MRB on SLAC NCR 226 Excess of Disconnected MCM Channels R.P. Johnson November 9, 2004.

Slides:



Advertisements
Similar presentations
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Advertisements

Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
ADT490 TroubleShooting Locating Grounds A. 2 Introduction ‣ Fire Alarm Panels cannot tolerate grounds ‣ A ground on any fire alarm circuit is detected.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
November 17, 2004Tracker1 Tracker MRB Wire Bond Encapsulation from MCM to SSD R.P. Johnson U.C. Santa Cruz.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
October 15, 2004GLAST Project Results of 1 st Run P.A. Test Fixture LATLAT 1 RESULTS OF 1 st RUN PITCH ADAPTER TEST FIXTURE Peter Amnuaypayoat
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
MRB on SLAC NCR 226 MCM Encapsulation Delamination R.P. Johnson January 3, 2005.
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
Tracker Subsystem1 GLAST LAT Project FM-B PSR, 10 Feb, 2005 GLAST LAT Tracker Tower-B Pre-Ship Review Luca Latronico INFN-Pisa
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
Embedded Programming and Robotics Lesson 1 Basic Electricity and Electronics Transistor Basics Lesson 1 -- Basic Electricity1.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, BNick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
Service Bulletin 161 SUBJECT: Upgrade to current production level UNITS:D27105 DATE CODE RANGE: All units up to date code to be checked ISSUED.
Purpose Power lines Equipment Assured Grounding GFCI Conclusion.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
VOLTAGE AND READING A VOLTMETER. VOLTAGE AND READING A VOLTMETER VOLTAGE: (VOLTS) = V: A MEASURE OF THE FORCE OR PRESSURE THAT PUSHES ELECTRONS THROUGH.
TS 1.1 Basic Digital Troubleshooting 1 ©Paul Godin Updated August 2013 gmail.com.
E V I R A R Electrical Terms Basic Terms Voltage It is measured in volts and is symbolized with a V for volt or an E for electromotive force. Amperage.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 8 NCRs were generated during TMCM preproduction NCR #00029, CLOSED.
Editing RT QC flag in delayed mode ? Virginie Thierry DMQC 4 Toulouse, 28 septembre 2009.
1 CPC2-CPR2 Assemblies Testing Status Tim Woolliscroft.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Parts of An Electric Circuit Recall: a circuit is a closed path Electric circuit: closed path that flowing charge follows Constructing an electric circuit:
GLAST LAT ProjectMonthly Review, November 3, 2004 Tracker SubsystemP. S. Drell 1 GLAST Large Area Telescope: Tracker Subsystem WBS Persis S. Drell.
ADT490 TroubleShooting Locating Opens. 2 Power Supply Grounding Power Supply has circuit -> allows positive & negative outputs to float relative to ground.
Bakelite surface vs Gap production Evaluation of First samples sent back from Korea Tests and QC of panels presently in GT Evaluation of second set of.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
Tracker SSD Ladder Preproduction Review Actions and Changes Since Last Week September 16, 2002 Alessandro Brez Robert Johnson.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
Cable MRB July 13, 2005 R.P. Johnson. July 13, 2005R.P. Johnson2 Cable Status Needed in Italy to support Tower 8,9 Environmental Testing July 19.
Gamma-ray Large Area Space Telescope Tower 1 TVAC tests Bad ladders issues.
Conformal Coat Quality issues Update of November 3, 2004.
Charlie Young, SLACPitch Adapter Review 1/20/051 Trace Cracking Problem Pitch Adapter (PA).  2-mil Kapton.  ½ oz copper.  Nominal 150  -inch nickel,
Year 8 Fuse Tester Design & Technology PCB Information Fixed value resistors 470R = Yellow, Purple, Brown This component is soldered directly onto the.
Significance Tests: The Basics Textbook Section 9.1.
GLAST LAT ProjectMRB 09/14/2005 L. Latronico1 Tower 14 – Layer Y0 malfunction MRB Meeting – 14 September 2005.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
Tracker Timing Margin MRB R.P. Johnson U.C. Santa Cruz October 15, 2004.
Starting System Circuit Operation and Testing
Procedure for MCM rework on tray MID 070
OBJECTIVES Explain the ABS diagnostic procedure and the brake warning lamp operation. Explain how to retrieve ABS diagnostic trouble codes. Explain how.
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
GLAST Large Area Telescope:
Mini-Tower test results
Origami, PA 2015 Sep. 10 Koji Hara (KEK).
Investigation on tray MID 063 Back
Preproduction Status & Results
FNAL Production Experience
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Module Failures on Rods
22 Chapter Basic Electrical Tests. 22 Chapter Basic Electrical Tests.
Presentation transcript:

