UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.

Slides:



Advertisements
Similar presentations
The Front End Test Stand Collaboration ELECTROMAGNETIC DESIGN OF A RFQ FOR THE FRONT END TEST STAND AT RAL A. Kurup, A. Letchford The RAL front end test.
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
Pepperpot Emittance Measurements of the FETS Ion Source
Vacuum Vessel Production Readiness Review
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
E. Beebe LEBT & Ion Injection EBIS Project Technical Review 1/27/2005 LEBT and External Ion Injection Ed Beebe Preinjector Group Collider-Accelerator Department.
F.E.T.S. Mechanical Engineering Update by P. Savage 13 th August 2008.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
International Workshop on Linear Colliders 2010 Design and fabrication update on PSI/Trieste X-band phase- space rotator structure Dmitry Gudkov 21-OCT-2010.
Electrostatic Septum For AGS C. Pai Brookhaven National Laboratory Collider-Accelerator Department
FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 1 The mechanical engineering design of the Mk II emittance measurement.
RFQ Fabrication Plan, Schedule and QC PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley.
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
FETS meeting Beam Profile Measurement Tank By P. Savage 13th June 2007.
F.E.T.S. Mechanical Engineering Update By P. Savage 7th September 2007.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
Simulations and Diagnostics for the Front End Test Stand Simon Jolly Imperial College 18 th April 2007.
FETS Pepperpot Simon Jolly 10 th February The Pepperpot Beam segmented by intercepting screen with regular array of holes. Beamlets drift short.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
PASI OsC meeting 12th July 2012
Gen Magnet Design JLAB MENG Contributors: Supervisor: Butch Dillon-Townes Magnet Engineer: Robin Wines Mechanical Designer: Ron Lassiter Mechanical Engineer:
Developments of the FETS Ion Source Scott Lawrie.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Ch. Vuitton – BE/BI Presented by R. Veness – BE/BI 18th October
RFQ – Design, Components and Fabrication 1 We aim to design and manufacture a Radio Frequency Quadrupole (RFQ).
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
FETS-HINS Videoconference 23rd Feb 2007 FETS Mechanical Design Issues by J. Pozimski On behalf of P. Savage.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
FETS Ion Source Diagnostics: The Pepperpot
ESS Front End diagnostic
Understanding Extraction And Beam Transport In The ISIS H - Ion Source D. C. Faircloth, A.P Letchford, C. Gabor, S. Lawrie M. O. Whitehead and T. Wood.
Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
CERN – Zanon discussions
Laser-based Beam Diagnostics for the RAL Front End Test Stand
F.E.T.S. Mechanical Engineering Update
Four OTR Tasks.
Pepperpot Emittance Measurements of the FETS Ion Source
Physics design on Injector-1 RFQ
Status of the Front End Test Stand April 2007.
Design of Distribution Feedbox at LHC P7
Optimisation of the FETS RFQ
XFEL Collimation and Beam Switchyard Vacuum Issues
Pepperpot MkII assembly
One quarter of RFQ vessel + vacuum pumps and supports
LARP Phase II Secondary Collimator RC-1
Cryomodule Assembly Plan
ISRC and LEBT Vacuum System Design
Mechanical Engineering progress for the Front End Test Stand
Front End Test Stand (F.E.T.S.) Engineering Progress Report
Progress and plans, Mechanics system of CEPC
Presentation transcript:

UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009

Slide 2 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics 1.Laser Based Beam Profile Measurement Tank 2.L.E.B.T. assembly 3.R.F.Q. Concept developments 4.Pepperpot Emittance Measurement System

Slide 3 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics 1) First Tank Laser Based Beam Profile Measurement

Slide 4 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics Position 1 Position 2 Position 3 Laser Ion Beam BEAM PROFILE MEASUREMENT SYSTEM

Slide 5 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics BEAM PROFILE MEASUREMENT SYSTEM Vacuum Linear Stage Vacuum Rotary Stage Mirror to deflect laser

Slide 6 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics 2 linear drives, each with an attached rotary drive mounted to a back plate in the vertical position. BEAM PROFILE MEASUREMENT SYSTEM CONCEPT

Slide 7 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics Now the horizontal linear / rotary drive pairs have been added to the motor chassis BEAM PROFILE MEASUREMENT SYSTEM CONCEPT

Slide 8 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics A tunnel has been placed between the horizontal drives, this volume will be pumped separately from the main vessel and will contain diagnostics. BEAM PROFILE MEASUREMENT SYSTEM CONCEPT

Slide 9 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics The detector has been added to the differentially pumped tunnel. BEAM PROFILE MEASUREMENT SYSTEM CONCEPT

