Margaret Byrne, U.S. Fish and Wildlife Service

Slides:



Advertisements
Similar presentations
Summary of Aquatic Programs Administered by the WV Division of Natural Resources Dan Cincotta WVDNR P. O. Box 67 Elkins, WV
Advertisements

NYS Department of Environmental Conservation Update on the Niagara River U.S. RAP Niagara River Remedial Action Plan Implementers Session April 10, 2013.
Dam Removal in Rhode Island: Present and Future David Chopy, DEM July 16, 2009.
BoRit Superfund Site Timeline
Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA)
Vermilion County Brownfield Assessment Grant. Overview Brownfield Basics USEPA Brownfield Assessment Grant Vermilion County Assessment Grant Site Selection.
Identify source area and COCs Determine nature and extent of discharge Evaluate potential risks to public health and the environment Develop Investigation.
 Greenpoint Environmental Benefit Projects Community Meeting 1 March 21, 2012.
River Corridor Closure Project Safety People Results U.S. Department of Energy Richland Operations Office 100 Area and 300 Area Component of RCBRA Steve.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
Nyanza NRD Trustee Council U.S. Fish and Wildlife Service Massachusetts Executive Office of Energy and Environmental Affairs National Oceanic and Atmospheric.
Montana’s 2007 Nonpoint Source Management Plan Robert Ray MT Dept Environmental Quality.
The EU Water Framework Directive and Sediments The Water Framework Directive was transposed into law in EU Member States at the end of Nearly two.
1 Presented By: Matthew Duchesne Office of Environmental Compliance Office of Environmental Management Department of Energy 2010 Long-Term Surveillance.
Environmental Legislation and Agencies Review. Sets a time table for phasing out ozone- depleting substances.
Wetlands Mitigation Policy Sudbury Wetlands Administration Bylaw April 27, 2015.
Update on BP Deepwater Horizon Oil Spill Erin Fougères Pelagic Longline Take Reduction Team Meeting September 16, 2010.
Administrative Law, Tribal Law and the Environment American Bar Association Section of Administrative Law and Regulatory Practice Mid-Year Meeting Seattle,
1 Nyanza NRD Trustee Council November 5, 2008 U.S. Fish and Wildlife Service Massachusetts Executive Office of Energy and Environmental Affairs National.
1 Natural Resource Damages (NRD) – James Woolford Director – Federal Facilities Restoration and Reuse Office/OSWER NGA – Federal Facilities Task Force.
Fish and Wildlife Service Mission Conserve, protect and enhance fish, wildlife, and plants and their habitats for the continuing benefit of the American.
Chapter 45 Environmental Protection and Global Warming.
CONFIDENTIAL Gulf Environmental Benefit Fund July 2015.
Watershed-based Plan To Restore the Hackensack Meadowlands: The Meadowlands Comprehensive Restoration Implementation Plan Terry Doss and Karen Appell The.
Water Quality Planning Division Monitoring & Assessment Section Surface Water Quality Monitoring Program (SWQM)
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
Michael Webster (Cameco Corporation) Tamara Yankovich (IAEA, Formerly Saskatchewan Research Council) Martin Klukas (Atomic Energy of Canada Limited) IAEA.
Gerry Pratt State AOC Coordinator, Division of Water New York State Department of Environmental Conservation 625 Broadway, Albany, NY P: 518.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
Deepwater Horizon Natural Resource Damage Assessment (NRDA) CPRA Update January 26, 2011 restoring and protecting Louisiana’s coast.
Natural Resource Damage Assessment Basics; Applicability to Compacts with FSM and RMI Michael Fry Environmental Contaminants Coordinator U.S. Fish and.
CA Regional Water Quality Control Board San Diego Region CEQA SCOPING MEETING: TENTATIVE CLEANUP AND ABATMEMENT ORDER (CAO) NO. R January 21,