MRB on SLAC NCR 226 Excess of Disconnected MCM Channels R.P. Johnson November 9, 2004

MRB, SLAC NCR Description of Non-Conformance MCM part number LAT-DS-00898, SN was found to have 151 channels disconnected between the amplifiers and the pitch adapter. This MCM had zero non-conductive cracked traces (from the visual inspection) and zero dead amplifiers. This problem was found Friday, November 5, at SLAC while testing 42 MCMs using the new electronic pitch-adapter test fixture. Earlier the same week 1 MCM already attached to a tray and SSDs at G&A was found to have about 300 disconnected channels. Also, at G&A and Pisa 2 trays were found to have a disconnection of 1 or more bias lines, which may be from the same root cause.

November 9, 2004MRB, SLAC NCR 2263 Inspections and Tests A new fixture designed at SLAC solves our old problem of not being able to test the connections to the amplifier inputs until SSDs are attached. This became a critical problem when the MCM mounting changed from screws to gluing. Initially our assurance was based on –Wire bond quality control at Teledyne –Visual inspection of all wire bonds and bond feet at MIP-2 at Teledyne –Sample testing of several preproduction MCMs by probing each pitch- adapter trace. After an MCM on Tower-0 was found with 25 cracked traces, we did the following: –Visual inspection for cracks in pitch-adapter (and manual probing with a DVM for continuity) traces before shipment to Italy. This appears to be quite effective, albeit with a rejection rate of 14%, requiring no more than 8 such cracked, nonconductive traces. –Tested with 200 thermal cycles whether the incidence of non-conductive cracks gets worse (it does not). –Stepped up existing efforts to get an electrical test method developed.

November 9, 2004MRB, SLAC NCR 2264 The Electrical Test Method Use a conductive, flexible strip (zebra strip) to short circuit 100% of the pitch-adapter traces to ground. –Bias HV is turned off, to protect it. –AVDDA must be turned on, but the resistance of the zebra strip is high enough that it does not draw enough current to cause any problem. Run a charge-injection scan and measure the response of each channel. –Channels with inputs shorted to ground will look dead. –Channels not connected to the pitch adapter will look alive, unless the amplifier is already dead for some other reason. So, if a channel measures good in the normal electrical test, with the input floating, AND it measures dead with the zebra strip applied, then we are certain that it is a good, connected channel. If a channel measures good with the zebra strip applied, then either –it is disconnected from the pitch adapter, or –the zebra strip did not make contact with the pitch adapter (false negative).

November 9, 2004MRB, SLAC NCR 2265 Pitch-Adapter Electrical Test Fixture CONNECTOR SAVER TEST FIXTURE ZEBRA CONNECTOR GROUND LEAD STORAGE CASE BASE MCM WITH PITCH ADAPTER SOFTWARE/ ELECTRICAL FIXTURE Designed by Peter Amnuaypayoat

November 9, 2004MRB, SLAC NCR 2266 Disconnected Ch. vs. Cracked Traces Visual inspection and test data from 41 MCMs. Note that the number of disconnected channels is probably a little bit overestimated, due to occasional false negatives given by the test fixture. (False positives are not possible, unless the connection is intermittent.)

November 9, 2004MRB, SLAC NCR 2267 Disconnected Ch. vs. Cracked Traces Visual inspection and test data from 41 MCMs. The 42 nd MCM had 151 disconnected and 0 cracked traces.

