J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.

Slides:



Advertisements
Similar presentations
1 Impact of Decisions Made to Systems Engineering: Cost vs. Reliability System David A. Ekker Stella B. Bondi and Resit Unal November 4-5, 2008 HRA INCOSE.
Advertisements

Medium-Voltage Switchgear - Then and Now -
Copyright© Voltimum Experts – not to be reproduced without prior consent of Voltimum UK Voltimum Expert Topic – Power Harmonics.
Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
© ABB Group May 15, 2015 | Slide 1 The MotorAdvantage – how to save UK industry Steve Ruddell, Division Manager, Discrete Automation and Motion, ABB Ltd.
CERN Safety Alarm Monitoring (CSAM) CERN Safety Alarm System Supervisory Board 6st meeting Luigi Scibile & CSAM project team.
PowerCare Customer Support Agreement LP Products and Systems 2013 PM.
Definition Reliability is a general quality of an object – an ability to perform a desired function, sustaining the values of rated operational indicators.
Flanders Electric – Engineering Division Welcomes Youto an Overview of Reconditioned Switchgear.
Consolidation program SPS Main Power Converters (Dipole & Quadrupole) K. Kahle / Q. King / G. Le Godec (TE-EPC) IEFC Workshop, 9 March 2012.
Cristiana Colloca GS/SEM – ATOP – MARCH 2009 Infrastructure Consolidation of Accelerators Injectors (civil engineering) Cristiana Colloca GS/SEM – ATOP.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on.
17.March Connection to the CERN Power System of the TT2 mercury target project by Karsten KAHLE (TS-EL)
CONSOLIDATION ON CIVIL ENGINEERING AND TECHNICAL INFRASTRUCTURE P. Alves, M. Nonis, P. Pepinster, W. van Baaren 6 th ST Workshop – March 2003.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
Introduction S. Baird 12 th September Accelerator Consolidation Workshop  Why are we here?  Boundary conditions  What is (not) included?  Outcome.
Barcelona, May 13, 2003 ASSET MANAGEMENT Development of new approaches Gerd Balzer Darmstadt University of Technology TU Darmstadt Institute of Electrical.
Voltimum Expert Topic – Power Harmonics. What are Harmonics? They are waveforms with frequencies that are multiples of the fundamental frequency (Typically.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Compact & Low Consumption Magnet Design Workshop for Future Linear and Circular Colliders Geneva, November 26-28, 2014 Saving opportunities in accelerator.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson Technical Board June 23,
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
Utility Engineers, PC.  Generation  Transmission  Distribution.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Jean-Paul BURNET, AB/PO ATC-ABOC days, 22 January 2007 PS Main Power System: What has been done from June 2006? What will be the situation in 2007? PS.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Power Quality Karsten KAHLE Electric Power Converter Group (TE-EPC) High Power Converter Section Review of CERN’s Electrical Power Network October.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Static Var Compensator Status (SVCs for Booster and SPS) Situation in 2009 Karsten KAHLE, TE-EPC ATOP days March 2009.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
ABOC/ATC days Electrical Network: Selectivity and Protection Plan José Carlos GASCON TS–EL Group 22 January 2007.
THE NEW STATIC VAR COMPENSATOR FOR SPS – COMMISSIONING RESULTS based on the CIRED2003 conference paper from K. Kahle, J. Pedersen (CERN) and T. Larsson,
LARSSON SE Session 2 – Block 2 Barcelona May The new 150 Mvar, 18 kV SVC at CERN – background, design and commissioning K. Kahle, J Pedersen,
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
A second Thyristor Controlled Static Var Compensator for SPS
Ans Pardons (with input from Jean-Marc Cravero) CERN CNGS Horn Experience (issues since NBI2010) Ans Pardons, CERN 1 NBI2012.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.
SMB SMB-SE group L. Scibile 1. SMB Mandate The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
Electrical Distribution Analysis & Testing Everything You Need To Know About Power Distribution By Current Solutions PC.
YETS & LS2 Works EN-EL / Power distribution
Situation of the Static Var Compensators at CERN.
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
CONS and HL-LHC day Analysis of needs from BE-CO
YETS & LS2 Works EN-El on LHC / Power distribution
Background B513 built in early 1970’s for mainframe era.
the high-voltage network of CERN ToMORROW
the CERN Electrical network protection system
SPS activities during LS2 TE-EPC (Power Converter Group)
YETS & LS2 Works EN-EL / Power distribution
POPS Strategy for Restarting & Repairing
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003

J. Pedersen, ST/EL BACKGROUND The function of CERN relies on an important infrastructure. Until the commissioning of the LEP the main concern was to maintain the infrastructure. Since a few years parts of the infrastructure have reached an age where consolidation – in the form of renovation or replacement of systems – has become inevitable.