Slide 10 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics... And the tunnel has been closed and extended with sprung ends to mate with the internal faces of the containing vessel. BEAM PROFILE MEASUREMENT SYSTEM CONCEPT

Slide 11 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics BEAM PROFILE MEASUREMENT SYSTEM Door Chassis Motor Chassis CONCEPT

Slide 12 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics Faraday cup is isolated from ground. Thin fabricated copper jacket is at 2kV to accelerate the electrons. 100 Amp turns onto soft iron yoke. Soft iron (permeability = 600) dipole is at ground potential. BEAM PROFILE MEASUREMENT SYSTEM

Slide 13 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics Motor chassis Door chassis Detector Vacuum vessel BEAM PROFILE MEASUREMENT SYSTEM 200mm Laser in Laser out

Slide 14 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics BEAM PROFILE MEASUREMENT SYSTEM Laser in Laser out Beam Vacuum Pumps 3 x 800 l/s Faraday cup assembly / beam stop Sub-D feed-through panel for linear and rotary motors BNC feed-through flange for detector

Slide 15 of 34 2) L.E.B.T. Low Energy beam Transport Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics

Slide 16 of 34 LOW ENERGY BEAM TRANSPORT Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics Solenoid

Slide 17 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics Solenoids Beam direction First tank Down stream wall LOW ENERGY BEAM TRANSPORT L.E.B.T. support frame Solenoid / drift vessel support bridges x4

Slide 18 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics Drift vessel Beam pipe sections Flexible bellows Support and alignment structures x 4 Drift lengths: d1 = 25cm d2 = 13.5cm d3 = 35cm d4 = 17cm LOW ENERGY BEAM TRANSPORT

Slide 19 of 34 TITLE Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics L.E.B.T. FARADAY CUP / BEAM STOP Faraday cup / beam stop assembly Pneumatic linear feed- through mechanism

Slide 20 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics An assembly of front plate (at ground) (1), secondary electron suppression ring (2) and faraday cup (3) all mounted to a cooled stainless steel welded assembly(4). The complete assembly can move downwards out of the beam path Toroid Toroid casing Mu metal shield Beam pipe seal Electrical feed- through x 6

Slide 21 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics What is next for the LEBT development? a)Install L.E.B.T. beam pipe sections and drift vessel, attach pump and conduct vacuum test. b)Finalise design for L.E.B.T. drift vessel toroid and cooled faraday cup/beam stop assembly.

Slide 22 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics 3) R.F.Q. Radio Frequency Quadrupole

Slide 23 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics 324 MHz Four Vane R.F.Q. To accelerate H - beam from 65keV to 3Mev An R.F.Q. consists of: Copper structure Vacuum tight Vane tip modulations Cooling channels Tuners RF coupling Vacuum ports Support / alignment structure

Slide 24 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics PLUG TUNER Currently working on the design of the plug tuners. Each 1m RFQ section may have perhaps 20 static plug tuners and 1 dynamic plug tuner.

Slide 25 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics PLUG TUNER Cooling pipes ‘O’ ring groove Copper plug Stainless steel insert Braze interfaces

Slide 26 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics DYNAMIC PLUG TUNER ASSEMBLY The plug tuner is mounted to a linear feed-through mechanism that maintains a vacuum seal by using an edge welded bellows. The model shown here has 50mm of travel and is driven by a stepper motor. Stepper motor Bellows

Slide 27 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics PLUG TUNERS ATTACHED TO ONE RFQ SECTION So already the basic RFQ structure becomes cluttered and this is before including provision for vacuum, RF and support / alignment.

Slide 28 of 34 Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics What is next for the RFQ development? a)Finalise static and dynamic tuner design for the RFQ. Manufacture prototype plug assembly and send for vacuum brazing to test joint design. b)Design in remaining RFQ features including the vacuum ports, RF coupling section and support/alignment framework. c)Choose RFQ assembly technique and make test assemblies to check joint quality.

Slide 29 of 34 4) Pepperpot A device for measuring beam emittance Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics

Slide 30 of 34 Close up of the assembled grid head showing the quartz plate. PEPPERPOT Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics

Fast CCD camera H- beam Exploded view of grid head PEPPERPOT Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics

Slide 32 of 34 What is next for the Pepperpot system? Mount the system inside a vacuum vessel that can be positioned at any longitudinal position on the FETS. In addition to pepperpot measurement the vacuum vessel will allow for slit-slit measurements. Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics

Slide 33 of 34 Goal for this year To have a working H - beam that is transported through the first laser based diagnostic vessel, through the LEBT and then through a range of diagnostics including a toroid, a slit-slit scanner or a pepperpot head before finally hitting the beam stop. To have a complete design for the RFQ and associated peripherals. Ion Source Chopper L.E.B.T. R.F.Q. Diagnostics