11.12.2003AB-CO TC / J. Wenninger1 MCB orbit correctors  There are 752 MCBH(V) SSS orbit corrector circuits.  Individually powered by a ± 60 A, ± 8 V.

Slides:



Advertisements
Similar presentations
AP Electricity Quiz Review
Advertisements

Multi-Turn Extraction / L.Ducimetière / Kicker options for MTE Prepared by L.Ducimetière, L.Sermeus Outline: Reminder : Present MTE dedicated.
CLIC Workshop 2009 Power Converters implications for CLIC machine protection 25/05/2015TE-EPC / S. Pittet1.
Background Early 2000 Decision for Continued Campus Service Approval for Campus Funding Slow Alternative Service Materialization within Davis.
Chamonix 03 / Presentation 5.5 / J. Wenninger1 Orbit control for machine operation and protection Orbit control requirements Feedback performance.
TS-LEA, CERN, 1211 Geneva 23 1 T. Wijnands TS/LEA, C. Pignard AB-CORADWG-RADMON day – 1 December 2004 LHC Power Converters & Radiation T. Wijnands TS/LEA.
22/12/2014.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
RC, RLC circuit and Magnetic field RC Charge relaxation RLC Oscillation Helmholtz coils.
Chapter 32 Inductance. Joseph Henry 1797 – 1878 American physicist First director of the Smithsonian Improved design of electromagnet Constructed one.
Chapter 32 Inductance. Self-inductance  A time-varying current in a circuit produces an induced emf opposing the emf that initially set up the time-varying.
Electricity and Electrical Circuits Part 1 - Introduction
Powering the main linac implications Daniel Siemaszko, Serge Pittet OUTLINE : Cost impact of power converters, power consumption and powering.
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Capacitors II Charging and Discharging. Current The current through a capacitor is given by i C = C(dV C /dt) Capacitors are normally charged or discharged.
Exam review Inductors, EM oscillations
Chapter 14 Inductive Transients. 2 Transients Voltages and currents during a transitional interval –Referred to as transient behavior of the circuit Capacitive.
1 LBDS Testing Before Operation Jan Uythoven (AB/BT) Based on the work of many people in the KSL, EC and TL sections.
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
Chapter 32 Inductance. Joseph Henry 1797 – 1878 American physicist First director of the Smithsonian Improved design of electromagnet Constructed one.
Chapter 32 Inductance. Self-inductance Some terminology first: Use emf and current when they are caused by batteries or other sources Use induced emf.
CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 1 Incident September 19 th Architecture of powering and protection systems for high field.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson Technical Board June 23,
Reliability and availability considerations for CLIC modulators Daniel Siemaszko OUTLINE : Give a specification on the availability of the powering.
For more info:
1 CC & MP - CC10 - CERN Crab LHC J. Wenninger CERN Beams Department for the LHC Machine Protection Panel.
Electricity and Magnetism Review 2: Units 7-11 Mechanics Review 2, Slide 1.
April 26 th, 2006 AC Circuits PHYS 102 Where T is the period of oscillation.
Status of ITER collaboration for Machine Protection I. Romera On behalf of the colleagues who contribute to the project Thanks to: Sigrid, Markus, Rüdiger,
H. Prin Review of the present situation 1/2 Cold mass design: No significant improvement since Alexandre is finishing the work on the twin.
Electricity Notes 5 Electric Power – the rate at which _______________________ the rate at which _____________________ is converted into another form of.
Lesson 12 Inductors Transient Analysis
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
30th March 2007A.Fabich, CERN AB-ATB1 MERIT - Status of the Experiment A. Fabich CERN AB-ATB MERIT safety review (3)
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
Eric Prebys/LARP 2/17/2016.  CERN has taken unprecedented steps to control information about this event, including altering the electronic LHC log to.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Review of Sector th of February Tunnel Access During Powering Tests Hugues Thiesen, AB-PO.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
S1S1 S2S2 R1R1 R1R1 R1R1 R2R2 ΔV = 120 V R 1 = 20 Ω R 2 = 10 Ω A Find the current at point A for all possible combinations of switch settings. (In each.
Beam abort in KEKB and Background measurement by SVD 8 Feb T. Tsuboyama (KEK)
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
POPS-B Project Update 07 June 2016 POPS-B: Project update and Feedback from POPS Experience LIU-PSB Meeting June 2016 Fulvio Boattini TE/EPC 2.
Lesson 13: Inductor Transient Analysis
Powering LHC magnets version 30/3/2007.
Minimum Hardware Commissioning – Disclaimer
The HL-LHC Circuits: Global View and Open Questions
A. Rossi on behalf of the whole team:
And more practical uses of electricity
Powering the LHC Magnets
Update on circuit protection simulations of the HL-LHC Inner Triplet circuit Matthias Mentink, Circuit specifics + STEAM simulations: Samer Yammine, LEDET.
Powering from short circuit tests up to nominal
Real-time orbit the LHC
Circuits and Circuit Elements
Electrical Glitch 06:02 Electrical glitch is seen on all circuits connected to the 18kV (RD1.LR1, RD1.LR5, RD34.LR3, RD34.LR7)
Interlocking of CNGS (and other high intensity beams) at the SPS
Thursday morning 09:30 Dump of pPb fill.
ELECTRICITY & MAGNETISM Electric Current (P )
Saturday 4.12 Beam in the SPS at 09:30 Beam in the LHC at 10:00
Orbit Feedback / Chamonix 03 / J. Wenninger
Machine Tolerances in Cleaning Insertions
Circuits and Circuit Elements
ELECTRICITY & MAGNETISM Electric Potential Difference (P )
Equivalent Resistance
Radiation Safety Considerations
Hardware Commissioning
TT40 incident at 23:46 on 25th October 2004
Beam Stability of the LHC Beam Transfer Line TI 8
Presentation transcript:

AB-CO TC / J. Wenninger1 MCB orbit correctors  There are 752 MCBH(V) SSS orbit corrector circuits.  Individually powered by a ± 60 A, ± 8 V converter.  PCs installed in the tunnel (radiation).  PCs are in production today.  The design MTBF is 100’000 hours   1 failure in operation every 100 hours.  Assuming ½ MCBs have significant kicks, we may get 1 MCB- induced beam loss per week due to our orbit tight tolerances !

AB-CO TC / J. Wenninger2 Crowbar In case of PC failure the magnet is shorted and discharged through a crowbar. Time constants :  without crowbar seconds  with crowbar seconds - mostly due to 100 m  resistors

AB-CO TC / J. Wenninger3 Remedies  The orbit FB could save the beam :  The FB must switch in a compensating scheme based on nearby correctors (or equivalent)  reduce effect to a local bump.  The FB must be informed rapidly – time scale of 1 second or less.  The circuit time constants should be as long as possible.  With the 2 crowbar resistors the situation is very tight…  From MP point of view, the MCBs are slow enough even with crowbar resistors not to present a major problem. But the slow is beautiful for MP  slower is better !

AB-CO TC / J. Wenninger4 Can we remove 1 or both crowbar resistors ?  Meeting with all concerned parties (AB & AT) :  The crowbar resistors have no role in protecting the magnets. The magnets are self-protected.  Motivation behind resistors seems to be a shorter circuit discharge time.  PC tests performed without crowbar resistors by AB/PO indicate that the resistors can be removed.  Implications for electrical safety, since it takes then ~ 10 minutes for the current to go from 60 to below 1 A for the slowest elements.  need a rapid decision since the PCs are in production.  ECR will be prepared this week.