01/17/20021 4-CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.

Slides:



Advertisements
Similar presentations
May 2014 PWG Meeting 2013 UFE Analysis Prepared by Data Aggregation.
Advertisements

ERCOT Billing, Settlement Disputes & Data Extracts
October 28, 2014 Update to RMS 1. * Reviewed and Discussed: * ERCOT Protocols and Retail Market Guide Requirements * TDSPs’ Data Processes for IDR vs.
ERCOT 2003 UFE ANALYSIS By William Boswell & Carl Raish AEIC Load Research Conference July 13, 2005.
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
Hurricane Rita. 2 ERCOT Preparation ERCOT started alerts to QSEs and TOs on 9/21 Did a site failover of EMMS system Austin Taylor Procured satellite voice.
1 AMS Data Workshop ERCOT Overview of AMS Data Processes June 27, 2014 ERCOT June 27, 2014.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
Profiling Working Group January xx, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January ??, 2006.
SCR 740 Implementation of Web Services for ESIID level data Jackie Ashbaugh EAA Data Management.
Current DG Framework for Competitive Areas of ERCOT DREAM TF September 28, 2015.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
Profiling Working Group January 11, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January 11, 2006.
Profiling Working Group August 2, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting August 22, 2006.
Distributed Generation Registration Threshold Protocols Section 16.5 (5) ERCOT Staff DER Workshop June 18, ERCOT Public.
1 Presented to ERCOT Retail Market Subcommittee January 9, 2002 Profiling Working Group Darryl Nelson, Chair Load Profiling Operating Guides (LPOG)
Distributed Energy Resources Concept Document Discussion ERCOT Staff DREAM Task Force Aug. 25,
UFE 2003 Analysis June 1, UFE 2003 ANALYSIS Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation June 1, 2005.
ERCOT MARKET EDUCATION
Texas Nodal Section 9: Invoicing ERCOT, Settlements & Billing SDAWG - August 2007.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
June 17, Strategic Framework Business Definition and Strategic Issues Board of Director’s Meeting June 17, 2003 ERCOT Strategic Planning Task Force.
April 15, 2003 UFE 2002 ANALYSIS. April 15, 2003 LOAD AND UFE – ERCOT PEAK 2002 This is a graphic depiction of load and UFE on the ERCOT Peak Day for.
ERCOT Demand Response Spring 2015 ERCOT Operator Seminar.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
UFE 2005 Analysis 1 UFE 2005 ANALYSIS Compiled by Load Profiling ERCOT Energy Analysis & Aggregation.
May 03, UFE ANALYSIS Old – New Model Comparison Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation May 03, 2007.
Calculation of Net Energy for Load COPS. 2 2 Outline  Definition of Net Energy for Load  How Net Energy for Load is calculated in ERCOT.
GENERATION PROTOCOL AND SETTLEMENT TODAY COMET WG / RMS Workshop Electric Reliability Council of Texas May 2, 2007.
UFE 2008 Analysis 1 UFE 2008 ANALYSIS Compiled by Load Profiling Energy Analysis & Aggregation.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
1 ESI ID SERVICE HISTORY AND USAGE DATA EXTRACT SYSTEM CHANGE REQUEST (SCR 727) February 24, 2003.
1 RMS Update - ERCOT May 14, Supporting Reports Section.
1 UFE Workshop Sponsored by COPS October 19, 2004.
ERCOT UFE Analysis UFE Task Force February 21, 2005.
1 History of UFE (shortened version of presentation provided at UFE Taskforce Workshop on 9/14/2004) UFE Taskforce Meeting February 21, 2006.
Load Profiling Working Group RMS Presentation 8/01/2002 by Ernie Podraza Reliant Energy Retail Group Chair PWG.
MARS 867_03F ROR vs. Settlement vs. 810 Scenarios ERCOT September 2008.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
Profiling Working Group October 16, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting October 16, 2003.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
Price Responsive Load / Retail DR RMS Update Paul Wattles Carl Raish October 6, 2015.
MARS Taskforce RMS Update November 10, Conference Call concerning Settlement Estimates TDSPs held a conference call on October 28, 2010, where we:
ERCOT MARKET EDUCATION Retail 101. Smart Meter Technology.
1 Presentation MIT November 14, 2011 Metering Issues Taskforce (MIT) Elimination of Time Error Correction Potential Impact on Wholesale Settlements.
Distributed Generation Registration June 30, 2008.
Profiling Working Group August 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting August 14, 2003.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
Price Responsive Load / Retail DR DSWG Update Paul Wattles Carl Raish September 17, 2015.
Demand Response Task Force. 2 2 Outline  Overview of ERCOT’s role in the CCET Pilot  Overview of Stakeholder Process – What’s been done to date?  Questions.
Retail Market Update August 6, Load Profile Guides In accordance with section § (e) (3) and PUCT Project 25516, Load Profiling and Load Research.
October 13, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements Task.
MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/ TAC3/7/ /22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
PRR 568 – Settlement Timeline September day Analysis COPS October 25, 2005.
RMGRR058 Overview RMS Meeting – August 15, Background / Reference PUCT Substantive Rule 25.43(n)(8) Protocol Customer Billing Contact.
1 ERCOT COPS Round 2 Sample Design Review April 10, 2007.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
Price Responsive Load / Retail DR RMS Update Paul Wattles Carl Raish September 1, 2015.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Program MIS Web Portal Business Requirements Review Current.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
Calculations of Peak Load Contribution (PLC) AND Network Service Peak Load (NSPL) As of 1/1/2016.
MARS Taskforce RMS Update October 13, 2010.
Hurricane Rita.
MARS Taskforce RMS Update December 9, 2009.
PLC = Peak Load Contribution (aka “ICAP”)
Energy Storage Settlements Consistent with PUCT Project & NPRR461
CEO Report Thomas F. Schrader ERCOT Board of Directors May 17, 2005
Presentation transcript:

