FLO-2D Model Development Rio Grande Canalization Project Reach Presentation to: New Mexico – Texas Water Commission and Paso del Norte Watershed Council.

Slides:



Advertisements
Similar presentations
Flood Risk Analysis – the USACE Approach
Advertisements

Runoff Analysis of the Watersheds “El Arroyo El Chilito” and “La Presa Bernardez” Guadalupe, Zacatecas, Mexico Nathan Lowe, Shawn Stanley and Jeffery Crump.
WinTR-20 Course February Muskingum-Cunge Flood Routing Procedure in NRCS Hydrologic Models Prepared by William Merkel USDA-NRCS National Water Quality.
Hydrologic Analysis Dr. Bedient CEVE 101 Fall 2013.
Use of a hydrodynamic model to
Importance of Land use management on the Flood Management in the Chi River Basin, Thailand Kittiwet Kuntiyawichai Bart Schultz Stefan Uhlenbrook F.X. Suryadi.
HATCH, NM, Background Information Village of Hatch Case Study.
Using HEC-1 for Subdivision Runoff Detention Pond Design Stacie Kato April 26, 2004.
CHARACTERISTICS OF RUNOFF
Introduction to Surface Water Hydrology and Watersheds Lecture 1 Philip B. Bedient Rice University November, 2000.
CE 515 Railroad Engineering
OKLAHOMA STATE UNIVERSITY Biosystems and Agricultural Engineering Department Hydrology 101 OKLAHOMA STATE UNIVERSITY Biosystems and Agricultural Engineering.
4 th International Symposium on Flood Defence, 6 th – 8 th May 2008, Toronto, Canada Efficiency of distributed flood mitigation measures at watershed scale.
Continuous Hydrologic Simulation of Johnson Creek Basin and Assuming Watershed Stationarity Rick Shimota, P.E. Hans Hadley, P.E., P.G. The Oregon Water.
Channel Repair of Montezuma Creek in Coronado National Memorial following Fire and Flood Damage Stephanie Yard, P.E. & Allen Haden, Aquatic Ecologist Natural.
Hydrologic Theory One of the principal objectives in hydrology is to transform rainfall that has fallen over a watershed area into flows to be expected.
Ch  Know what design frequency means  Know how to delineate a drainage area on a topographic map 2.
Upper Brushy Creek Flood Study – Flood mapping and management Rainfall depths were derived using USGS SIR , Atlas of Depth Duration Frequency.
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
HEC-RAS.
Engineering Hydrology (ECIV 4323)
US Army Corps of Engineers ® Engineer Research and Development Center West Bay Diversion Evaluation 1-Dimensional Modeling CWPPRA Technical Committee and.
Reading: Applied Hydrology Sections 8.1, 8.2, 8.4
El Vado Dam Hydrologic Evaluation Joseph Wright, P.E. Bureau of Reclamation Technical Services Center Flood Hydrology and Meteorology Group.
1 Flood Hazard Analysis Session 1 Dr. Heiko Apel Risk Analysis Flood Hazard Assessment.
Copyright [insert date set by system] by [CH2M HILL entity] Company Confidential Hydrologic Evaluation of the Little Thompson River Phase 2: Little Thompson.
WinTR-20 SensitivityMarch WinTR-20 Sensitivity to Input Parameters.
Introduction to HEC-HMS
Rush River Assessment Project Hydrologic Flow Study Sibley County SWCD Presentation to the Minnesota River Research Forum March 10, 2005.
Oregon Case Studies Ryan Johnson. Studies  The response of impounded sediment to a culvert replacement project on Sutter Creek, a tributary of Honey.
