LiteBIRD US Team Meeting 10/13/2015 Team Meeting at UCB SSL1 Intro to SSL.

Slides:



Advertisements
Similar presentations
Abstract Real-time images of Earths space environment from NASAs IMAGE satellite will soon be available on the NOAA Space Environment Center Web site.
Advertisements

Geospace Electrodynamic Connections (GEC) Mission The GEC mission has been in the formulation phase as part of NASA’s Solar Terrestrial Probe program for.
Flare Luminosity and the Relation to the Solar Wind and the Current Solar Minimum Conditions Roderick Gray Research Advisor: Dr. Kelly Korreck.
2014 Workshop on Spacecraft Flight Software 1 Pasadena, CA, December 16-18, 2014 ICON End-To-End Operations Philosophy Will Marchant, Manfred Bester, Carl.
ESA SSA Programme Objective:
An overview of the MESSENGER spacecraft Joshua V. Nelson Chairman, SEDS-USA Note: All images contained in this presentation are courtesy NASA/JPL unless.
Questions from the European colleagues & Answers (only) from the Chinese engineers present for Y.-W. Zhang and S.-G. Yuan Chinese Academy of Space Technology.
Michael Lampton Overview of Space Sciences Laboratory 16 July 2003.
List of investigators PPU’s for Next Generation EP Brian Gilchrist, UM Steve Battel, Battel Engineering (consultant) Alec Gallimore, UM Ken Arnett, UM-Space.
NASA/NSTA Web Seminar: Living and Working in Space: Energy LIVE INTERACTIVE YOUR DESKTOP.
F1B: Determine the Dominant Processes of Particle Acceleration Phase , Open the Frontier UV Spectroscopic determin- ation of pre/post-shock density,
SMART About NASA’s Magnetospheric Multiscale Mission (MMS) MAGNETIC RECONNECTION is a little-understood physical process at the heart of space weather.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
IMPRS June Organigram of ESA, in the late 1980s
ESA Support to SOLAR-B Hermann J. Opgenoorth Solar and Solar Terrestrial Missions Division ESA Science Directorate Programmatic.
NASA, CGMS-41, July 2013 Coordination Group for Meteorological Satellites - CGMS NASA Space Weather Activities Presented to CGMS-41 Ad-hoc meeting on space.
Day 8. Handout and any questions for Jim? Take 10.
Österreichische Akademie der Wissenschaften (ÖAW) / Institut für Weltraumforschung (IWF), Graz, Austria, T +43/316/ , iwf.oeaw.ac.atDownload:2013.
AIAA Panel on Small, Distributed, Fractionated Spacecraft 1 Long Beach, CA Sept. 18, 2007 Introduction THEMIS Overview Lessons Learned Importance of a.
High Altitude Scientific Ballooning (Near Space Engineering)
Engineering Means having to deal with failure Missions to Mars as an example of try, try, try again…
Solar Probe Plus A NASA Mission to Touch the Sun Solar Probe Plus – A Mission to Touch the Sun Rob Decker and Nicky Fox Johns Hopkins Applied Physics Laboratory.
THEMIS/GBO CDR Peer Review 1 Univ.of Calgary, Apr , 2004 Ground Based Observatories (GBO) CDR Peer Review S. B. Mende University of California -
RUSSIAN SPACE MISSIONS FOR SOLAR-TERRESTRIAL SCIENCE ILWS-2011 A.A. Petrukovich, L.M. Zelenyi Space Research Institute V.D. Kuznetsov IZMIRAN.
August 11, 2009 Small Satellites Conference A New Particle Detection Instrument for Space Weather Research with CubeSats David Glaser Space Physics.
Bits and Pieces. Spacecraft Systems Propulsion –Already discussed Communications Science instruments Power.
CHIPSat Cosmic Hot Interstellar Plasma Spectrometer Spacecraft Julius-Maximilians-Universität Würzburg S: Telematik in der Raumfahrt Prof. Dr. Schilling.
Aurora, Substorms, and THEMIS D. G. Sibeck NASA/GSFC THEMIS Project Scientist.
Living With a Star Radiation Belt Storm Probes and Associated Geospace Missions D. G. Sibeck Project Scientist NASA Goddard Space Flight Center.
