Tripartite Meeting September 2006 Seoul, Korea Item B12. CSR Maintenance Procedures - feedback and commentary mechanisms on Q&As, CIs and Rule Change Proposals.

Slides:



Advertisements
Similar presentations
PUBLISH NOTIFY / TAKE COMMENTS ANSWER ENQUIRIES Notification Obligations 1.Statement on Implementation 2.Notification of Technical Regulations or Conformity.
Advertisements

Department of Arts and Culture Briefing on the Use of Official Languages Bill to the Select Committee on Education and Recreation Date:15 August 2012.
IPCC Products, Procedures and Processes Amsterdam, 14 May 2010 Dr. Renate Christ, Secretary of the IPCC.
Standards experts. Accreditation solutions. Andrea Spencer Coordinator, WTO/NAFTA Enquiry Point (Canada) SPS Workshop on Transparency, Geneva October 18,
Green Roof Action Project 綠頂行動 Our scheme is not just about physical implementation of green features on top of school buildings, it is about the knowledge.
1 Periodic Reporting under UN Human Rights Treaties The Government’s report to the Committee on the Rights of the Child 4 – 5 June 2012.
IACS Requirements.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
T HE T RANSITION OF HCS C ASE M ANAGEMENT TO MRA S ERVICE C OORDINATION.
Standards experts. Accreditation solutions. Andrea Spencer Coordinator, WTO/NAFTA Enquiry Point (Canada) TBT Special Meeting on Procedures for Information.
TAC July 2, 2003 Market Design Implementation Process Recommendation.
Annual Homeless Assessment Report (AHAR) What data will be included in the 2010 AHAR? October 1, 2009 – September 30, 2010 Seattle and King County.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
Compliance with the WTO Technical Barriers to Trade Agreement and Steps Toward Developing Good Regulatory Practices Bryan O’Byrne Trade Compliance Center.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
GAC-GNSO Consultation Group On GAC Early Engagement in GNSO PDP London Progress Report 22/06/2014.
Tripartite Discussions 31st Oct – 1st Nov 2005, Beijing Quality control on new buildings - Role and authority of Class Speaker – Robert Smart LR IACS Council.
Prepared by Opinion Dynamics Corporation May 2004.
Budget Setting Process For 2015 Budget Draft 0.1 Member Forum Date of Meeting: 27th May 2014.
GAC-GNSO Consultation Group On GAC Early Engagement in GNSO PDP London Progress Report 22/06/2014.
Interim Solution What it is and how to to use it 21 June 2012.
Concept of Transparency Platform Martin Reisner Junior Adviser, Transparency ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
1 Presentation to Legislative Council Panel on Financial Affairs Progress of Implementation of Basel II in Hong Kong Hong Kong Monetary Authority 4 May.
MODULE B - PROCESS SUBMODULES B1.Organizational Structure B2.Standards Development: Roles and Responsibilities B3.Conformity Assessment: Roles and Responsibilities.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI.
CIVILIAN SECRETARIAT FOR POLICE STATUS REPORT ON IMPLEMENTATION OF THE CIVILIAN SECRETARIAT FOR POLICE SERVICE ACT 2 OF 2011 PORTFOLIO COMMITTEE ON POLICE.
Tripartite meeting Beijing, 8-9 November 2008 Status and Early Experience of CSRs Gary Horn Director Rules & Standards, ABS IACS Hull Panel Chair.
A proposal for an APNIC document editorial policy (prop-002-v001) Address Policy SIG APNIC 16, Seoul, Korea 21 August 2003.
Presentation on amendment of money bills National Treasury 6 August 2008.
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
Tripartite Meeting Seoul, Korea, September 2009 Safety & SOLAS Agenda item 4.1 Goal-Based Standards --- application and compliance --- Toshiro Arima.
©2012 Morrison & Foerster (UK) LLP | All Rights Reserved | mofo.com Data Protection Masterclass: The New Draft EU Data Protection Regulation 19 September.
Hull Survey for New Construction Z23 (July 2006) John Finch Chairman IACS expert group on the Hull survey for New Construction September 2006.
SPS Workshop Taipei, 5-6/12/2001 The Transparency Provisions of the SPS Agreement.
1 IACS Common Structural Rules INTERTANKO LATIN AMERICAN PANEL Rio de Janeiro, 25 April 2006.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Tripartite meeting Japan, Tokyo, 20 – 21 September 2007 Agenda item 3.2 Status and Early Experience of CSR Kirsi Tikka Vice President, ABS Global Technology.
M ODULE 6 PART 1: Planning and Stakeholder Management GLOBAL FUND GRANT CONSOLIDATION WORKSHOP DATE.
Overview of the IEEE Process. Overview of Process l Project Approval l Develop Draft Standards l Ballot Draft l IEEE-SA Standards Board Approval l Publish.
Policy and Procedure for the Handling of Complaints against the AG Consultation with the Standing Committee on the Auditor-General 9 April 2008 Wandile.
1 Serbian Association of Accountants and Auditors (SAAA) IFRS and ISA TRANSLATION.
Tripartite meeting Korea, Seoul, 14 – 15 September 2006 Agenda B.10 Sharing information for ships in service (incident information sharing) Konstantin.
TEXAS NODAL Market Design Structure and Process August 19, 2003.
Briefing to the Portfolio Committee on Police 21 August
EMSA Study on DH Tanker Safety Tripartite Discussions Beijing 2005, 31 st Oct – 1 st Nov Agenda Item Europe EMSA Study on DH Tanker Safety.
GNSO Work Prioritization To: GNSO Council Date: 21 April 2010 Presenter: Olga Cavalli (Chair) Work Prioritization Model Drafting Team (WPM-DT)
Chanchal C Sarkar DY. Director, Trade Policy Division Department of Commerce, Ministry of Commerce & Industry TBT Agreement : Key Principles.
© International Training Centre of the ILO International Labour Standards and the ILO Supervisory System: tools to defend workers’ rights Geneva,
INTERNATIONAL ELECTROTECHNICAL COMMISSION «Harmonization of the national accreditation system of Eurasian countries» 23 December 2013 Moscow World Trade.
GTFORCIDI Summary of mandates and proposal for streamlining sectoral ministerial processes.
REVISIONS DATE SLIDE CHANGE 11/22/10
process and procedures for assessments
Electronic Filing of Differences(EFOD) System and Filing of Differences Task Force (FDTF) Air Navigation Bureau.
Implementation Strategy July 2002
Grid Code Development Forum – 6 September 2017
OASIS Electronic Trial Master File Standard Technical Committee Meeting Agenda June 20, :00 – 9:30 AM PDT.
Business environment in the EU Prepared by Dr. Endre Domonkos (PhD)
Setting Actuarial Standards
MODULE A - ADMINISTRATIVE
National Mechanisms for Reporting and Follow-up
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
TBT Agreement : Key Principles
Exit Capacity Substitution and Revision
Statewide Accountability
Committees dealing with Taliban and Al-Qaida
Jill Michielssen European Commission, DG Environment
Why a „test phase“? Overview
Guidelines on the Mid-term Evaluation
Second Independent Evaluation of UNAIDS
Presentation transcript:

