Status report on CJK NGN Working Group April 9, 2007 7 th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.

Slides:



Advertisements
Similar presentations
INTERNATIONAL TELECOMMUNICATION UNION Document 27 – E TELECOMMUNICATION STANDARDIZATION SECTOR TSB Directors Consultation Meeting on IPTV standardization.
Advertisements

Vientiane, Lao Peoples Democratic Republic, July 2012 Standardization for disasters Takashi Egawa, Vice chair of FG-disaster NEC Corporation
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All NGN interoperability - TTC activities in ITU-T - Kaoru Kenyoshi TTC as the PPSO of interoperability.
DOCUMENT #:GSC15-CL-04 FOR:Presentation SOURCE:CCSA AGENDA ITEM:Closing Plenary, 2.3 GTSC-8 Summary Report Duo Liu GTSC-8.
REVIEW OF THE RCA AGREEMENT 2013 RCARO Workshop on Strengthening the RCA/RCARO Activities and its Efficiency, 7-9 August 2013, Seoul, South Korea Alumanda.
Proposal for work procedure of CJK editing team 6 March 2006 TTC For information.
Overview of the 11 th CJK IT Standards Meeting (CJK-11) ARIB, TTC 1 M2M Meeting of Potential Consolidation Partners # March 2012 in Tokyo, Japan.
JEM for 3GPP2 Vision, San Diego, July 12-13, Long-term All IP Conference and IP 2 Ad-Hoc group ARIB/TTC IP 2 Ad-hoc Group Joint Experts Meeting for.
The 11th CJK NGN-WG Meeting 1 11 th CJK NGN-WG (CJK NGN Test-bed Activity Report) CJK NGN Test-bed Ad-hoc Group.
CJK9, Zhangjiajie, China 1/14 Discussion: [Drafted] 3GPPs works in CJK Cooperation CJK 9, Zhangjiajie, China April 8-10,2009 Changho RYOO
GSC-8090 SOURCE:TTA TITLE:IMT-2000 & Beyond IMT-2000 in Korea AGENDA ITEM:GTSC/GRSC Joint Plenary /04/2003GSC-8, OTTAWASlide 1 IMT-2000 and Beyond.
The 6th CJK NGN Working Group Meeting April 10 ~ 12, 2006, Hangzhou, China CJK NGN WG (IP-TV Ad-Hoc Group) Chae Sub Lee
1 Status Report on CJK NGN Working Group China Communications Standards Association 9 th CJK meeting April 2009 HeyuanXu, Chairman of NGN-WG.
The 6th CJK NGN Working Group Meeting April 10 ~ 12, 2006, Hangzhou, China CJK NGN Test-bed Proposal by TTA Taesang Choi
Report of the oneM2M Legal Subcommittee Group Name: oneM2M Steering Committee Source: Thomas Goode, ATIS, Meeting Date:
Jeju, 13 – 16 May 2013Standards for Shared ICT Activity of TTC interoperability Yasubumi Chimura Hideo Himeno TTC Interoperability-AG Document No: GSC17-PLEN-06.
CJK Standards Collaboration - Brief overview of CJK NID WG HyoungJun Kim Telecommunications Technology Association.
Workshop on Rights Information Interoperability (RII) (Geneva, Switzerland, ) Collaboration story on RII between ITU-T SG 16 and IEC TC 100 Tadashi.
Summary of 4 th Informal Group on WLTP 14 January 2010 Palais des Nations, Geneva Informal document No. GRPE (59th GRPE, January 2010, agenda.
The 6th CJK IT Standards Meeting April 10 ~ 12, 2006, Hangzhou, China CJK IT Standards Meeting (Collaboration of Security Activity between CJK On NGN and.
Tatsuji JAPAN CJK-SITE China, Japan, Korea Standards cooperation on IT and Electronics.
International Telecommunication Union Results of the first FGFN meeting in Lulea Naotaka MORITA Chairman of FGFN 14 July 2009.
OneM2M Partnership Project. Contents Introduction Founding Partners Participation Scope & Objectives Structure Deliverables Contacts © 2013 oneM2M Partners.
Recent Results of JCA-NID and TSAG Byoung Nam LEE HyoungJun KIM ETRI, Korea.
CJK B3G Standards Collaboration Jinsung Choi Ph.D TTA PG301 Chair & Vice-President of LGE, Mobile Communication Technology Research Lab. Telecommunications.
The 16th CJK NGN-WG Meeting July 22 ~ 24, 2009, Beijing, China 16 th CJK NGN-WG (Standardization on DSN and Future Direction ) Shin-Gak Kang
Fostering worldwide interoperabilityGeneva, July 2009 Report on CJK Joint Survey on Fora/Consortia CJK Global Standards Collaboration (GSC) 14 DOCUMENT.
DOCUMENT #:GSC15-PLEN-79 FOR:Presentation SOURCE:TTC AGENDA ITEM: GSC Plenary 6.10 GTSC 4.1 NGN interoperability -
The 5th CJK NGN Working Group Meeting March 28~29, 2005, Tokyo, Japan Internet Telephony in KOREA Hyub, CHOI TTA
The 7th CJK NGN Working Group Meeting October 10 ~ 11, Tokyo, Japan CJK NGN Test-bed Activity Status Report Taesang Choi
History and Summary of N-ID Activities in ITU-T Yong-Woon KIM HyoungJun KIM ETRI, Korea.
Jeju, 13 – 16 May 2013Standards for Shared ICT CJK activities on WPT Standardization Mr. YJ CHUNG (TTA) on behalf of CJK-WPT WG* Document No: GSC17-PLEN-24.
The 7th CJK NGN Working Group Meeting October 10 ~ 11, 2006, Tokyo, Japan Performance Objectives for performance testing on CJK NGN testbed Hyungsoo Kim.
Jeju, 13 – 16 May 2013Standards for Shared ICT GSC Emergency Communications Task Force Report (GSC-EM TF) Presenter: Chantal Bonardi GSC-EM Task Force.
Working Structure and methods for CJK N-iDs Working Group Chae Sub TTA, Korea.
Evaluation Scenarios of the CJK NGN Test-bed
GSC-16 Closing Plenary Summary Report
14th CJK NGN-WG (Status of New SG 13) Chae Sub Lee
CJK NGN test-bed study Phase Ⅲ&Ⅳ
Proposal for study scope of CJK IPTV-adhoc group
Status report on CJK NGN Working Group
8th CJK Plenary NGN Workshop for further collaboration March, 2008
CJK NGN test-bed study Phase III&IV
Report of 19th UNIOT-WG Meeting
20th CJK UNIOT-WG (Standardization of Mobile IPTV in ITU-T)
Kangchan lee 20th CJK UNIOT-WG (Current Status of Cloud Computing Standardization Acuities in ITU-T) - Update of CJK-UNIOT Kangchan.
FG-FN results and future steps
TTC Activities on IPR in Standards
Status report on CJK NGN Working Group
Proposal for the CJK NGN Test-bed Activity
CJK 10th NGN-WG (Follow up IPTV-GSI) Chae Sub, Lee
CJK NGN WG (Proposal for drafting group on IPTV Standards)
GSC Emergency Communications Task Force Report (GSC-EM TF)
Taesang Choi CJK Testbed Collaboration for NGN Taesang Choi
Global Collaboration on Future Network Standardization
Standardization Activities in TTC
Global Collaboration on Future Network Standardization
Global Collaboration on Future Network Standardization
GSC-16 Closing Plenary Summary Report
Informal document GRPE-78-23
Charles KIM TTA Collaboration Plan for CJK NGN Charles KIM TTA
Background During last GRPE meeting, EU, Japan and Korea requested the creation of an RDE IWG The GRPE accepted the proposal during its June 2018 meeting.
Standardization Activities in TTC
Roles and Functions of CJK NGN WG for NGN Standardization Chae-Sub LEE
CJK activities on WPT Standardization
Experiences and Considerations for BSG
ITU-T Focus Group Next Generation Network
The CJK IT Standards Meeting July 5~7, 2004, Seoul, Korea
Standardization activities on IPTV in Korea
Presentation transcript:

Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group

8th CJK NGN Working Group Meeting 2 Objectives and Tasks of NGN-WG Objectives –Cooperation among CJK to promote and reflect the studies on NGN requirements and solutions to the relevant International NGN standardization activities Tasks –Collect and exchange industry/standard information on NGN- related activities of each country, –Identify key standard areas to provide end-to-end multimedia services over future NGN, –Pursue maximum commonality of NGN-related standards, –Confirm interconnectivity and interoperability of NGN through interoperability tests among interested parties Phased approach will be taken from the top to the bottom of above items.

8th CJK NGN Working Group Meeting 3 Working method; Two level meetings Working group meeting –High level standard direction and selected major technical issues are discussed to promote the CJK collaboration –The meeting is expected to be held as much as possible in conjunction with the CJK meeting. Additional WG meetings can be held with permission by the CJK plenary –The progress report will be made at the CJK plenary Ad hoc meeting by technical experts –Key specific technical issues are discussed among technical experts who participate in the relevant ITU-T meeting –The meeting is held in the previous day of each NGN-related ITU-T meeting to share the standards views among the CJK members to lead the discussion –Also meet in the middle of each ITU-T NGN-GSI meeting if necessary to resolve any critical issues among CJK

8th CJK NGN Working Group Meeting 4 NGN-WG Management structure Chairman: Mr. Taesang CHOI (TTA, Korea) Vice Chairman: Mr. Naotaka MORITA (TTC, Japan) Vice Chairman: Ms. Duo LIU (CCSA, China) Duration; One-year term (July 2006 – June 2007) Chairman Vice-Chairmen NGN-WG meetingAd hoc meeting Task group