Urban Storm Drain Design: Pump Station Design. Purposes To lift stormwater to higher elevation when discharge of local collection system lies below regional.
Hydraulic and Hydrologic Considerations in Planning Course FLOOD RISK MANAGEMENT Chuck Shadie Mississippi Valley Division.
National Research Council Mapping Science Committee Floodplain Mapping – Sensitivity and Errors Scott K. Edelman, PE Watershed Concepts and Karen Schuckman,
March 2009WinTR-20 Course1 Muskingum-Cunge Flood Routing Procedure in NRCS Hydrologic Models Prepared by William Merkel USDA-NRCS National Water Quality.
CE 424 HYDROLOGY 1 Instructor: Dr. Saleh A. AlHassoun.
Assessment of Economic Benefits of the North Carolina Floodplain Mapping Program Hydrologic and Hydraulic Case Studies Adapted from a Presentation to NRC.
Engineering Hydrology (ECIV 4323)
Surface hydrology The primary purpose of the WEPP surface hydrology component is to provide the erosion component with the duration of rainfall excess,
Channel Routing Simulate the movement of water through a channel
Channel Routing Simulate the movement of water through a channel
WinTR-20 SensitivityFebruary WinTR-20 Sensitivity to Input Parameters.
Description of WMS Watershed Modeling System. What Model Does Integrates GIS and hydrologic models Uses digital terrain data to define watershed and sub.
Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
Floodplain Management D Nagesh Kumar, IISc Water Resources Planning and Management: M8L5 Water Resources Systems Modeling.
A Sediment Budget for Two Reaches of Alameda Creek (1900s through 2006) Paul Bigelow, Sarah Pearce, Lester McKee, and Alicia Gilbreath.
Surface Water Surface runoff - Precipitation or snowmelt which moves across the land surface ultimately channelizing into streams or rivers or discharging.
Introduction to Urban Hydrology
Impacts of Salinity on El Paso’s Surface Water Supply presented at the Annual Salinity Management and Desalination Summit December 8, 2003 Michael P. Fahy.
Hydrology and application of the RIBASIM model SYMP: Su Yönetimi Modelleme Platformu RBE River Basin Explorer: A modeling tool for river basin planning.
Rio Grande Rectification Reach FLO-2D Model Development Presentation to: New Mexico – Texas Water Commission and Paso del Norte Watershed Council Project.
FLO-2D Model Development Below Caballo Dam to Ft. Quitman Prepared by: U.S. Army Corps of Engineers Albuquerque District and Mussetter Engineering, Inc.
Sanitary Engineering Lecture 4
Sacramento: Flood Risk
Channel Routing Simulate the movement of water through a channel
Nathan Lowe, Shawn Stanley and Jeffery Crump
Engineering Hydrology (ECIV 4323)
Channel Routing Simulate the movement of water through a channel
A SURFACE WATER MODEL OF THE MIAMI RIVER
Introduction to Urban Hydrology
Hydrology.
Hydrology CIVL341.
Floods and Flood Routing
Preciptation.
Love Field Modernization Program
Hydrotechnical Design Guidelines for Stream Crossings
Engineering Hydrology (ECIV 4323)
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Hydrology CIVL341 Introduction
Engineering Hydrology (ECIV 4323)
Presentation transcript:

