SEG4911 – Projet génie logiciel en fin d’études / Software Engineering Capstone Project The Final Drive to Your A+ Timothy Lethbridge University of Ottawa.

Slides:



Advertisements
Similar presentations
Company Name Sample Template Presenter Name
Advertisements

George Spyrou, Financial Manager Navigo Shipmanagers, Limassol, Cyprus
SADC Course in Statistics Producing a product portfolio Module I3 Session
Project Procurement Management
SEG4910 – Projet génie logiciel en fin détudes / Software Engineering Capstone Project Syllabus, Rules, Process and Deliverables Timothy C. Lethbridge.
Instructions. Each presenter can have upto a maximum of 7 slides. Each presenter has 5 mins to explain : The Background The Customer The Problem The Solution.
Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
EDGE™ Project Background Presentation Open Architecture Land Vehicle Christopher Wakeley (Mechanical Engineering) DPM Student Presenter 2 (Dept) DPM Student.
Team Name Conceptual Design Review University/Institution Team Members Date.
MATH How to be A Great Student. How to Master the Course Using Four Major Steps NEXT.
Comments on this template -Leave time for questions -Leave time for demonstration -Use your actual hardware in the presentation -Practice your presentation.
Quality is about testing early and testing often Joe Apuzzo, Ngozi Nwana, Sweety Varghese Student/Faculty Research Day CSIS Pace University May 6th, 2005.
1 Testing. 2 About Testing  The reason the program is in testing is that it probably doesn’t work!  We test to find bugs before our users and hope that.
COMP4710 Senior Design Richard Chapman. Outline What is Senior Design? What is Senior Design? Course Structure Course Structure End of Cycle Binder End.
Lesson Design Study Suggestions from our text: Leading Lesson Study.
 QUALITY ASSURANCE:  QA is defined as a procedure or set of procedures intended to ensure that a product or service under development (before work is.
Project Scope Management
SEG4911 – Projet génie logiciel en fin d’études / Software Engineering Capstone Project Thoughts about Agile Design and Release Management Timothy C. Lethbridge.
Effective Methods for Software and Systems Integration
Kaijser labs Advance disruptive ideas All rights reserved Kaijser Labs©
1 Part 5: Closing Task 1 Kelvin asked you to help him prepare and present the final project presentation. Prepare a short presentation to summarize result.
FINAL DEMO Apollo Crew, group 3 T SW Development Project.
PHASE 4 SYSTEMS IMPLEMENTATION Application Development SYSTEMS ANALYSIS & DESIGN.
Cover Slide Company Name
CAMP 4:4:3 Power Session 18: Closing. Power Session 18 Slide 2 Closing Introduction Seeking mastery is a process and a path, not an event. - The Millionaire.
資工 4A 陳怡秀 Microsoft Visual Studio’s Journey to Continuous Delivery.
Software Engineering Program School of Information Technology and Engineering ugrad/softwareengineering.html.
Tablet PC Capstone CSE 481b Richard Anderson Craig Prince.
Understand Application Lifecycle Management
AOIT Introduction to Programming Unit 4, Lesson 11 Documenting Bugs and Fixes Copyright © 2009–2012 National Academy Foundation. All rights reserved.
T Software Development Project I Customer Info Jari Vanhanen Ohjelmistoliiketoiminnan ja –tuotannon laboratorio Software Business and.
COM 417 Learning Outcomes At the end of this session you will be able to:  Understand where you lost marks in your CV and.
MONASH UNIVERSITY LIBRARY’S QUALITY SELF REVIEW: INVOLVING ALL STAFF M. Pernat Monash University Library, Monash University, Victoria, 3800 QUALITY AT.
Project Title (as descriptive as possible) Group Members CPE495 Group ??? Computer Engineering Design I Electrical and Computer Engineering The University.
-1- Project Name Project Name Weekly Project Report Project Manager : __________________ Date : ___________________.
1 SEG4910 – Projet génie logiciel en fin d’études / Software Engineering Capstone Project Review of Analysis and Iterative Development Timothy C. Lethbridge.
1 Cover Slide Company Name Company Contact info Tagline This template provides a basic outline for a short investor pitch. Focus on visuals, graphs, and.
Fall 2010 UVa David Evans cs2220: Engineering Software Class 28: Past and Future.
1 SIGCSE Panel on Client-Sponsored Projects - T.C. Lethbridge Experiences with Client- Sponsored Projects (Project Assessment) Timothy C. Lethbridge University.
Requirements Management with Use Cases Module 10: Requirements Across the Product Lifecycle Requirements Management with Use Cases Module 10: Requirements.
Project Deliverables CEN Engineering of Software 2.
10 Aug 2010 ECE/BENG-493 SENIOR ADVANCED DESIGN PROJECT Meeting #2.
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
This template is designed to organize your project work for presentation. This to remember as you complete this presentation: 1.After you have completed.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
End of Sprint Meetings (Ceremonies)
1 Calculating a break-even point Calculate the break-even quantity, profit and margin of safety Use these methods to analyse the effects of changes in.
Team members listed here..  Over the first few slides you will explain your business concept. ◦ On this slide provide a description of CEW services already.
ITM 353 Final Project Demos. Your Last Assignment There’s one more fun presentation in store for you all: the Transition Readiness Review (TRR) aka your.
Introduction to Agile. Introduction Who is this guy?
Next Steps.  Uses a backward planning process:  Scope and Sequence: identifies the appropriate DP competencies and state content standards students.
Maximizing LinkedIn Expand Your Network & Enhance Your Personal Brand Hi, I’m awesome.
1 SEG4910 – Projet génie logiciel en fin d’études / Software Engineering Capstone Project Review of Quality Assurance Timothy C. Lethbridge Derived from.
A POCKET GUIDE TO PUBLIC SPEAKING 4 TH EDITION Chapter 32 Technical Courses.
BUS 611 Week 2 Assignment Project Risk Project Risk. Risk is often described as the event that “might” happen during the course of a project. Explain how.
Project management Software development typically includes:
Testing More In CS430.
How to Avoid Communication Pitfalls
CPMGT 300 Competitive Success/snaptutorial.com
CPMGT 300 STUDY Lessons in Excellence--cpmgt300study.com.
CPMGT 300 Education for Service/snaptutorial.com.
CPMGT 300 Teaching Effectively-- snaptutorial.com.
Team members: Project Manager: Facilitator: Customer Liason:
Engineers’ Council Funding Request Presentation
Lesson 6 Creating your presentation.
Word List: in in, inside, into
LES Asia Pacific Regional Conference 2018
Word List: in in, inside, into
Our QuickBooks support team have highly, skilled, dedicated and experienced and take their work in seriously and very trustful for every QuickBooks Support.
Presentation transcript:

SEG4911 – Projet génie logiciel en fin d’études / Software Engineering Capstone Project The Final Drive to Your A+ Timothy Lethbridge University of Ottawa 1

The home stretch: Key things to do to maximize your mark 1. Ensure your customer gives you a good rating  Meet with them  Demo to them regularly  Surprise them with ‘something extra’  Be responsive to their change requests  Invite them to the final course demo  Promise them a small amount of support after the course (only if you can deliver on this) 2

Things to do … 2. Focus on quality at the end  Drop of hide things that are not going to be working well  Clean up the code (but be careful not to break it) Ensure there are good comments, etc.  Drive down your list of bugs by fixing them And show a graph of this 3

Things to do … 3. Prepare your final presentation with flair and showmanship  Customers, and other people may be invited  Do a full-fledged demo With a decent sized, interesting example On the real system, not simulated Practice many times so you don’t stumble on remaining bugs 4

Things to do … 3. the presentation, continued  Pretend you are demonstrating to a venture capitalist who may be interested in funding your ‘company’  In addition to the demo Explain interesting design issues, algorithms Give an overview of how your management and quality assurance plans worked out Describe what changed from the original plans Discuss lessons learned and war stories 5

Things to do … 4. The final report  Fill in details of the template you have been building As always, highlight the important changes  Expand on the items on the previous slide that are also key in the presentation  Explain how each team member contributed, and whether you think any member contributed at a higher level than the others 6