November 9, 2004MRB, SLAC NCR 2268 Bias Disconnects The pitch-adapter electrical test fixture will not detect problems with the bias traces. Our visual inspection rejected MCMs with even 1 cracked nonconductive bias trace, but this does not catch all problems. Up to now we relied on –100% electrical test of the PWB. –Visual inspection of the bias resistor. –Wire-bond QC and visual inspection at MIP-2 at Teledyne. Still, there are 2 cases of MCMs in Italy with bad (sometimes intermittent) bias connections. Therefore, we are now doing the following procedure on all MCMs before shipping to Italy: –Turn the bias voltage down to 2.5 V, and turn on the MCM power. –Using a voltmeter, probe each of the 16 bias traces past the bend region, and verify that the appropriate voltage (2.5 V or 1.5 V) is seen.

November 9, 2004MRB, SLAC NCR Overstress Analysis & Additional Testing We tried out the test fixture on the 4 nonflight MCMs that we recently passed through 200 thermal cycles from  30C to +85C. –3 were not bad, with the worse case being 15 disconnected channels. –4 th had 60 to 80 disconnected traces, depending on the test trial. The results were variable, and we found clear cases of false positives. The pressure from the fixture was causing reconnections of some of the failed traces. This experiment would be more interesting if we had a measurement before the thermal cycles as well as after. A more relevant test will be to check the connections at MIP-3 (i.e. at Teledyne) and then again after thermal cycles and burn-in at SLAC.

November 9, 2004MRB, SLAC NCR Suspected Root Cause We suspect failure of the wire bonds where they connect to the pitch adapter. They are not visible (black encapsulant), but we have indirect evidence: –Cracked traces in the visible region of the pitch adapters are eliminated by our thorough visual scans. –Our visual inspection at MIP-2 ensures that the wire bonds were there and were initially connected (we couldn’t fail to see 151 disconnected or missing bonds!). –The MIP-2 visual inspection also rules out that any significant number of the disconnected channels could be due to pitch-adapter cracks close to the cut edge. –The very low failure rate of wire bonds on the power and digital I/O GTFE connections nearly rules out wire-bond failure on the ASIC side of the bond. –The pitch-adapter substrate is the more difficult material to wire bond to. So, we believe that either the bonds failed during encapsulation or later during thermal cycling. The intermittent ones must have failed after encapsulation in order to have the foot still so close to the pitch-adapter trace.

November 9, 2004MRB, SLAC NCR Impacts to Inventory The 1-in-42 (2.4%) occurrence of large numbers of disconnected bonds is not a big problem for MCM availability. The 14% loss due to >8 cracked traces is a big problem. At that rate we have to review again whether we will have enough parts to complete the build, given that this is not the only source of loss of MCMs (e.g. Tower-0). I suggest that we consider raising the maximum number of bad channels from 8 to 15. This is the limit used at the tray level and corresponds to a worst-case inefficiency of 1%.

November 9, 2004MRB, SLAC NCR Corrective Action Test all MCMs with the PA test fixture both at MIP-3 and before shipping to Italy. We need to manufacture one more fixture. Review and possibly improve the Teledyne wire-bonding controls. The present procedure calls for the following: –Plasma clean in Tepla (Recipe #1) prior to wire bonding. –At the start of each shift, wire bond the test pattern on a single die on the wire bond set up PCB. Perform 100% destructive pull test. During actual wire bonding, perform Non destructive Pull Testing (NDPT) on every 3rd unit. NDPT test on 2 die, 30 wires on a single PCB only. Update and re-release the burn-in and test procedure LAT-TD Verification plan: –Test our remaining MCMs with the PA fixture asap. –Consider doing extra thermal cycles on some non-flight MCMs, with tests before and after.

November 9, 2004MRB, SLAC NCR Effectiveness of Corrective Action The PA test fixture is almost guaranteed to find the missing connections, the only exception being cases where the pressure from the fixture results in a temporary reconnection. This will not happen on all or even most of any large number of missing connections on a given MCM. There is some concern that the tray-level thermal cycles could produce more disconnections. –The burn-in procedure thermal cycles are more severe in terms of number of cycles (20 vs. 4) and range (  30C to +85C vs.  30C to +55C). –This would be the reason to try some more extensive thermal cycle testing on non-flight MCMs.

November 9, 2004MRB, SLAC NCR Recommended Disposition Scrap (use for EGSE) the MCM that is the subject of NCR 226. Return all MCMs to SLAC that have not been tested with the PA fixture and bias-circuit hand probing. Begin mounting to trays those MCMs that passed the PA and bias probing tests.