Radioactive Magnet Facility B.181 04/09/2014 TE-MSC-LMF Luis Mora Vallejo Rosario Principe TE-MSC Technical meeting, 4 th September 2014.

Slides:



Advertisements
Similar presentations
Sc Magnet test facility Consolidation Project presentation M. Bajko for the TEMB on behalf of the MSC TF section team 31. Aug
Advertisements

Booster Main Bending Magnet Test in SM18. Why The energy upgrade of the PS Booster main bending magnet requires endurance tests at high current (≈12 kA)
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
Luisa Ulrici and Luca Bruno, on behalf of DGS/RP
WP 13 : Beam Diagnostics Conceptual Specifications Rhodri Jones (BE/BI)
IEFC Workshop February 2010 H. Vincke for DGS/RP 1.
Studies of radiation hardness of ECAL modules 1Yu. Guz 2013/05/28.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
SESAME PSS Phase I : Microtron + Booster Morteza Mansouri SESAME PSS engineer on behalf of Safety group TAC Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012.
REPORT VISIT SAPHYMO Dorothea Pfeiffer GIF++ Project Meeting
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
Status of handling studies for PSB-LIU Caterina Bertone EN-HE LIU-PSB 17/09/2015 Courtesy: A. Newborough EDMS
TEST BEAM 2007 Dates, Facilities, Safety Cinzia Some key slides from Beniamino Di Girolamo CERN.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
MG - IEFC meeting 22/01/20101 Linac 3 shielding S. Gilardoni, M. Giovannozzi, S. Baird, R. Brown, S. Damjanovic, T. Otto, M. Widorski, Acknowledgements:
Francois BUTIN CERN EN/MEF.  Future of AD is clearer and deserves investment  New AEGIS experiment being prepared, requires new control room  Existing.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Building 867 Project TE/MPE workshop status and schedule Presented by Tony Fowler, TE-ABT on behalf of the Project Team 28/09/2010Building 867 Project:
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Radiation Protection info update C. Adorisio (DGS/RP) 17 th LTEX Meeting
2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS.
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
HL-LHC Standards and Best Practices Workshop CERN, June 13, 2014 Best Practices for ALARA C. Adorisio and S. Roesler on behalf of DGS-RP.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Extraction and beamline progress B.Goddard TE/ABT.
The integration of 420 m detectors into the LHC
Status of n_TOF Facility
R ADIATION P ROTECTION ASPECTS LSS1 - TAN REGION Cristina Adorisio (CERN - DGS/RP)
R ADIATION P ROTECTION ASPECTS LSS1 LHC f RE - INSTALLATION Cristina Adorisio (CERN - DGS/RP) LTEX Meeting – May 10 th, 2012.
Radiation Protection computing tools Gérald Dumont HSE/RP.
SPSU – May 19, 2009 – Resources needed for SPS coating project– J. Bauche 1 Coating of the SPS Main Dipoles Vacuum Chambers: Resources Needed for Project.
Status of GIF++ Adrian Fabich, Dorothea Pfeiffer, EN-MEF-LE EATM, 27th August 2013.
Layout and conventional facility N.Terunuma KEK. Conventional facility 1 Layout of beam line should be fixed until end of June We have to start.
1. 2 PX ‘material’ shaft LHCb workshop Visitor area Control room SG8 Gas building Meeting room and offices Storage Access to UX.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
Warm Magnets - LS1 Feedback J. Bauche, on behalf of the TE-MSC-MNC Team.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
Repair of MCWV magnets (TT84 – M2). Works on three magnets : MCWV 693, MCWV 697, and MCWV 701 and the associated XABS Cause of the repair : XABS jam into.
Upgrade of SMI2 workshop 06/11/2014 TE-MSC-CMI/LMF Luis Mora Vallejo Andrea Musso TE-MSC Technical Meeting, 6 th November 2014.
Magnet activities in SPS during EYETS
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Safety and Prevention of Typical Fire Plan
Test beam check list Michael JECKEL EN-EA-EC.
TE-MSC activities in SPS during LS2
Francois and Lau EATM 17 July 2012
Long Shutdown for the LHC: Vacuum Beam Pipes
Radiation protection of Linac4 M. Silari Radiation Protection Group
Julie Coupard Schedule and Coordination
EN-HE SPS works during EYETS
Accelerator and Experiment Interface Session: LS2, LS3
SPS Planning for the EYETS Meeting 9 (14/12/2016)
SPS activities during LS2 TE-EPC (Power Converter Group)
TE-MSC activities in SPS during YETS
LS2 session J.M Jimenez, J.-P. Tock, K. Foraz 24/11/2017
UK RFD Pre-Series cryomodule
Proposal for the modification of building 151 in view of the LS2 PS main magnet and TT2 consolidaiton projects Dominique Bodart TE-MSC-MNC 29/09/2017.
HIE-ISOLDE Project Status Report
Extraction Michael Bevins May 17, 2007
Review Bloc 4 and SM18 facilities and upgrade
Presentation transcript:

