Alpine Technical Delegates Update INTERNATIONAL SKI FEDERATION Timing & Data Technical Report Form Version 7.1
Alpine Technical Delegates Update Timing & Data Technical Report
Alpine Technical Delegates Update Codex or Race Code Event Gender CODEX Note the “check boxes”
Alpine Technical Delegates Update Race Site and State Nation Event Name Date (dd/mm/yy) Location
Alpine Technical Delegates Update Equipment Sys Timer A Sys Timer B Start Gate Finish Cell A Finish Cell B Brand Name Model or Type Serial Number Homologation #
Alpine Technical Delegates Update Equipment Timers Brand Model Serial No. Homol. # TAG HEUER PTB TAG
Alpine Technical Delegates Update Equipment Start Gate Brand Model Serial No. Homol. # TAG HEUER HL TAG.S54.03
Alpine Technical Delegates Update Equipment Photo Cells Brand Model Serial No. Homol. # TAG HEUER HL TAG.S54.03
Alpine Technical Delegates Update Software Software & Results Preparation Brand Version Date Results= Tapes Split Second National/FIS Rev. 1- 3/08 Confirmed
Alpine Technical Delegates Update Connections How do we communicate signals/data from Start to Finish? How is voice communication handled between Start and Finish? Cable Radio Snowmobile Ski Lift Skier ??
Alpine Technical Delegates Update Warm-up and Synchronization At what time is the run scheduled to start? --Is there a rule about Synchronization? --What is the minimum recommended warm up time? Is there a Maximum?
Alpine Technical Delegates Update Synchronization and Synch + 1 Minute Are Systems A and B synchronized? –How close are they? What is the maximum difference acceptable? –So what? What about Hand Times? –So what?