Science - Coronal heating - Coronal structure / dynamics - Elementary processes in Magnetic Reconnection Mission instruments - Optical Telescope / Vector.
MAVEN MARS ATMOSPHERE AND VOLATILE EVOLUTION.
THEMIS/MIWG#3 1 SSL, 06/15/2005 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS RESOLVING THE MYSTERY OF WHERE, WHEN AND.
THEMIS Workshop 1 UC Berkeley, 18 December 2004 Data Products and Access Tim Quinn UC Berkeley.
TRIO-CINEMA Meeting at KHU 1 October 19-23, 2009 CINEMA Operations Manfred Bester.
THEMIS/SRR ESA- 1 UCB, 06/08/2003 THEMIS Electrostatic Analyzer (ESA) instrument David W. Curtis Space Sciences Laboratory University of California, Berkeley.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
1. G O D D A R D S P A C E F L I G H T C E N T E R 2 New Budget Initiatives for NASA in FY04.
TRIO-CINEMA 1 KHU, 08/10/2010 TRIO-CINEMA Activity in Korea Jongho Seon 10 Aug 2010.
Chapter 13 Section 3 – pg 515 Exploring Space Today.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
TIM 1 UCB, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting Dr. John Wygant, UMN Dr. John Bonnell, UCB Peter Harvey, UCB.
EGU General Assembly 2006, 2-7 April, 2006, Wien ST6 Multi-point measurements of solar-terrestrial plasma: results and future perspectives Scientific objectives.
THEMIS FDMO CDR Peer Review − Appendix 1June 1-2, 2004 Appendix.
Topics in Space Weather Earth Atmosphere & Ionosphere
NASA’s Organization National Aeronautics and Space Administration.
Space Research Institute Russian magnetospheric & heliospheric missions.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
How ARTEMIS Contributes to Key NLSI Objectives C.T. Russell, J. Halekas, V. Angelopoulos, et al. NLSI Lunar Science Conference Ames Research Center Monday,
THEMIS MPDR / CAROR-1UCB, November 12-14, 2003 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS RESOLVING THE MYSTERY OF.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Chris Pasma, SSL Mechanical.
Characteristics of remote sensing satellites. Satellites generally vary in their architecture Usually remote sensing satellites are having two plateforms.
April 2014 At A Glance ASIST is a real-time command and control system for spacecraft development, integration, and operations. Mature and reliable, ASIST.
MPEREnvironmental Test OverviewUCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Environmental Test Overview and Logistics Rick Sterling University.
March 28, 2011 MAVEN SWEA instrument Pre-CDR Peer IRAP March 28-29, IRAP Management MAVEN SWEA Instrument Pre-CDR Peer Review IRAP, March.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
THEMIS FDMO Review Appendix − 1 October 5, 2004 Appendix.
Space Weather Services to Build Global Resilience Expert Meeting on Space Weather Services February 3, 2015 – UNCOPUOS STSC Assembly Goal: Foster greater.
1 “Use or disclosure of the data contained on this sheet is subject to the restrictions on the title page.” Proprietary Space Systems/Loral (SS/L) Organization.
NASA,CGMS-43 May 2015 Coordination Group for Meteorological Satellites - CGMS NASA Space Weather Activities Presented to CGMS-43 Ad-hoc meeting on space.
NASA and Amateur Radio Space Communication Will Marchant, UC Berkeley And
한 미 려 – Introduction (1) 2.Instrument & Observe 3.Science 2.
Mission Critical Design Review (MCDR) June 14-18, 2004
THEMIS THEMIS MPDR Nov 12-14, 2003 University of California, Berkeley
THEMIS THEMIS MCDR June 14-18, 2004 University of California, Berkeley
THEMIS program: an Overview
Welcome to the Sciences and Exploration Directorate!
ISAS Solar Physics Yohkoh (1991- ) Hionotori ( )
Spacecraft Structures
NASA Nasa's Parker Solar Probe mission set off to explore the Sun's atmosphere in the summer of The probe will swoop to within 4 million miles of.
Presentation transcript:

