Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.

Slides:



Advertisements
Similar presentations
McKenna Boulevard Traffic Management Meeting Presented to: McKenna Blvd. Residents W. Madison Police Precinct, Madison June 13, 2007.
Advertisements

Coronado Transportation Commission Status Report to City Council February 21, 2012 Presented by Mike Giorgione, Commission Chairman.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
In March 2015, Mayor Murray announced a proposal for a new 9-year, $900 million transportation levy to replace the Bridging the Gap levy that expires at.
Strategic Approach to a Walkable Edmonton Pro Walk / Pro Bike 2004: Creating Active Communities September 9, 2004.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
T.H. 23 / South Saratoga Street Reduced Conflict Intersection and Pedestrian Overpass Project Project hearing October 14, 2014 City Council Presenters.
March 14, 2013 CSSC Transportation Update. APG Traffic Counts Tuesday (2/26/13)Wednesday (2/27/13)Thursday (2/28/13) 6:00 – 7:00 AM :00 –
Building Innovative Facilities for a Multimodal Future 2014 BICYCLE MASTER PLAN UPDATE FINAL PUBLIC REVIEW Baltimore City Department of Transportation.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
Slide 1. Slide 2 Introduction How did you get to school as a child?
5/19/20151 Segoe Road Proposed Remarking Plan Scott Langer Traffic Engineer City of Madison Traffic Engineering Division Madison, Wisconsin.
Accessible Mt. Baker Integrated Multimodal Plan Seattle Planning Commission Michael James, SDOT January 8, 2015.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting January 27-28, 2015.
Lecture #12 Arterial Design and LOS Analysis. Objectives  Understand the factors in arterial design Understand how arterial LOS is determined.
3rd Street Light Rail Process and Challenges of Developing Transit Signal Priority Javad Mirabdal, Jack Fleck & Britt Thesen Department of Parking and.
CBD Curbspace & Multimodal Decision Framework Study Seattle Planning Commission Meghan Shepard, Michael James November 13, 2014.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
SafeZone Martin Baker Road Safety Team Leader Poole Borough Council Kevin Jones UK Product Sales Manager Siemens.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
May 1, 2014 East Gude Drive Pedestrian Road Safety Audit Stakeholder Pedestrian Safety Meeting.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Comprehensive Plan Update Kevin O’Neill Seattle Bicycle Advisory Board September 2, 2015.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
23 rd Avenue Corridor Greenway Community Open House November 6, 2013.
Lecture 6: Stop Sign Control & Signalized intersections & Design LOS Explain there is hierarchy of intersection control Use the warrants for 2-way stop.
City Leadership & Bike Edina Task Force Annual Work Session February 16 th, 2010.
National Institute for Transportation and Communities (NITC) UTC SAFETY SUMMIT MARCH 19-20, 2015.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
 Rice Street Traffic Study Proposal Presentation to the Saint Paul CIB Committee March 31, 2015.
Peachtree Road Transformation Project: Operations and Safety Analysis P.I Fulton County August 25, 2015 Buckhead CID 1.
Slower vehicle speeds (under 30 mph) means less severe crashes 90% reduction in fatalities, 76% reduction in injury crashes 75% fewer vehicle conflict.
Fairview Avenue North Bridge Replacement Project Seattle Bicycle Advisory Board MariLyn J. Yim, P.E. October 7, 2015.
CITY OF RAINIER RAILROAD CROSSINGS 1. Team Members Matthew DeGeorge Robert Acevedo Josh Crain Jim Harvey Heather Wenstrand 2.
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting May 13-14, 2014.
SPEED TABLES FOR CORONADO ROAD BETWEEN 7 TH STREET AND 10 TH STREEET.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
 Connect the Coastside Presentation Half Moon Bay City Council Briefing March 15,
Pedestrian Master Plan Update Seattle Planning Commission Michelle Marx, Ian Macek, Kevin O’Neill May 26, 2016.
8 th Ave S 2016 Pedestrian Improvements South Park Neighborhood Association David Allen, Sue Byers, Alisa Arment April 12, 2016.

