Radioactive Magnet Facility B /09/2014 TE-MSC-LMF Luis Mora Vallejo Rosario Principe TE-MSC Technical meeting, 4 th September 2014
Magnets to repair LS1 10 dipoles (RP declassified) , b dipoles (RP declassified) , b.181 presse Q7 (*never in the tunnel) end 2014, b.181 LS dipoles foreseen (minimum) Q7 replacement LS Upgrade dipoles Upgrade triplets TE-MSC Technical meeting, 4 th September 2014
Spare magnets TE-MSC Technical meeting, 4 th September 2014 Triplets 8 installed 1 spare Dipole D1 4 installed 2 spare Dipoles 41 spare (when all repaired) Quadrupoles 18 spare (when all repaired) Highly activated LS2 arc magnets activation level expected: similar to LS1, could be declassified Non- radioactive Slightly radioactive Radioactive Highly radioactive Dose rate at 10 cm 0.1 Sv/h 10 Sv/h 100 Sv/h> 100 Sv/h Classification of radioactive materials according to Safety Code F 1996, Table 5
Triplets Best Practices for ALARA. C. Adorisio and S. Roesler. on behalf of DGS-RP TE-MSC Technical meeting, 4 th September 2014
B.181 TE-MSC Technical meeting, 4 th September 2014
Present layout
Present layout (areas) SalèveJura TE-VSC-IVM NEG coating TE-MSC-LMF Vertical Assembly Bench TE-MSC-LMF SC magnet tooling TE-MSC-MNC MedAustron TE-MSC-MNC 181/R-Y22 - PS TE-MSC-SCD Cable Supra BE-RF-LRF LINAC 4 Controlled -- Simple Area Controlled -- Limited Stay Area TE-MSC Technical meeting, 4 th September 2014
RMF Project Layout TE-MSC Technical meeting, 4 th September 2014
NC Magnets VAB RMF Project Layout RMF SC Magnets TE- VSC Vestiaires + offices Controlled Radiation Area Free Area/Controlled Radiation Area TE-MSC Technical meeting, 4 th September 2014
ACCESS TE-MSC Technical meeting, 4th September 2014
Operating modes Zone123 No work on magnets FreeControlled MQ (non-activated) Free Controlled MQ (activated) Controlled TE-MSC Technical meeting, 4 th September 2014
Operating modes TE-MSC Technical meeting, 4 th September 2014
Shielding 40 cm thick 80 cm thick μSv/h at 40cm for the hottest magnets to be treated TE-MSC Technical meeting, 4 th September 2014
Changing rooms + offices -Male changing room -Female changing room -Toilets -Offices (2 nd floor) TE-MSC Technical meeting, 4 th September 2014
Two scenarios: 1. RMF complete installation 2. RMF installation in 2 phases (in case of emergency): i.Shielding and access (fast installation and required by RP): ii.Adapt the building, offices, HVAC, … Project schedule and cost Cost [k CHF] RP equipment60 Shielding60 Access30 HVAC dedicated30 Alea10% TOTAL200 TE-MSC Technical meeting, 4 th September 2014 Cost [k CHF] Civil Engineering work500 * TE estimation HVAC (complete)450 Access (complete)50 Alea10% TOTAL1100 Cost [k CHF] RP60 Shielding60 HVAC and Services480 Access80 Civil Engineering work500 * TE estimation Alea10% TOTAL1300
Thank you very much TE-MSC Technical meeting, 4 th September 2014
Spare slides -- Cost (detailed) ACCESSUnitsPrice [k CHF]Total Price [k CHF] Camera2?? Card reader5-6?? Door3?? Interlock system1?? Revolving door115 TOTAL 80 RP equipmentUnitsPrice [k CHF]Total Price [k CHF] GRAMS detector Hand-foot detector117 Operational dosimeter reader199 Mobile detectors21.53 Wash basinEspecial tank188 Scanner + PC122 TOTAL SHIELDINGUnitsPrice [k CHF]Total Price [k CHF] Block (80 cm x 80cm x 40cm) Procurement110 Transport and installation1 10 TOTAL 60 SERVICESPrice [k CHF] HVAC > 295 Other fluids 10 Sanitary 115 Electricity 25 Other35 TOTAL 480 TE-MSC Technical meeting, 4 th September 2014
Spare slides -- HVAC TE-MSC Technical meeting, 4 th September 2014