8th CJK NGN Working Group Meeting 5 Meeting history WG meetings –1st CJK NGN WG Meeting (6 July 2004, Seoul, Korea) hosted by TTA (Plenary) –2nd CJK NGN WG Meeting (11-12 November 2004, Tokyo, Japan) hosted by ARIB/TTC –3rd CJK NGN WG Meeting (28-29 March 2005, Tokyo, Japan) hosted by ARIB/TTC (Plenary) –4th CJK NGN Working Group Meeting(24 June 2005, Beijing, China) hosted by CCSA –5th CJK NGN Working Group Meeting(15-16 Dec 2005, Seoul, Korea) hosted by TTA –6th CJK NGN Working Group Meeting(10-11 April 2006, Hang Zhou, China) hosted by CCSA (Plenary) –7th CJK NGN Working Group Meeting(10-11 October 2006, Tokyo,Japan) hosted by TTC –8th CJK NGN Working Group Meeting(5-6 Feb 2007, Jeju, Korea) hosted by TTA Ad hoc meetings –16 Jul 2006 at Geneva for ITU-T NGN-GSI meeting –21 October 2006 at Geneva for ITU-T NGN-GSI meeting –7 January 2007 at Beijing for ITU-T NGN-GSI meeting

8th CJK NGN Working Group Meeting 6 Key achievement of NGN-WG Agreement on the objectives of NGN-WG Agreement on the key tasks of NGN-WG Agreement on the organizational procedure of NGN-WG such as working method, rules for participants and contributions, guidelines of meeting host and publication Agreement on the setup of a new task group on NGN-Testbed and Phase 1 testing is completed Agreement on the setup of IPTV ad-hoc group and collaboration for co- authoring relevant contributions to FG IPTV meetings Agreement on CJK-NGN Ad-hoc meetings held before the ITU-T NGN-GSI meetings and Review of CJK contributions to NGN-GSI meetings and collaboration activities to support critical ones Agreement on collaboration for NGN Release 2 activities such as NGN R2 Requirements, Multicast, Mobility issues for NGN R2

8th CJK NGN Working Group Meeting 7 Major topics NGN Release 1 Issues –NGN R1 Requirements –NGN R1 Architecture –NGN R1 Resource Admission Control Functions –NGN R1 Performance Monitoring for NGN NGN Release 2 Issues –NGN R2 Requirements –NGN Mobility –NGN Multicast –Home Networking IPTV Issues –CJK Harmonization on IPTV issues (e.g., Multicast, etc.) –FG IPTV activity Coordination CJK Test-bed Issue –Phase I: rd /4 th Quarter Network Connectivity Scenarios 2 and 4 only First Report/Demo during 9 th CJK NGN Meeting (April 2007) –Phase II: st /2 nd Quarter Scenarios 1 and 3 Second Report/Demo during 10 th CJK NGN Meeting (September or October 2007) –Phase III: rd /4 th ~ st /2 nd Quarter Scenario 5 ~ 7 Testing details will further be defined depending on the technology availability status Third Report/Demo 11 th CJK NGN Meeting

8th CJK NGN Working Group Meeting 8 NGN standard activities were initiated by Europeans But it was not enough to make global notification CJK involved in this area since the 1st JRG-NGN meeting at Munich, October 2003 After joining CJK in ITU-T based activities including various Workshops, NGN standards became global issue Especially FG NGN group was launched at June 2004 based on the agreements which made at Beijing April 2004 among ITU-T Europe, North America and Asian Key members Since the launching of FG NGN, CJK members have become most important members with enormous contributions Recently CJK played a critical role to launch FG IPTV and is actively leading and contributing the activity In summary, CJK now has a key leading role for the global NGN standards CJK contribution to NGN Global Standards

8th CJK NGN Working Group Meeting 9 NGN Test-bed Task group in NGN-WG Key objectives of NGN-testbed - Building a common NGN technology testing infrastructure - Feasibility testing prior to NGN commercial deployment - Interoperability testing for NGN components - Providing NGN service development platform for inter- country issues - Cooperation with other international NGN related testbeds The CJK meeting endorsed on the launch of the NGN-testbed task group and high-level support for the testbed project Dr. Taesang Choi (TTA) was nominated to the NGN-testbed task leader Test-bed networks between Korea and China was first established in October 2006 The first test to be performed is VoIP & MoIP over Call Server networks Phase I test was successfully completed in March 2007 between Korea (ETRI) and China(CATR) Phase II & III activities will be continued

8th CJK NGN Working Group Meeting 10 Future meeting plan Ad hoc meeting at ITU-T NGN-GSI on Sunday, April 15 in Geneva 10th NGN-WG meeting, Venue is TBD 11 th NGN-WG meeting, Venue is TBD NGN-WG requests the CJK meeting to endorse the following meetings as the NGN-WG activities.

8th CJK NGN Working Group Meeting 11 Conclusions NGN-WG agreed the objectives, the tasks and the organizational procedure of the WG CJK-NGN members contribute to the NGN global standards activities in the NGN-GSI, SG11, and SG13 meetings and play a key role of the standards activities NGN-WG agreed to setup a new ad-hoc group on IPTV in NGN- WG and request strong support from the CJK members NGN-WG proposed future Ad hoc meeting and NGN-WG meeting plans before the next CJK meeting in 2008

Thank you for your attention