LiteBIRD US Team Meeting 10/13/2015 Team Meeting at UCB SSL1 Intro to SSL

LiteBIRD SSL Conference Rooms 10/13/2015Team Meeting at UCB SSL2 Main Conference Room Annex Conference Room Library Conference Room To reserve a room, or check location, visit

LiteBIRD SPACE SCIENCES LABORATORY Background Initiated in 1958 by Drs. Teller and Seaborg Multidisciplinary organization Connecting campus research to space efforts Facility opened in 1966 New facilities added in 1998 Research Efforts Involving Balloons Sounding rockets Satellite instruments & science complements Complete satellites Mission & Science Operations Ground Station Operations Agencies Involved NASA, NSF, NSBF, USAF, DOE ESA, ISAS, IKI, PSI, etc. $35M/yr (85% NASA, 15% NSF, 5% misc.)

LiteBIRD Facilities sq. ft. Office and Laboratory Space Employing 420 Scientists, Engineers, Staff On-Site Machine Shop Clean Room Facilities to Class 100 Thermal Vacuum Facilities up to 3m diameter Spacecraft Integration Facility 4-story High Bay Mission Operations Centers Science Operations Centers 11 Meter S-Band Satellite Antenna Secure High Speed Communications to NASA assets

LiteBIRD Operations Components Mission Operations Center Science Operations Center 11-meter S-Band Antenna with X-band upgrade capability High Speed Communications to NASA Ground Network Network Security Autonomous Operations – Pass Supports – Tracking and Data Acquisition – Spacecraft Command and Control – Emergency Response System – Self Checking

LiteBIRD Space Flight Instruments Polar Electric Field Wind 3D Plasma Cluster II EFW, CIS IMAGE FUV, WIC Mars Global Surveyor ER Ulysses LAN SOHO UVCS & SUMER STEREO - IMPACT MAVEN Explorer Spacecraft EUVE FAST RHESSI THEMIS (5 ) NUSTAR ICON (in development)

LiteBIRD EXTREME ULTRAVIOLET EXPLORER Project Management Science Package – Telescopes – Electronics Mission Operations Science Operations Launched on 7 June 1992 Mission Successfully Concluded 1Q2001

LiteBIRD FAST AURORAL SNAPSHOT Science Package – Electric Field Instruments – Particle Instruments – Electronics Mission Operations Science Operations Launched on 21 Aug 1996 Mission Ended in 2003

LiteBIRD RAMATY HIGH ENERGY SOLAR SPECTROSCOPIC IMAGER (RHESSI) Project Management Spacecraft Bus (Autonomous Sun-pointed Spinner) Science Instruments – Imager (Rotating Modulation Collimator) – Spectrometer (X-ray detectors) – Electronics (80 Mbps telemetry rate) Mission and Science Operations Launch on Pegasus XL rocket Ground Data Systems inc. 11-meter Antenna Cost Capped at $72 M FY98 inc. Launch Spacecraft was Designed & Built in 22 months Destroyed in a Vibration Malfunction at JPL Rebuilt and Launched February 5, 2002 Mission Operations Were Planned for 2 years  RHESSI is Still Operating after 13.5 years

LiteBIRD Time History of Events and Macroscopic Interactions during Substorms (THEMIS) Project Management Spacecraft Bus (with Propulsion) Science Instruments – EFI (3-Axis Electric Fields) – FGM (3-Axis DC Magnetic Fields) (East Germany) – SCM (3-Axis AC Magnetic Fields) (CNES) – ESA (Low Energy Electrons and Ions) – SST (High Energy Electrons and Protons) 20 Ground Stations located in Canada and Alaska Mission and Science Operations Centers Launched on a Single Delta-II rocket Cost Capped at $180 M FY02 inc. Launch All Five Spacecraft and Carrier cost only $68 M RY Mission Accomplished. Two Are Now in Lunar Orbit!  THEMIS is Still Operating after 8.5 years

LiteBIRD Solar Probe Plus (SPP) FIELDS Instrument Management Science Instruments – EFI (3-Axis Electric Fields) – MAG (3-Axis DC Magnetic Fields) – SCM (3-Axis AC Magnetic Fields) Science Operations Center  FIELDS Delivery to Spacecraft March 2017 Main Electronics Pkg.Antenna (4) SCM MAG (2)