DOE ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP Natural Resource Trusteeship John J. Bascietto
NRDs 101 Vicky Peters Colorado Attorney General’s Office.
Triangle Park Removal Action Area within the Portland Harbor Superfund Site (Portland, Oregon) Jennifer MacDonald Assistant Regional Counsel Office of.
McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 18 Environmental Law.
Potential Addition of Vapor Intrusion to the Hazard Ranking System U.S. EPA Office of Solid Waste and Emergency Response February 24, 2011 Listening Session.
Natural Resource Damages (NRD) Assessment and Restoration Update
State and Tribal Government Working Group November 12, 2008 FERNALD NATURAL RESOURCE DAMAGES SETTLEMENT.
Endangered Species Act of 1973, 1982, 1985, and 1988 By: Nicole Wypychowski Period 6 President Nixon signed the bill December 28, 1973 ESA is administered.
Module 9: Natural Resource Assessment and Damages (NRD)
NATURAL RESOURCE DAMAGES FUNDAMENTALS Joan P. Snyder Stoel Rives, LLP Presented to Oregon Association of Environmental Professionals October 9, 2003.
Channel Rehabilitation Projects TAMWG - June ‘04 Trinity River at Hocker Flat 1/16/2003.
The Endangered Species Act 1973, 1982, 1985, 1988
The Endangered Species Act 1973, 1982, 1985, 1988 (ESA) By Anais Teyton Function: Promotes the conservation of the listed endangered and threatened worldwide.
NATURAL RESOUCE DAMAGE ASSESSMENT AND RESTORATION Shelly Hall – Assistant Solicitor Branch of Environmental Restoration Branch of Environmental Restoration.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
Establishing the Scientific Basis for Ecosystem Management On the Upper Mississippi River Dr. Ken Lubinski, USGS Upper Midwest Environmental Sciences Center.
Health Outcomes in Escambia and Santa Rosa Counties Issue:  Higher health risks found in: Infants Infants Elderly (age >65) Elderly (age >65) Blacks Blacks.
DEEPWATER HORIZON $1B EARLY RESTORATION AGREEMENT Governor’s Advisory Commission May 11, 2010.
Fran Dunwell Hudson River Estuary Coordinator Hudson River Estuary Program/NYSDEC.
Overview of the Total Maximum Daily Load Program.
Water Director Meeting 30th November 2006, Inari / SF WFD and Hydromorphology Technical report on “Good practice in managing the ecological impacts of.
Chapter 20 Environmental Protection
Forging Partnerships on Emerging Contaminants November 2, 2005 Elizabeth Southerland Director of Assessment & Remediation Division Office of Superfund.
Use of a Net Environmental Benefit Analysis (NEBA) Approach in Demonstrating and Maximizing the Benefits of Site Cleanup Joe Nicolette Vice President EcoValuation.
Vision for Menomonee River Valley Economically, with strong companies and jobs near workers’ homes; Geographically, with renewed ties to the surrounding.
1 Introduction to Ecological Re-Use Concepts: ITRC Technical and Regulatory Guidance Document 2006 Brownfields Conference Boston, Massachusetts Charles.
Presented by: William H. Hyatt, Jr. Kirkpatrick & Lockhart Nicholson Graham LLP One Newark Center Newark, New Jersey
Proposed Plan for No Further Action
Watershed-based Plan To Restore the Hackensack Meadowlands:
THE SUPERFUND PROCESS Assessment and Listing
Essentials of the legal environment today, 5e
Niagara River Area of Concern
Watershed-based Plan To Restore the Hackensack Meadowlands:
Introduction EPA is overseeing the RI/FS for the Rolling Knolls Landfill being conducted by several companies under a 2005 administrative order on consent.
Water Quality Planning Division Monitoring & Assessment Section
Water Quality Planning Division Monitoring & Assessment Section
Chapter 45 Environmental Protection and Global Warming
Presentation transcript:

Margaret Byrne, U.S. Fish and Wildlife Service Hudson River Natural Resource Damage Assessment and Restoration Margaret Byrne, U.S. Fish and Wildlife Service

Introduction The Hudson River Natural Resource Trustees are conducting a natural resource damage assessment (NRDA) to determine the type and amount of restoration needed to compensate the public for injuries to their natural resources from GE's PCBs. This presentation provides an overview and status of the Hudson River NRDA.

Cleanup and Restoration EPA: Superfund – clean up hazardous substances to protect the environment and public health. Trustees: Natural Resource Damage Assessment – assess, and restore or replace natural resources injured by hazardous substances to provide for the public’s use and enjoyment.

Hudson River PCB Pollution

Natural Resource Trustees Hudson River Natural Resource Trustees New York State, represented by the Department of Environmental Conservation (NYSDEC) U.S. Department of the Interior (DOI), represented by the U.S. Fish and Wildlife Service (USFWS) U.S. Department of Commerce, represented by the National Oceanic and Atmospheric Administration (NOAA)

Role of the Trustees Trustees are stewards of the public’s natural resources. These agencies have resource management authority. Trustees pursue damage claims for past, present, or future injury to natural resources. Trustees resolve damage claims through settlement or litigation. Trustees implement restoration.

Trustee’s Steps Assess the injuries. Identify and scale appropriate restoration alternatives. Resolve the claim. Develop a restoration plan. Implement restoration activities. Monitor the effectiveness of restoration activities. Photo Credit Brady Dillsworth

Assessment Trustees conduct scientific studies to identify the nature and extent of the harm PCBs cause in and along the river. For each resource and service, we are: 1. determining the nature and extent of the injury; 2. quantifying the magnitude of the injury; and 3. determining if and when remedial actions will restore injured natural resources to baseline conditions.

Injury Categories Under Investigation Assessment: Injury Categories Under Investigation Violations of State or Federal standards - Fish (fish consumption advisories) - Waterfowl - Surface Water - Ground Water Biological resource injuries - Mammals, Birds, Fish Navigational Service Loss Remedy-caused injuries - (e.g., Mussels, Aquatic vegetation) Pathway injuries

Assessment: Injury Determination Reports Hudson River Fishery Resources: Fishery Closures and Consumption Restrictions (June 2001; April 2015) Hudson River Surface Water Resources (Navigation - July 2006; December 2008) Hudson River Resident Waterfowl (August 2013) Hudson River Groundwater (September 2015)

Steps in Restoration Planning Identify categories for types of projects. Develop restoration ideas. Solicit additional ideas from the public. Scale restoration. (Determine the type and amount of restoration needed to offset injuries and lost services.) Review and select preferred projects. Develop a Draft Hudson River Restoration Plan and submit for public comment Finalize and implement the Restoration Plan.

Project Selection Criteria Guidance for restoration project selection includes: Link to injury Legality Efficacy Feasibility Cost-effectiveness Ecological leverage Nexus to existing plans

Examples of Restoration Project Alternatives under Consideration Project alternatives include but are not limited to: Dam removal and fish passage Wetland restoration Floodplain restoration Floodplain protection Creation of grasslands Human use projects (such as access points for recreation) Ground water protection Restoration of freshwater mussels Restoration dredging of Upper Hudson PCB-contaminated sediments Navigational dredging

Concerns about Unremediated PCBs PCB hot spots will be only partially remediated in River Sections 2 and 3. Remaining contamination will cause ongoing injuries to natural resources and slow the economic and ecological recovery of the river. Navigational channels will remain contaminated Highly contaminated areas will remain adjacent to dredged areas post-remedy. Recontamination is likely.

Unremediated PCBs Potential Impacts on Restoration The magnitude of contamination remaining post - dredging may limit the type and amount of restoration options in the Upper Hudson. Restoration projects may need to be located further from the site of greatest contamination. Trustees would need to consider harm from creating an “attractive nuisance” in PCB-contaminated areas.

Trustee’s Next Steps Completing injury assessment Evaluating restoration alternatives and developing restoration planning documents Building relationships with stakeholders Resolving the claim Implementing restoration to accelerate economic and ecological recovery of the Hudson River 

Learn More Visit Trustee websites Join our Listserve Contact us NOAA – https://darrp.noaa.gov/hazardous-waste/hudson-river NYSDEC – www.dec.ny.gov/lands/25609.html FWS – www.fws.gov/contaminants/restorationplans/ HudsonRiver/index.html Join our Listserve Send a blank email to Hudson-nrda-join@list.woc.noaa.gov Contact us Margaret Byrne -- (413) 253-8593 -- Margaret_Byrne@fws.gov Kathryn Jahn -- (413) 427-3851 -- Kathryn_Jahn@fws.gov Tom Brosnan -- (301) 713-3038 x186 -- Tom.Brosnan@noaa.gov

Hudson River PCBs Superfund Site UHR LHR Hudson Falls/Ft Edward GE Plant Sites Former Ft Edward Dam River Section 1 River Section 2 River Section 3 Federal Dam Federal Dam ~ 150 miles The Battery/NYC EPA Remedy River Section 2 extends from the Thompson Island Dam to the Northumberland Dam (sometimes referred to as Lock 5) near Schuylerville (RM 183.4) an extent of about 5.1 river miles. River Section 3 extends from below the Northumberland Dam to the Federal Dam at Troy, an extent of about 29.5 river miles. Source: http://www.epa.gov/hudson/proposedplan.pdf