Radioactive Magnet Facility B /09/2014 TE-MSC-LMF Luis Mora Vallejo Rosario Principe TE-MSC Technical meeting, 4 th September 2014

Magnets to repair LS1 10 dipoles (RP declassified)  , b dipoles (RP declassified)  , b.181 presse Q7 (*never in the tunnel)  end 2014, b.181 LS dipoles foreseen (minimum) Q7 replacement LS Upgrade dipoles Upgrade triplets TE-MSC Technical meeting, 4 th September 2014

Spare magnets TE-MSC Technical meeting, 4 th September 2014 Triplets 8 installed 1 spare Dipole D1 4 installed 2 spare Dipoles 41 spare (when all repaired) Quadrupoles 18 spare (when all repaired) Highly activated LS2 arc magnets activation level expected: similar to LS1, could be declassified Non- radioactive Slightly radioactive Radioactive Highly radioactive Dose rate at 10 cm  0.1 Sv/h 10 Sv/h 100 Sv/h> 100 Sv/h Classification of radioactive materials according to Safety Code F 1996, Table 5

Triplets Best Practices for ALARA. C. Adorisio and S. Roesler. on behalf of DGS-RP TE-MSC Technical meeting, 4 th September 2014

B.181 TE-MSC Technical meeting, 4 th September 2014

Present layout

Present layout (areas) SalèveJura TE-VSC-IVM NEG coating TE-MSC-LMF Vertical Assembly Bench TE-MSC-LMF SC magnet tooling TE-MSC-MNC MedAustron TE-MSC-MNC 181/R-Y22 - PS TE-MSC-SCD Cable Supra BE-RF-LRF LINAC 4 Controlled -- Simple Area Controlled -- Limited Stay Area TE-MSC Technical meeting, 4 th September 2014

RMF Project Layout TE-MSC Technical meeting, 4 th September 2014

NC Magnets VAB RMF Project Layout RMF SC Magnets TE- VSC Vestiaires + offices Controlled Radiation Area Free Area/Controlled Radiation Area TE-MSC Technical meeting, 4 th September 2014

ACCESS TE-MSC Technical meeting, 4th September 2014

Operating modes Zone123 No work on magnets FreeControlled MQ (non-activated) Free Controlled MQ (activated) Controlled TE-MSC Technical meeting, 4 th September 2014

Operating modes TE-MSC Technical meeting, 4 th September 2014

Shielding 40 cm thick 80 cm thick μSv/h at 40cm for the hottest magnets to be treated TE-MSC Technical meeting, 4 th September 2014

Changing rooms + offices -Male changing room -Female changing room -Toilets -Offices (2 nd floor) TE-MSC Technical meeting, 4 th September 2014

Two scenarios: 1. RMF complete installation 2. RMF installation in 2 phases (in case of emergency): i.Shielding and access (fast installation and required by RP): ii.Adapt the building, offices, HVAC, … Project schedule and cost Cost [k CHF] RP equipment60 Shielding60 Access30 HVAC dedicated30 Alea10% TOTAL200 TE-MSC Technical meeting, 4 th September 2014 Cost [k CHF] Civil Engineering work500 * TE estimation HVAC (complete)450 Access (complete)50 Alea10% TOTAL1100 Cost [k CHF] RP60 Shielding60 HVAC and Services480 Access80 Civil Engineering work500 * TE estimation Alea10% TOTAL1300

Thank you very much TE-MSC Technical meeting, 4 th September 2014

Spare slides -- Cost (detailed) ACCESSUnitsPrice [k CHF]Total Price [k CHF] Camera2?? Card reader5-6?? Door3?? Interlock system1?? Revolving door115 TOTAL 80 RP equipmentUnitsPrice [k CHF]Total Price [k CHF] GRAMS detector Hand-foot detector117 Operational dosimeter reader199 Mobile detectors21.53 Wash basinEspecial tank188 Scanner + PC122 TOTAL SHIELDINGUnitsPrice [k CHF]Total Price [k CHF] Block (80 cm x 80cm x 40cm) Procurement110 Transport and installation1 10 TOTAL 60 SERVICESPrice [k CHF] HVAC > 295 Other fluids 10 Sanitary 115 Electricity 25 Other35 TOTAL 480 TE-MSC Technical meeting, 4 th September 2014

Spare slides -- HVAC TE-MSC Technical meeting, 4 th September 2014