014.
Eric Prebys, Program Director US LHC Accelerator Research Program (LARP) 10/24/2008 Ultimate tribute Sept 10, 2008.
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
Guido Sterbini CERN – MCS - MA Section Meeting, 8 th February 2007.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
Eric Prebys Accelerator Physics Center Program Director, LARP December 7, 2009.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
J. Strait Fermilab 16 October 2006 Consideration on LHC upgrade from A US perspective.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
F LHC Accelerator Research Program Accelerator Systems Tanaji Sen FNAL/APC  Project management  Accelerator Physics  Instrumentation  Beam commissioning.
2009 US LHC Users MeetingGianLuca Sabbi, LBNLUS LHC Accelerator Research Program © CERN US LHC Accelerator Research Program US LHC Users Organization Annual.
Joint IR Studies: Operating Margins Nikolai Mokhov Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program LARP Collaboration Meeting SLAC.
HE-LHC, 10/14/2010GianLuca SabbiUS LARP Magnet Development LHC Accelerator Research Program Magnet Development GianLuca Sabbi for the US LARP collaboration.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Eric Prebys LARP Program Director January 14, 2009.
U.S. Activities on the High-Luminosity LHC: LARP Sustainability & Evolution as a Construction Project HiLumi-LARP Collaboration Meeting October 26, 2015.
Already time to think of upgrading the machine Two options presently discussed/studied Higher luminosity ~10 35 cm -2 s -1 (SLHC) –Needs changes in.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) February 4, 2011.
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
Eric Prebys, Fermilab Director, LARP October 29, 2010 *plus a bit of LAFS.
E. Todesco, Milano Bicocca January-February 2016 Unit 2 Magnets for circular accelerators: the interaction regions Ezio Todesco European Organization for.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
LARP Joint IR Studies A. Zlobin, Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program CARE-HHH-APD Mini-Workshop IR’07 Frascati (Italy),
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) May 16, 2011.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
Closeout Presentation June 2, Annual Review of the LHC Accelerator Research Program.
Eric Prebys, Fermilab Director, LARP November 13, 2014.
Eric Prebys LARP Program Director 7/13/09.  Background  Progress and Highlights in 2010  Summary of findings from last review  Chamonix  New schedule.
Eric Prebys Accelerator Physics Center Program Director, LARP Important material Contributed by Elliott McCrory (FNAL), Ryoichi Miyamoto (BNL), Alan Fisher.
US LHC Accelerator Research Program (LARP)
LARP Role in Plans for HL-LHC Upgrades Giorgio Apollinari - US LARP Director USLUO, UW Madison – November 6th- 8th, 2013.
To be presented at Nb3Al R&D Review,
LHC Status, Upgrade Path, and US Contributions
LHC Status, Upgrade Path, and US Contributions
LHC (SSC) Byung Yunn CASA.
EIC Accelerator Collaboration Meeting
Lecture II.
Muon Collider Magnet Technologies/Challenges
Muon Collider SR and IR Magnets
Review of Quench Limits
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Presentation transcript:

US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to CMS or ATLAS)  Originally FNAL, BNL, and LBNL  SLAC joined shortly thereafter  Some work (AC Dipole) supported at UT Austin  LARP Goals  Advance International Cooperation in High Energy Accelerators  Advance High Energy Physics o By helping the LHC integrate luminosity as quickly as possible  Advance U.S. Accelerator Science and Technology  LARP includes projects related to initial operation, but a significant part of the program concerns the LHC upgrades  Current Budget: $12-13M/year. Magnet Systems The goal of the LARP magnet program is to demonstrate the viability of magnets based on Nb 3 Sn superconductor on a timescale which would allow them to be utilized on the LHC Phase II upgrade in approximately Nb 3 Sn allows larger gradients/apertures and/or larger temperature margins than traditional NbTi, but it has never been used to make accelerator quality magnets before. Eric Prebys* *Fermi National Accelerator Lab, PO 500, Batavia IL, Luminosity Monitor An ionization detector installed in the neutral absorbers on each side of the ATLAS and CMS interaction regions. Rate and radiation levels have made the design challenging. Personnel Programs LARP funds two programs to support US personnel working at CERN. 120 mm aperture Accelerator Systems Accelerator Systems includes  Instrumentation o Schottky Monitor o Tune Tracker o AC Dipole o Luminosity Monitor  Collimation o Rotatable Collimators o Crystal Collimation Studies  Accelerator Physics o Beam-beam o Space Charge o Electron Cloud o PS2 (new synchrotron for CERN) o Crab Cavities Rotatable Collimators These collimators have multiple facets, such that damaged surfaces can be rotated away in the event of catastrophic beam loss. AC Dipole This device drives small oscillations in the beam in order to measure both linear and non-linear lattice terms. Toohig Fellowship A competitive postdoctoral fellowship open to recent PhD recipients. Successful candidates are expected to spend approximately half of their time at CERN and half at the LARP host lab of their choice. Crab Cavities Crab cavities are superconducting RF cavities which deflect bunches such that they collide head on, even when the beams cross at an angle. This technology has recently been endorsed by CERN for the Phase II upgrade. Long Term Visitors (LTV) Program This program provides support for more senior personnel to spend extended periods at CERN, doing accelerator related R&D or helping to commission the LHC. Salary is provided by the home institution, while LARP pays relocation and cost of living expenses. PS2 The PS2 has been proposed to replace the 50 year old PS. LARP is taking part in a number of studies, including the effects of electron cloud and space charge. Challenging Material Whereas NbTi remains pliable in its superconducting state, Nb 3 Sn becomes brittle during the required heated reaction steps. Cables must therefore be wound on a mandrill, baked, and then carefully transferred to the magnet. Design Comparison LARP has investigated two designs for the magnets: Collar  Traditional magnet design.  Pre-load provided by a series of collars which hold coils in place. Shell  New concept  Pre-load produced by inflatable bladder, and maintained keys, which are inserted.. Nominal Choice Pushing all Parameters LARP magnet subprograms investigate all aspects of magnet design: Long Quad (LQ) The long quad program has produced a 4m magnet with a 90mm aperture and a design gradient of 200 T/m based on a shell design. It is scheduled to be tested next month. Technical Quad (TQ) 1m magnets with 90mm apertures were produced with both collar and shell designs. All reached gradients of >200 T/m. High Gradient Quad (HQ) A 1m magnet with a 120mm aperture and a design gradient of 200 T/m based on the shell approach is being built and is scheduled to be tested in FY10.