We really need to check all the results showed. We change the GEM from the fully-well-shielded to the less shielded one (top- bottom-fan out with aluminum)

Slides:



Advertisements
Similar presentations
F. Formenti - ALICE forum 16/03/ Contacted some teams for system GND discussions: cases analyzed are presented here Planned to continue with others.
Advertisements

Status of test beam data analysis … with emphasis on resistive coating studies Progress and questions 1Meeting at CEA Saclay, 25 Jan 2010Jörg Wotschack,
STAR Pixel Detector Phase-1 testing. 22 Testing interrupted LBNL-IPHC 06/ LG Lena Weronika Szelezniak born on May 30, 2009 at 10:04 am weighing.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
Power supply cable Charge injection 3 channels readout (external cables to the scope) 3 channels readout (internal cables) Set up for reading two cards.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
Tests of a 10cm by 10cm triple GEM detector
Chamber PCB s, FEB s, Cooling, HV/LV Distribution 1)PCB designs-track widths, track to track distances … 2) Double sided and Multi layer, modular approach.
Todd Moore for the DES CollaborationApril 20 th, Quick Summary of Noise Test Results. Noise test software & hardware setup. Earth grounding/shielding.
Chamber parameters that we can modify and that affect the rising time Number of ionisation clusters produced in the drift gap: Poisson Distribution Probability.
Timing Jitter and Cross Talk in the SRS + Xray scan of FIT zigzag board Michael Phipps, Bob Azmoun, and Craig Woody 1.
Status of TRD Chamber and Readout Electronics Integration Ken Oyama and Christian Lippmann for the TRD Collaboration Sep. 26, 2005 TRD status meeting in.
TURBO: VFAT CTRL/READOUT BOARD INVOLVED PEOPLE TOTEM(Pisa/Siena group and students), GDD-RD51(Matteo, Gabriele), CMS GEM upgrade group (Andrey, Stefano,
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
Todd Moore for the DES CollaborationNov 28, Noise test hardware & software setup. Earth grounding scheme utilized for noise tests. Block diagram.
1 PreFPIX2 Inner board and test beam triggering Gabriele Chiodini Fermilab - Jan 07, 02.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
And now for something completely different First results from the DC-DC Stavelet Peter & Ashley with Giulio & John.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
1 NA58 RICH Test Beam T10 sept.2014 Fulvio Tessarotto – Stefano Levorato Partecipants: Alessandria, Aveiro, Budapest, Calcutta, Freiburg, Liberec, Prague,
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
Mar. 18, 2009 HAPD ASIC Status Super KEKB Meeting 1 S.Nishida (KEK) S. Nishida HAPD ASIC Status Super KEKB Meeting Mar. 18, 2009 KEK.
24/05/2010Rui De Oliveira1 Resistive protections for Bulk Micromegas Rui de oliveira, Joerg Wotschack Venetios Polychronakos.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
Anatoli Romaniouk TRT Test manual Some important information p. 2-3Some important information p. 2-3 Noise studies p.4-7Noise studies p.4-7 Operation with.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
Saverio MINUTOLIElectronics WG - 09 June AFEC cross-talk Plots illustrating Cross-talk effect AFEC pcb investigation.
Application of Large Scale GEM for Digital Hadron Calorimetry Jae Yu For GEM DHCAL Group June 11, 2011 TIPP 2011 The Goals 30cmx30cm 2D readout with KPiX.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
Front Tracker: main technical solutions 40x50 cm 2 module Front Tracker Chamber: 40x150 cm 2  Use COMPASS approach: 3xGEM, 2D readout - one significant.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Proposal of a digital-analog RPC front-end for synchronous density particle measure for DHCAL application R.Cardarelli and R.Santonico INFN and University.
Status of GEM DHCAL Jae Yu For GEM DHCAL Group April 25, 2012 KILC Workshop, KNU Introduction KPiX V9 and DCAL Integration FTBF Beam Test Setup Beam Test.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
HV Connections for SP HV RETURN Dummy Pad Backplane Connection Do we need to connect the HV and HV return to the “left hand” hybrid? The HV trace serves.
CM correction algorithm. Observations: Looking at the data for one analog link, a large fraction of the 32 strips are affected by the large signal deposit.
Measuring the Position resolution of a COMPASS Drift Chamber Prototype Rojae Wright, Mathias Perdekamp, Ihnjea Choi, Alabama A&M university, University.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
SRS TIMING ANOMALY RD51 Mini-Week June 9, 2015 M. Phipps, BNL 1.
Aras Papadelis. NIKHEF 1 Aras Papadelis B-physics meeting 15/ Results from the Nov2004 VELO test beam (and what followed…)
THE USER “POINT OF VIEW” ABOUT THE VFAT2 The first day.... The first week.... The first month.... The first year... But at the end you will be a friend.
Update of Prototype AT-TPC May 6, 2010 Weekly meeting Daisuke Suzuki, NSCL.
Results with the RPC system of OPERA and perspectives
L. Benussi On Behalf of LNF crew
Calorimeter Mu2e Development electronics Front-end Review
TOTEM Collaboration Meeting June 2007
Quality Control Chamber Production
Present Read Out Chain for the PANDA Barrel DIRC
Entrance Muon Counter (EMC)
Marcin Chrząszcz Cracow University of Technology Itamar Levy
DCH FEE 28 chs DCH prototype FEE &
VFAT hybrid and beam board noise studies
Results from a preliminary analysis of the MWPC test at the GIF
M. Alexeev on behalf of Torino TIGER Test Group
LV Test Napoli feb 05 Noise ripple: EASY - + CRATE LV cable
Status of n-XYTER read-out chain at GSI
GEM-based Digital Hadron Calorimetry for SiD
The Pixel Hybrid Photon Detectors of the LHCb RICH
Overview of T1 detector T1 is composed by 2 arms
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
Pre-installation Tests of the LHCb Muon Chambers
RPC Front End Electronics
DAQ and visualization software
Presentation transcript:

We really need to check all the results showed

We change the GEM from the fully-well-shielded to the less shielded one (top- bottom-fan out with aluminum) We moved from the table to the nitrogen flushed box H.V. Connected to the GEM Sigma Mean Value of two channels…. Just to have an idea of the evolution. Look at the other plots to have a more precise description Independents Analog and Digital Power Supply PRELIMINARY

Dig gnd connected to the earth of its power supply An gnd floating Dig gnd connected to the earth of its power supply An gnd connected to the earth of its power supply Dig gnd connected to the earth of its power supply An gnd connected to the Dig gnd on the power supply Dig gnd floating An gnd floating Dig gnd floating An gnd floating Dig gnd floating and An gnd floating but connected together Dig gnd floating An gnd floating Dig gnd floating - An gnd connected to the test beam gnd We change the GEM from the fully-well-shielded to the less shielded one (top- bottom-fan out with aluminum) We moved from the table to the nitrogen flushed box H.V. Connected to the GEM Dig gnd floating An gnd floating H.V. OFF H.V. -100V H.V. -100V + CAEN Filter Dig gnd floating An gnd floating Dig gnd floating An gnd connected to the gnd of the test beam zone through the H.V. filter fixed on the table PRELIMINARY

We change the GEM from the fully-well-shielded to the less shielded one (top- bottom-fan out with aluminum) We moved from the table to the nitrogen flushed box H.V. Connected to the GEM We start to see differences between the two VFATs plugged on pads ps1 and ps2 connecting the H.V. When we connect the analog gnd to the test beam gnd through the box of the H.V. filter fixed on the table, this difference disappear and the sigma come back to the best value (I.e. as with the fully shielded chamber, without the H.V. plugged and on the table). If you look at the threshold scan instead it’s seems better without this connection of the analog gnd with the test beam gnd PRELIMINARY

WITH THE NEW POWERING SCHEME:ANALOG AND DIGITAL SEPARATED -The An gnd have to be referenced to a good gnd otherwise: -Latency problems (inefficiency, worse sigma) -If the dig gnd is directly linked to the An gnd it’s seems that we have more cross talking effect. (when we are in test beam zone we have the problem of the trigger line that in any case link digital and analog gnd if the analog is referred to the test beam zone gnd). -If we leave the analog gnd floating, without any connection with the digital part we don’t see cross talking (but the results from the threshold scan that we use to see this cross talking are in some way crazy!) PRELIMINARY

Latency scan with the analog gnd floating (Vcal 200, Th 50, MSPL 1clk) PRELIMINARY

Latency scan with the analog gnd referenced (Vcal 230, Th 40, MSPL 2clk) PRELIMINARY

Averaged Noise Occupancy per channel PRELIMINARY

We tried with/without this connection Top Gnd Studies: the more clean situation PRELIMINARY

This MSPL noise dependence tested on: –Separated Digital/Analog power supply: Only one gnd ref: trigger gnd from Counting Room Another gnd ref in Test Beam Zone (directly connected on the GEM gnd plane ) –Common Power Supply for Analog/Digital through Transition Board (Gnd only from Trigger line) VFATs without/with gnd connection on the Hybrids (*) (*) under study….we start just now the tests with the hybrids with this connection, it’s seems that we have the same effect, but we have to investigate its magnitude. PRELIMINARY

Th=100 Th=60 With power from TB Analog Digital together Measurements with the an/dig power supply directly from TB: It seems better….. PRELIMINARY

Th=90 Th=110 Th=130 Th=150 Th=160 Int Strips Particles..?.. 3.6kV on the GEM With power from TB Analog Digital together If strips are at high threshold no signal on pads! This is not possible! PRELIMINARY

C~20pF Noise~400e - +40/60 e - /pF COMPASS Noise~400e -  ~1 bin ~1600e -  ~4 bin PRELIMINARY

Noise~400e - +40/60 e - /pF  ~1bin+1.5bin/pF Noise~400e -  ~1 bin VFAT alone ~1600e -  ~4 bin Between 5.5 & 7 Between 5 & 6 Between 3 & 5 INTERNAL STRIPS EXTERNAL STRIPS PADS  ~7bin -> ~40pF PRELIMINARY

VFAT PRELIMINARY

Possible tests for the signal/noise We will try to use a chip without protection If it is possible we can try to inject charge directly on the readout board (strips/pads). Come back in the Nov06 test beam setup. PRELIMINARY