01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas

2 Protocol References 9.8 Transmission Billing Determinant Calculation ERCOT will provide the market with the determinants defined below to facilitate billing of Transmission access service. ERCOT will not be responsible for billing, collection or dispersal of payments associated to Transmission access service ERCOT shall calculate and provide to Market Participants via MIS the following data elements annually to be used by TDSP’s as billing determinants for Transmission access service. This data shall be provided by December 01 of each year. This calculation shall be made in accordance with the requirements of the PUCT. The data used to perform these calculations shall come from the same system(s) used to calculate settlement-billing determinants used by ERCOT: 1. The 4-Coincident Peaks (4-CP) for each TDSP, as applicable. 2. The ERCOT average 4-CP. 3. The average 4-CP for each TDSP, as applicable, coincident to the ERCOT average 4-CP. Average 4-CP is defined as “the average Settlement Interval coincidental MW peak occurring during the months of June, July, August, and September.” Settlement Interval MW coincidental peak is defined as “the highest monthly 15 minute MW peak for the entire ERCOT Transmission Grid as captured by the ERCOT settlement system.”

3 Data Aggregation Process

4 Quantity Conversion & Sum by TDSP For each load cut, there are 96 interval of MWH data Unique combinations of LSEGUFE for the 4CP trade dates 949 in August 1,121 in September Quantity Conversion consists of converting the MWH data into KW KW = MWH X 4 X 1000 LSEGUFE Load Cuts are Summed by TDSP for the peak interval. Note: Cuts where the Lodestar LSE Code equals a DC Tie name were omitted from the TDSP totals.

5 Data Cut Definitions Load Segment Cut Type: LSEGUNADJ = Base Load values LSEGDL = Base Load + Distribution Losses LSEGTL = Base Load + Distribution Losses +Transmission Losses LSEGUFE = Base Load + DL + TL + UFE Lodestar LSE Code: ( 1 = RELIANT LSE) Lodestar QSE Code: (14 = RELIANT) Load Profile Code: Distribution Loss Factor Code (A-E or T) UFE Settlement Zone Congestion Management Zone Lodestar TDSP Code: (1 = RELIANT)

6 Lodestar TDSP to 4 CP Entity Mapping 126 Unique TDSPs in Lodestar 77 Load Entities in 4 CP Submission s 77 Load Entities in 4 CP Submission s Versus Lodestar TDSPs are mapped to the corresponding 4-CP Load Entity Listing. KW Per Lodestar TDSP is summed per mapping. Complete mapping list is included in ERCOT filing with PUC

7 Process Summary Select Peak Interval and Convert MWH to KW Sum KW per Lodestar TDSP (Omitting DC Ties) Sum Lodestar TDSPs to 4CP Entity List Compile 4 Months data into Average 4CP for PUC Filing Determine Time of Peak for each 4 CP Month Secure Aggregation Load Cut Data for 4 CP Trade Days

8 UFE Data MWH 1,732,080 KW August 16: MWH 1,659,400 KW September 7 16:30 Energy is allocated to load cuts in competitive TDSP service areas based upon UFE allocation mechanism in Section 11 of Protocols.

9 What’s New with the Resettlement Data? Less Estimation 100% of IDR Data was Present 99+% or Non-IDR Data was Present Data Modifications Corrections to NOIE Wholesale Points Removal of ESI IDs created in error Removal of Substation ESI IDs Correction to Generation Site Data New Peak Day Revealed for August New Peak is August 15 4:30 PM (Previous August peak was August 22 4:45 PM)

10 Comparison of August Data (March ’02 data VS October ’02 Data) 0.0% Change For The Remaining 70 Entities

11 Comparison of Sept 7 th Data (March ’02 data VS October ’02 Data) 0.0% Change For The Remaining 72 Entities

12 Comparison of March ‘02 Filing to October ‘02 Filing 0.0% Change For The Remaining 72 Entities

13 Transmission Connected IDR Information

14 Questions