Steve Leitman 2011 Alabama Water Resources Conference.

Slides:



Advertisements
Similar presentations
Ecosystem Flows Hydrology and Connectivity Joe Trungale October 2, 2006.
Advertisements

US Army Corps of Engineers BUILDING STRONG ® State of Tennessee Regional Water Supply Planning Pilot Studies Benjamin L. Rohrbach, P.E. Chief, Hydrology.
John H. Kerr Dam and Reservoir John H. Kerr Dam and Reservoir U.S. Army Corps of Engineers Wilmington District.
HATCH, NM, Background Information Village of Hatch Case Study.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
Clean Water Act Section 404 Basics Clean Water Act Section 404  Regulates discharges of dredged or fill material into waters of the U.S., including.
US Army Corps of Engineers BUILDING STRONG ® USACE – ACF Operations Bailey Crane Water Management USACE, Mobile District.
Fluvial Geomorphology Lab 7. Concepts Basic concepts and definitions Types of work performed by streams Alluvium Base level Watersheds/Drainage Basins.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N What.
Identify Problems, Planning Objectives and Constraints
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Presentation to the Workshop Climate Change and Great Lakes Water Levels March 30, 2001 Chicago, Illinois Gerald E. Galloway, Jr., P.E., Ph.D. International.
US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers US Geological Survey Lisa T Morales US Army Corps of Engineers Ward Staubitz US.
One Corps Serving The Army and the Nation Tulsa District The Tulsa District Corps of Engineers and Its Cooperative Partners.
Table of Contents 1. Description of the conservation issue 2. Background and history 3. Science and research 4. Conflicts and debate 5. Relevant legislation.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
Yellowtail Dam & Bighorn Lake Operating Criteria Review Billings, MT September, 2010 RECLAMATION Managing Water in the West.
Last year Lawyers, politicians and judges Stakeholders were getting organized.
Youghiogheny River Lake Storage ReAllocation for Downstream Water Supply by Werner C. Loehlein, P.E.
Water Supply Reallocation Workshop Determining Yield and Space Requirement.
US Army Corps of Engineers BUILDING STRONG ® Savannah River Basin Drought Workshop October 24-25, 2012.
SUSTAINABLE WATER MANAGEMENT PROJECT OVERVIEW Mitch Reid Brad Moore August 2013.
Corps Water Management System Hydrologic Engineering Center USACE Hydrologic Engineering Center Davis, CA Davis, CA.
Introduction to Performance Measures GES 400H UMBC Fall 2010 Megan Wiley Rivera.
“Getting the Funding Right” Kim Koleos Juris Doctor, University of Florida.
Setback Levees: Hydraulic, Ecologic and Economic Benefits Tony Melone, PhD, PE, CFM 2011 ASFPM National Conference.
IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.
CORPS OF ENGINEERS NWS Meeting Tallahassee, FL, July 19, 2006.
NOAA’s NWS and the USGS: Partnering to Meet America’s Water Information Needs Dr. Thomas Graziano Chief, Hydrologic Services Division NOAA National Weather.
Western Lake Erie Basin Partnership Presented by: Name, Title Your Organization DATE YOU PRESENTED The Meeting you presented at.
Advisory Committee on Water Information Streamgaging Task Force Charge: Determine the streamflow information needs of the Nation, identify the optimal.
AN EVALUATION OF THE COMPATIBILITY BETWEEN NAVIGATION AND ENVIRONMENTAL RELEASES FROM THE ACF RESERVOIR SYSTEM.
US Army Corps of Engineers Chicago District FY04tpr\skbcongressional Civil Works Program Missions Missions Process Process Select Authorities Select Authorities.
Urban Storm Water Runoff and Inland Lakes: A Tale of Two Cities Jarron D. Hewitt and Martin T. Auer Department of Civil and Environmental Engineering,
Martin Rule Curve Study Ashley McVicar, APC Maurice James, Water Resources Consulting LLC.
Dr. Richard Palmer Professor and Head Department of Civil and Environmental Engineering University of Massachusetts Amherst.
Multiple Purpose Dam & Reservoir
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
US Army Corps of Engineers BUILDING STRONG ® Reservoir Simulation Software “Westfield Sub-basin” Presenter – John Hickey, HEC August 2010.
Lake Sydney Lanier Northeast Georgia Chris McCurdy & Andrea D. Roche.
US Army Corps of Engineers BUILDING STRONG ® Boise River Feasibility Study Ellen Berggren, PMP Outreach Coordinator/ Project Manager Idaho Governor’s Roadless.
USACE Managing a Drought  Overview  Timeline  Depletion Scenario Current Status– 17 Oct 07.
1 An Approach to Levee Assessment and Contingency Planning Presentation to the National Waterways Conference 7 September 2006 Portland, Oregon By Rob Vining.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
Martin Rule Curve Study Ashley McVicar, APC Maurice James, Water Resources Consulting LLC.
Apalachicola Riverkeeper
Integrating Water Supply Management And Ecological Flow Requirements Mark P. Smith and Colin Apse The Nature Conservancy Richard M. Vogel and Stacey Archfield.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
Alan F. Hamlet Jeffrey Payne Dennis P. Lettenmaier Richard Palmer JISAO Climate Impacts Group and the Department of Civil Engineering University of Washington.
(i) System Components, Planning and Management Introduction and Basic Components D. Nagesh Kumar, IISc Water Resources Systems Planning and Management:
©American Management Association. All rights reserved | Updated
ACF STAKEHOLDERS: OVERVIEW Working together to share a common resource.
MEKONG RIVER COMMISSION RIVER BASIN PLANNING - MODULE 1 INTRODUCTION Can Tho, Vietnam January 2003 Refining Objectives and Developing Scenarios.
High Altitude View of ACF Regional Water Plans.
Yellowtail Dam & Bighorn Lake Reservoir Operating Criteria Proposed Modifications Lovell, Wyoming July 29, 2008 RECLAMATION Managing Water in the West.
MRC-MDBC STRATEGIC LIAISON PROGRAM BASIN DEVELOPMENT PLANNING TRAINING MODULE 3 SCENARIO-BASED PLANNING for the MEKONG BASIN Napakuang, Lao PDR 8-11 December.
URBAN STREAM REHABILITATION
Environmental Flow Instream Flow “Environmental flow” is the term for the amount of water needed in a watercourse to maintain healthy, natural ecosystems.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
The Jordan Cove Pacific Connector Gas Pipeline and Terminal.
Lake Erie Dredge Material: Finding a Solution for Ohio Ohio Brownfield Conference 2016 April 6-7, 2016.
C ALOOSAHATCHEE & E VERGLADES R ESTORATION Jennifer Hecker, Director of Natural Resource Policy.
“THERE IS NOT ENOUGH WATER IN THE SYSTEM TO DO EVERYTHING WE WANT” CONFLICTS.
Using RMMS to Track & Report BMP Implementation
Water Supply Context: Alabama, Florida and Georgia
Introduction to Performance Measures
T H R E S A G M O D L The skilled helper Gerard Egan (1975)
Hazards Planning and Risk Management Flood Frequency Analysis
Department of Environmental Quality Division of Water Resources
Managing Water Levels on the Upper Miss
Presentation transcript:

Steve Leitman 2011 Alabama Water Resources Conference

Funded under a USDA Rural Development Grant. Steve Leitman, Apalachicola Riverkeeper’s Charles Stover and Stacey Graham, Alabama Power Information in this presentation represents only my views.

For the past several decades, navigation and environment interests in the Apalachicola- Chattahoochee-Flint (ACF) basin have had what can only be called a contentious relationship.

One of the major causes of this conflict has been the expectations of navigation interests from the project: a reliable, year-round channel at the design flow of 9,300 cfs.

When the channel was first developed that it was believed that : 1) the 95% exceeded flow was at least 9,300 cfs 2) that a 9-foot channel could be provide at this flow after the channel was maintained.

The 9,300 cfs design flow has not been available 95% of the time. Observed flow available 95% of the time from 1922 to 2011 for the Apalachicola River at Chattahoochee was 6,580 cfs. Frequency of the availability of the 9,300 cfs flow was about 85%.

In addition, the flow needed to provide a 9-foot channel has exceeded the 9,300 cfs design flow. Estimates by the Corps of Engineers of how much water was needed to provide the 9-foot channel when the channel was being maintained ranged from 13,000 cfs to 16,000 cfs since the 1970’s.

In summation, there was no way that the ACF navigation channel could have been available 95% of the time and navigation interests were left with unreal expectations from the project.

Ultimately, Florida denied water quality certification to maintain the Apalachicola River’s navigation project. Corps stopped making releases to support the navigation channel. Situation best described as a lose-lose solution.

At the base of our current project is a mutually held belief that the problem has been with how the navigation project was approached, not that navigation and the environment are mutually incompatible.

In spite of this long history of confrontation, navigation interests and environmental interests do have a common interest in the Apalachicola River: They both want more water coming down the river.

In our project we are exploring how much overlap there is between the water that navigation interests want and the water that environmental interests want. Can the lose-lose situation be changed to a win-win situation?

To accomplish this task there are several critical questions which need to be addressed: 1) What are the interests of navigation and environmental stakeholders in the ACF basin?

Navigation interests want to have the 9-foot channel available as many consecutive days each year as possible without either causing significant environmental damage or impacts to other users of the federal storage reservoirs.

Environmental interests in turn simply want to see the aquatic ecosystems sustained or enhanced in the future.

2) What are realistic expectations from the ACF system in terms of reliability of the navigation project?

AVAILABILITY OF THE NINE-FOOT NAVIGATION AT VARYING LEVELS OF FLOW NEEDED TO PROVIDE THE NINE-FOOT CHANNEL

3. Where is the common ground between environmental and navigation interests in the ACF basin?

Dredging can increase the availability of the navigation. HEC-RAS analyses show that without dredging the 9-foot channel can be provided at 21,000 cfs, whereas with 250,000 cubic yards of dredging it would take 14,000 cfs to provide a 9- foot channel.

There are multiple, perhaps too many, ways to represent the relationship between flow and the aquatic ecosystem. One way is to evaluate the extent of floodplain inundation.

PERCENT OF TIME 15,000 cfs EXCEEDED UNDER REVISED RELEASE RULES

3) What are the possible areas of conflict between navigation and environmental interests?

One issue which needs to be balanced is the fact that environmental interests want as little dredging as possible (some say none) but an increase in the frequency of mid-range flows (15,000 to 21,000 cfs) while navigation interests want the channel available as much as possible and would prefer the 14,000 cfs option with 250,000 cubic yards of dredging.

Is there a common ground solution that allows for reduced dredging, reduced impact on reservoirs, yet increased inundation of the floodplain?

4) What are the limits of the system to support navigation and environmental interest’s mutual flow needs in the Apalachicola River?

MEDIAN ELEVATIONS AT LAKE LANIER

90% EXCEEDED ELEVATIONS AT LAKE LANIER

We are at the stage of writing up our material and will have a report available this fall.