FLO-2D Model Development Rio Grande Canalization Project Reach Presentation to: New Mexico – Texas Water Commission and Paso del Norte Watershed Council Project Completed for: U.S. Army Corps of Engineers and International Boundary and Water Commission March 9, 2006 Jim O’Brien FLO-2D Software, Inc.

Project Purpose The results of the FLO-2D model application will be used to support the development of the URGWOM model for the Rio Grande Canalization Project (RGCP) reach. RGCP FLO-2D model will predict floodplain inundation, water surface elevation and levee inundation or overtopping associated with floodwave attenuation of return period flood events.

Project Components Hydrology Review Sediment Supply Review Field Data Collection Program FLO-2D Model Development Model Calibration and Application

Hydrologic Review Releases from Caballo Reservoir Design storm selection including point rainfall, distribution and depth-area reduction Application of the HEC-1 model including rainfall/runoff estimates, assumptions, selected parameters and results

Hydrology Review Results The combined probability of a 5,000 cfs release during the 100-yr flood is less than 1% on any given year. Used 2,350 cfs average irrigation release instead. The 100-yr, 24-hr general storm rainfall of 3.8 inches was verified with a frequency analysis of the Jornada Range and Hillsboro rain gage records. Parameter adjustments to the Corps 1996 RGCP HEC-1 rainfall runoff simulation resulted in higher tributary peak discharge that occurs further upstream.

Flood Hydrology Two Possible Flood Scenarios cfs release Corps Study tributary flood inflows 2.Selected: 2,350 cfs release + revised 100-year 24-hr hydrology for tributary flood inflows ~ typical irrigation release

Return Period Flood Modeling The various return period tributary flood inflows using the revised hydrology were simulated with the typical irrigation release of 2,350 cfs. Return period floods were: 2-yr, 5-yr, 10-yr, 25-yr, 50-yr, 100-yr

Sediment Review Objective Reviewed Corps’1996 Rio Grande Canalization Improvement Project, Volume 3, “Sedimentation Analysis from the Rio Grande Tributary Basins” and accompanying appendices

Only sediment supply to the RGCP reach is the steep arroyo sediment Loading Jim O’Brien Tetra Tech, Inc.

Observations Upstream reservoirs and NRCS arroyo tributary retention dams have created a long term, historical sediment deficit in the river Channel incision in response to dredging Armoring of some reaches with local supply of coarse sediment from arroyos

Local Tributary Coarse Sediment Supply

Relatively high velocities over cobble/gravel bed

Two sources of coarse sediment: hillslope and tributary

Sediment Review Conclusions Evidence that there is a sediment deficit in the system Current tributary sediment supply may not sustain the existing channel morphology in response to future channel maintenance

Sediment Review Conclusions Corps study was an excellent approach to calculate the total RGCP sediment supply Corps study overestimated sediment yield for at least 7 of 20 study basins If sediment yield is overpredicted for the 20 study basins, the regressed relationship will overestimate the sediment yield for all basins

Sediment Review Conclusions (cont.) Most of the overestimated total load can be attributed to Colby adjustment factor based on wash load concentration and bed material size Selection of parameters, application of sediment transport equations and supercritical flow assumptions = overpredicted annual sediment yield Calibrate sediment total load computations to NRCS reservoir survey annual load

Sediment Yield from NRCS Reservoir Surveys WatershedNRCS Name Drainage Area Resurvey (yrs) Average Annual Sediment Yield Revised 2005 Average Annual Sediment Yield UnderwoodCaballo # WassonCaballo # South SalemCaballo # ApacheABM # Pena BlancaABM # MossmanABM # Bishop's CapABM # FillmoreFillmore Arroyo # SalopekFillmore Arroyo # Lower FillmoreFillmore Arroyo # Tortugas # Tortugas # Dona AnaDoña Ana # North Fork ArroyoDoña Ana # RodneyHatch Valley # Hatch Valley #5aAverage Hatch Valley #2Std. Dev Hatch Valley #30.51 Hatch Valley #60.19 Average Std. Dev

Sediment Yield Equation The equation for total sediment load Q T was of the form: Q T = A 1 + A 2 A b + A 3 Log (A b) where: A 1, A 2, and A 3 are regression coefficients and A b is the basin area.

Sediment Load Adjustment Sediment yield per unit area was plotted as f(basin area). A decreasing power function could be applied to adjust the sediment yield equation as function of the basin area. The derived adjustment equation was: F a = 5.69 * A b ( ) where: F a is the adjustment factor Table 4. Page 8 Report

Recommendation Use the Dona County DTM to estimate the sediment yield in all the detention basins…might have to create an as-built surface to compare with.