Thoroughfare Plan Update
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
APTA Sustainability and Public Transportation Workshop Benjamin Smith
Vision zero IN NYC NYC's Data Driven Approach to Saving Lives
Project Management Team Meeting #3
Center City Connector 101.
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
Arizona Conference on Roads and Streets Multimodal Cities: Addressing Issues in Transit Corridors March 24, 2016.
The Ladybird ( th Street NW)
Safe Routes to School National Conference Ashley Rhead April 5, 2016
Sarno Road Corridor Study
Traffic Study Presented by Keith Wenners, pe, ptoe
M14A/D Select Bus Service
Signal Operational Review Performance Monitor *
West Cervantes Traffic Feasibility Study Jill Lavender, Transportation Planner Cory Wilkinson, AICP CEP, Project Manager Mary Morgan, PE, Engineer.
Presentation transcript:

Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015

Our mission, vision, and core values Committed to 5 core values to create a city that is: Safe Interconnected Affordable Vibrant Innovative For all Mission : deliver a high-quality transportation system for Seattle Vision : connected people, places, and products 2

Presentation overview Background Existing conditions Pilot project implementation Next steps 3

Background Rainier Avenue S, between Letitia Avenue S and Seward Park Avenue S November 2014: Corridor study began March 2015: Design alternatives meetings July 2015: Announcement of pilot project

Speed studies 5 Posted speed limit on Rainier was 30 miles per hour (mph) Location85 th percentile speed Average number of high-end speeders (10+ mph over posted speed limit) S Hudson Street35 mph611/weekday 42 nd Avenue S38 mph1812/weekday S Holly Street37 mph1083/weekday S Cloverdale Street36 mph1083/weekday

Collision data Last 3 years 1243 total collisions 630 injuries 2 fatalities Last 10 years Nearly 3600 total collisions injuries 11 fatalities 6 Average of 1 crash/day on Rainier 6

Collision data 7 37,000 to 74,400 34,600 to 40,40019,700 to 26,600 Average daily traffic

8 Collision data Average time to clear incidents = 47 minutes

Updated volumes on Rainier and nearby arterials Turning movement counts collected at every intersection –During AM peak, off-peak, and PM peak hours –Includes counts of people walking, biking, using transit, and moving goods Recorded corridor travel times Reviewed detailed transit data 9 Data collection

Modeled “peak” period –hour of the day where recorded traffic volumes were highest 10 Traffic modeling Peak period

2015 pilot project July 30: Pilot project announced August 3: Implementation began August 6: Channelization and signal timing changes complete August 14: Project substantially complete Rainier Avenue S, between Letitia Avenue S and Seward Park Avenue S Rainier Avenue S, between S Alaska Street and S Kenny Street

Rainier “Pilot” Redesign –Option 2 – hybrid design –S Alaska to S Kenny (0.9 miles) –One lane in each direction with center turn lane –25 mph speed limit –Longer pedestrian crossing time at all signals –Leading Pedestrian Interval at Rainier and Ferdinand –New parking spaces and more space to park on Rainier pilot project TYPICAL CROSS SECTION (PLANNED) TYPICAL CROSS SECTION (EXISTING) 7’

Bus and turn lanes between Edmunds and Alaska Southbound transit queue jump at Edmunds Southbound left turns to be restricted at Edmunds Left turns will be permitted at Angeline and PCC entrance Turn restrictions at Safeway implementation plan CROSS SECTION (PLANNED) TYPICAL CROSS SECTION (EXISTING) Rainier at S Edmunds Street

Enforcement 14 Increased enforcement efforts through SeaStat- Vision Zero partnership Enforcement priorities: –25 mph speed limit –Left turn restriction at Edmunds –Aggressive driving

Evaluation began upon project completion –Weekly travel time data collected for vehicles and transit –Weekly speed studies –Volume and turning movement counts on Rainier and nearby streets –Monitoring collision data –Signal, signage and channelization adjustments –Public feedback 15 Evaluation

Continue analysis of design alternatives Community design meetings Engineering changes from south to north Coordination with Greenway implementation and Accessible Mt. Baker project Pedestrian signal design changes at Rainier and Oregon

Next steps 2015Evaluation and Vissim modeling Winter 2016Project information sessions Summer/Fall 2016Phase 2 implementation begins 17

Questions? | (206)