Hall A G2P Magnet D. G. Crabb U. Of Virginia. UVA/SLAC/JLAB Target.

Slides:



Advertisements
Similar presentations
Ferrites and Common-Mode Chokes. Magnetic field tend to concentrate in high- permeability ( ) materials. Some of the flux leaks out and completes the.
Advertisements

Polarized Target “Issues” Magnet Microwaves Target Ammonia.
Trevor Muddimer WorkplaceSense.co.uk. The problem… Generally, around 10% of a companies electricity is used to run the air compressor(s). Leakage ranges.
Magnetism and Magnetic Levitation Trains Does the US have them ? How do they work ? What do they have to offer ? 1. Japan and Germany have demo versions.
Sources of Magnetic Field
K. Long, 16 June, 2015 MICE Muon Beam. Beam line and decay solenoid: Pressure reducing valves: Fitted to Q7—9; To be fitted to Q4—6 Upstream MLI: Plan.
Electricity How is it made?.
B before after ConcepTest #81 A large magnetic field points up, as shown. Initially, a proton has the z- component of its spin magnetic moment pointing.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
Department of Materials Science and Engineering The development of persistent joints for MgB 2 -based conductors D. Doll 2, J. Yue 2, C.J. Thong 2, M.A.
Solid Polarized Target Opportunities at JLab Possibilities for Future Experiments.
POLARIZED TARGET UPDATE D. G. Crabb UVA. Refrigerator UVA fridge and JLab Fridge clones Both leaked badly (from the same place) after ~20 years of operation.
OIL & GAS FIELD SUPPLIES DIVISION Oil & Gas Field Supplies Division deals in supply of Gate Valves, Ball Valves, Butterfly Valves, Control Valves, Check.
 $10.65 x 40 = $  $ x 50 = $21,
Wed. Feb. 25 – Physics Lecture #32 Faraday’s Law II 1. Lenz’s Law (fight the flux change) 2. Faraday’s Law (changing magnetic fields are the source of.
HD target.
Drugs in the Body (1) Recurrence Relations A patient is given an initial dose of 50mg of a drug. Each hour the patient is given a 20mg tablet of the.
Elena Long Joint Hall A/C Collaboration Meeting Jefferson Lab June 6 th, /06/2014Joint Hall A/C Collaboration MeetingElena Long.
Pseudo CCV System System Diagram Bracket Diagram 50hr oil and carryover add procedure Observations and Background.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Section 6.1 Composite Functions.
Section 5.1 Composite Functions. Suppose that an oil tanker is leaking oil and we want to be able to determine the area o the circular oil patch around.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Speaker: A device that converts electrical signals into sound
Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012.
Electricity and Magnetism
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Section 6.1 Composite Functions. Form a Composite Function.
Momentum Corrections for E5 Data Set R. Burrell, G.P. Gilfoyle University of Richmond, Physics Department CEBAF The Continuous Electron Beam Accelerating.
Electromagnetism. Hans Christian Oersted Discovered the relationship between electricity and magnetism in Held a compass near a wire carrying an.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
23 September 2010 Casablanca, Morocco CALICE Collaboration Meeting Hassan University HASSAN II 1 Towards Ecal Assembly Julien Bonis
Parts of the Clock Click on the minute hand. Click on the clock’s face.
Magnetism By: Manisha Shrestha. What is a magnet? A magnet is an object that attracts certain materials, usually objects that are made of iron or steel.
Beamline Update Adam Dobbs, MICE CM38 Feb Contents Recent and Upcoming Activities Target Conventional magnets Decay Solenoid Proton Absorber Summary.
2015 Operations Stay Treat CHL2 4K Cold Box Modifications SC1 2K Cold Box CC4 Failure Helium and LN2 Losses Contamination Operations Stay Treat.
Ids120h_side. ids120h_top ids120h_iso ids120h_end.
SANE Magnet Review ● Repaired polarized target magnet was successfully energized and put in persistent mode on 12/18/08 after the review, following the.
                                                                  Electro Magnets.
Cryogen Free Desktop Vibrating Sample Magnetometer (VSM) to 5 Tesla
Comparison of Magnetostatics and Electrostatics
AEGIS Magnet System.
Polarized Target Activity at the University of Virginia
ELENA electron cooler and SEM grids status
Three Minute Timer Two Minute Timer One Minute Timer
THE SKINNER COMPANY Product Review
Section 16-3 Electricity from Magnetism Notes
SoLID Magnet - Engineering and Cost
The Large Hadron Collider
Section 5.1 Composite Functions
HRS at small angles for e+/ e- pair for APEX
Copyright 2008 Coast Guard Auxiliary Association, Inc.
OPERATING STATUS OF BES SUPERCONDUCTING MAGNET
Teleconference ACS – FREIA 20th February 2018
The four rules of number
Problem 1 MATERIAL COST: Your material cost is $10 and you have 1 yd2. Your item is 3in x 4in when flat. Calculate the following costs: Material cost.
How a Speaker Works.
CLEO II Magnet in Hall A for SoLID
Name: _________________________
Ch Minute Check 1.
Question 20  Outside classroom hours, how long do you usually study for each session of this course? (the study time includes preparing for each session,

Charging by Magnetism Since you can create a magnetic field by running electricity through a wire, can you create electricity using a magnetic field?
Two long parallel conductors are separated by 1. 0 m
Transverse Solid Targets for 12 GeV

Section 6.1 Composite Functions
2 Hours Minutes Seconds Insert Text Here.
Chapter 28 Magnetic Fields
2 Hours Minutes Seconds Insert Text Here.
Presentation transcript:

Hall A G2P Magnet D. G. Crabb U. Of Virginia

UVA/SLAC/JLAB Target

Test Results Magnet Ramp Test Ramped to 5.1 T and held in persistent mode for 1.75 hours. Ramp Rates Test 0 – 65 A at 1A /minute A (>5.1 T ) at 0.5 A/minute Operation 0 – 60 A at 1.2 A/minute A at 0.6A/minute 72 – A (5.1 T) at 0.3A/min Usually operate at T

To Do Make, fit and weld new cones Weld on doughnut Leak check and ship back to Jlab Note: Repaired superconducting joints will not be changed. (not enough wire) Field decay: /hour