J. Pedersen, ST/EL A Few Useful Terms, 1  Maintenance: –Keep existing equipment in perfect order with the operational parameters within the specified limits. –The maintenance is made regularly and is a natural part of equipment operation. It requires short outage and is low cost compared to the investment value of the equipment.

J. Pedersen, ST/EL A Few Useful Terms, 2  Renovation: –Thorough overhaul of existing and ageing equipment. Requires long outage and is of considerable cost compared with the investment value of the equipment.

J. Pedersen, ST/EL A Few Useful Terms, 3  Replacement: –Scrap existing equipment and replace it by new.  Consolidation: –Major intervention, far beyond maintenance.  Either to give an existing system a “New lease on life”. (Renovation)  Or purchasing a new system (Replacement.)

J. Pedersen, ST/EL A Few Useful Terms, 4  Prospective lifetime: –Period where spares and support are available and where failure rate and maintenance cost are acceptable.

J. Pedersen, ST/EL Prospective lifetime  The end of the prospective lifetime is reached when the failure rate starts to climb on the right side of the “bathtub” curve Maladies d’enfance Accepted failure rate Failure rate Time The increasing failure rate indicates the approaching end of The prospective lifetime.

J. Pedersen, ST/EL Maintenance:  Most technical equipment must undergo maintenance during its lifetime, in order to make optimum use of it.  The maintenance should be planned from the beginning. Both technically and financially.  This way the equipment will function a long time before….

J. Pedersen, ST/EL Renovation  Requires long outage and is of considerable cost… –Is the equipment worth it? –Can “active” parts be changed and “passive” parts be kept? –Is there a good economy in this solution? –Is there time for the long outage? –Is there a risk of encountering surprises in the process?

J. Pedersen, ST/EL Replacement: This solution holds the following advantages over the renovation: –Costs can be estimated with comparable precision. –The replacement costs may look higher, but the renovation does hold some quagmire-potential. –The old installation may run while the replacement is constructed.

J. Pedersen, ST/EL Candidates for consolidation  Single equipment or systems, that will stop accelerator operation in case of fault.  Single equipment or systems, that will stop an experiment in case of fault.  Single equipment or systems, that will impede CERN’s activities heavily. –No heating during winter –Rain through the roofs, down into costly electronics

J. Pedersen, ST/EL Characteristics  The consolidation interventions should be characterised by the following:  The cost should be beyond what can be covered by the maintenance budget.  The work should be planned and executed over a few years. It should be handled as a project with a schedule and a dedicated budget.

J. Pedersen, ST/EL Examples  The following examples show both active and passive systems in need of urgent replacement or renovation. In most of these cases we are on the right side of the “bathtub”.

J. Pedersen, ST/EL Meyrin site heating  The central heating system at Meyrin.  Existing since the very early days of CERN. The system is in a state that leads the people responsible for it to consider it a candidate for renovation or replacement.

J. Pedersen, ST/EL SPS roofs  A number of the SPS buildings have roofs that are leaking.  Following heavy rain, the equipment in the buildings is subjected to showers, not always compatible with the function: High voltage switchgear, RF systems etc.

J. Pedersen, ST/EL SPS reactive power compensation A second, new reactive power compensator is needed to arrive at a system no longer depending on the obsolete Saturated Reactors. A second, new reactive power compensator is needed to arrive at a system no longer depending on the obsolete Saturated Reactors.

J. Pedersen, ST/EL SPS 18 kV network  Buried 18 kV cables. –The cable system has caused a number of power cuts with accelerator and physics outage as consequence.  18 kV switchgear in the BA substations. –The 18 kV switchgear is obsolete, no longer supported by the manufacturer, neither with respect to maintenance nor with respect to spares. –The technology ( minimal oil breakers ) combined with the age renders the equipment potentially dangerous.

J. Pedersen, ST/EL PS Power distribution.  Rotating Machine*) –The rotating machine was installed in It has seen 34 years of service, feeding the PS pulsed network. –Starting a new project today ( 2003 ) would allow a replacement to be commissioned in 2006, with the rotating machine arriving at the end of its prospective lifetime. –*) Generating the PS pulse from energy storage.

J. Pedersen, ST/EL Conclusions.  Certain systems of the CERN infrastructure is obsolete and should be renovated or replaced.  Such activities are by nature important. In terms of money, time and complexity; but also to the users.  They should be dealt with as projects, and inserted in a strategy, at least divisional.

J. Pedersen, ST/EL Estimated Cost of Consolidation. –Reactive power compensator:  Around 5 Million Swiss francs ( Based on an existing purchase option and recuperation of existing filter equipment and civil engineering ) –Buried 18 kV cables:  Between 5 and 6 Million Swiss francs. –18 kV switchgear in the BA substations:  Between 12 and 13 Million Swiss francs. –PS rotating machine  Around 6.5 million Swiss francs ( An educated guess )