Predictive Learning for Energy Storage Dinos Gonatas (978) Ryan Hanna Center for Renewable Resources and Integration Mechanical and Aerospace Engineering UCSD
UCSD Microgrid Overview: 42 MW Peak Load - 66% efficient 27 MW gas cogeneration 10,000 tons steam-chillers 7,800 tons electric chillers Energy Storage: 3MW/ 6 MWh -2MW/ 4MWh BYD system -ZBB -Sanyo -BMW 2 nd life battery
UCSD Battery/ BMW Project
UCSD Solar Forecasting
Why Forecasting?
Anticipating where ball is going to be
Cornerback Malcolm Butler acts on prediction to affect outcome (decisive play clinching Superbowl 49)
Use Cases Building load forecasting + batteries (and/or PV) Grid Storage/ non-transmission alternatives Ramp smoothing for PV generation
Architecture Predictive analytics collects and analyzes sensor data/ grid status Drives optimization engine, controlling battery state of charge, eg. with Modbus interface Inverters Energy Storage/ BMS Predictive Analytics System Optimization/ batery controls Sensor data Sensor data Grid status Grid status Weather / other data Microgrid
Building Load Forecasting 6 hour forecast: using previous time history + weather data Key for deciding when to charge/ discharge battery for demand management prediction actual
Economics of Bad Forecasts
Solar Ramp Problem 14
Implications -Large production fluctuations cause instability in weak electric grids such as Hawaii, Puerto Rico -Penalties imposed when output changes more than 10%/minute -Avoiding penalties using batteries for storing excess production is $$$
How to Smooth Out Steep Ramps? Ramp exceeding limits
Proposed Solution: Smart Ramp Smoothing by Predicting Impending Power Changes + Sky Imaging Camera/ Production Forecasting PV + Inv control PV + Forecast PV + Storage Inverter and Battery Controls
Smart Forecasting Algorithm Green: measured black: USI nowcast red: USI 15 min forecast issued at 1732 Power Generation (arbitrary units) Plant A Plant B Plant C Plant D Large altocumulus cloud field is about to shade the plants
Cloud Prediction Using Sensor Arrays Predictions from SMUD sensor array
Simulated 5% Ramp Control w/o Forecasting: Steep Output Ramps 5% ramp limit
Ramp Smoothing With Batteries Without Forecasting 5% ramp limit
Ramp Smoothing With Forecasting Ramp smoothed out Battery cycle anticipates PV ramp (just as football player anticipates where ball is thrown)
Knowing Future Production Mitigates Ramps Ramp smoothed out
Knowing Future Production Mitigates Ramps Ramp smoothed out
Ramp Violations Eliminated With Right Combination of Forecast and Battery 10% Ramp limit 24kW PV array
For a battery of a given size, discharging it less extends cycle life (= cost reduction) DoD 80% 3000 cycles DoD 60% 5000 cycles DoD 40% cycles
Conclusions: Implementing forecasting in energy storage can enhance performance 2x Reduce battery size 50%, or with fixed battery size, enhance performance or reduce cycling – Same as lowering battery cost