Field Data Collection Program June-July 2004 RGCP Channel Cross Section Survey Surveyed 145 Cross Sections Monumented and verified with control Surveyed levee to levee in most cases Water surfaces for calibrations at moderate flows (< 2,000 cfs less than bankfull)

Cross Section Locations with 250 ft Grid System

CROSS SECTIONS DTM VS GROUND SURVEY Reference elevation for the bridge rating curve was different in the data base

FLO-2D Model Development DTM Points/Images Establish FLO-2D Finitie Difference Grid System Channel Components Model Details  Infiltration and Evaporation  Levees and Hydraulic Structures Model Calibration Flood Results

Data Base DTM Points Images Channel Cross Section Surveys Calibration Data – Inflow and Outflow Discharge All together – this comprises one of the best major river data bases ever assembled. The only difficulty was that there is so damn much of it.

DTM Points Dona Ana County DTM The DTM data base was selectively edited along the floodplain Compiled individual DTM images into 12 files Each of the 12 files was imported into the GDS and a grid system was overlaid 12 grid systems were generated using both high and low filters

FLO-2D Grid System

Basic ‘Riada’ (Big Flood) Results Area of Inundation Flood hydrographs every 250 ft of channel Flood wave attenuation Levee deficiency and overtopping

Area of Inundation Maps Maps in Report

Maximum Areas of Inundation Table 4. Predicted Areas of Inundation 5,000 cfs Release – Original Flood Hydrology (acres) 2,350 cfs Release – Revised Flood Hydrology (acres) Inflow Flood Volume (af-ft) 163,937100,207 Maximum Wetted Floodplain Maximum Wetted Channel Surface Area Total Maximum Inundated Area

2004 Water Surface Elevation Calibration Results Difference between measured and predicted water surface elevation ranged from to ft Average difference is 0.03 ft

Flood Hydrographs 2004 Calibration Results Haydon Gage

2004 Calibration Results Leasburg Gage

2004 Calibration Results Mesilla Gage

2004 Calibration Results Anthony Gage

Floodwave Attenuation

Levee Freeboard Deficiency

Diversion Dam and Wasteway Operation During Flooding SKIP THIS…unless people have questions

Diversion Dam Operation During Flooding EBID – Percha and Leasburg diversion dams are weirs - no significant change. Open up the by-pass gates and close diversions (8-hour lead time). Want to avoid having the irrigation system inundated. Mesilla diversion dam has gates (12-18 hr lead time) to open the gates. Shut down the canal diversion. Biggest concern is flooding into the irrigation facilities at the diversion.

Diversion Dam Operation During Flooding American Diversion Dam – IBWC Wait until flood arrives. 6 gates are automatically control, 7 gates are manually controlled. Open all gates. Basically have a capacity of 12,000 cfs. Shut canal diversions.

Diversion Dam Operation During Flooding All diversion dams are assumed to be broad crested weirs and open during flooding. The rating curve for passing the flood downstream was estimated using the broadcrested weir equation and a 2.85 coefficient for some loss of efficiency with gate structures.

Wasteway Operation During Flooding Wasteways and drains are affected by backwater during flooding and can cause local flooding. All wasteways have gates (box culvert slide gates) and an effort is made to close all gates during flooding. Water in drains can flood because water continues to flow during flooding. Some watersheds drain into wasteways and deliver flood inflows from tributaries.

Wasteway Operation During Flooding Assumed that all wasteways without flood inflows have closed gates. Levees would have to be overtopped to initiate flooding at wasteway locations. Additional detail can added to the model as local flooding is investigated. There is no operational policy other than to close the gates.

Remaining Issue: Additional roadway or other embankment details Corps agreed that this additional detail is beyond the scope of work and that more detail can be added based on local flood studies and levee improvements.

Potential future benefits Flood risk and hazard assessment Flood mitigation – raise levees Local flood details – levee elevations, wasteways, urban flooding Revise flood hydrology River operations River maintenance response River restoration response

The End March 9, 2006