Tripartite Meeting September 2006 Seoul, Korea Item B12. CSR Maintenance Procedures - feedback and commentary mechanisms on Q&As, CIs and Rule Change Proposals Gil-Yong Han Response Manager IACS Permanent Secretariat

CSR Maintenance Procedures - feedback and commentary mechanisms on Q&As, CIs and Rule Change Proposals Contents 1IACS meetings with Industry 2.CSR Maintenance Procedures 2.1Organization/function 2.2IACS CSR Knowledge Center 2.3Q&As and CIs 2.4Rule Changes Proposals(RCP) 3CSR Cross Check (introduction only) 4Summary

1.IACS meetings with Industry IACS Industry (ICS, BIMCO, INTERTANKO, INTERCARGO, etc) 1. IACS regular meetings with Industry - CSR Rule Change Proposals - IACS activities on CSR issues 2.IACS publishes FAQs + Answers on the web site

2. CSR Maintenance Procedures 1. IACS PR 32 - IACS Procedural Requirement No.32 defines ‘CSR Maintenance Procedures’. - Became effective on 1 August Objective - To Facilitate a consistent and uniform application of IACS CSR. 3. Scope of the Maintenance Procedures - Questions and Answers (Q&A) regarding CSR - Common Interpretations (CI) on CSR - Rule Change Proposals (RCP)

2.1 Organization/function Council CSR Secretariat SG/CSR [GPG] Hull Panel - Possess and provide technical expertise - Prepare technical answers/interpretations - Reply to the Questions - Prepare/review Rule Change Proposals (RCP). CSRPT 2 (Tanker) CSRPT 1 (Bulk) Hull Panel: - Review technical answers - Review Rule Change Proposals - Resolve controversial technical issues - Feedback CIs to all IACS Members - Advise Council on CSR issues - Track the CSR maintenance process - Adoption of amendments to CSR - Decision on policy & controversial issues. CSR Secretariat: -Day-to-day operation of IACS CSR DB -Monitor the reply schedule -Publish FAQs / CSR -Report to Council and SG/CSR

2.2 IACS CSR Knowledge Centre 1. Objective - To facilitate the CSR maintenance process in an effective and transparent manner. 2. Function - On-line database with interactive dialogue facility. - KC = Q&As + CIs + RCPs. - IACS Members access the KC to search agreed Q&As and CIs. 3. Operation - The IACS KC started to offer its services on 1 Aug 2006.

2.2 IACS CSR Knowledge Centre

2.3 Q&As and CIs 1. Objectives - (Q&A) Questions are answered in a consistent and timely manner by the relevant group. - (Q&A) The so prepared answers are fed back to Members and referenced where relevant. - (CI) Members’ requests for Common Interpretations (CI) are dealt with in a consistent and timely manner by the relevant group. - (CI) The so developed CIs are uniformly applied by Members. 2. Procedures - PR In general, IACS CSR PTs prepare answers / CIs within ten (10) working days. 2.2 CSR Secretariat publishes FAQs & Answers on its web.

2.4 Rule Change Proposals (RCP) 1. RCP Procedures (PR 32) 1.1 Project Teams - Draft and review RCP. 1.2 Hull Panel - Review and approve RCP 1.3 IACS Members’ Technical Committees - Review and approve RCP. - Comments are sent to PTs. 1.4 Council adopts RCs (Rule Changes).

2. Rule Changes – time table 2.1 Final Rule Changes (adopted by IACS Council) : - Published once a year on 1 st Jan; and - Enter into force from the following 1 July. 2.2 In case of urgent need to make rule changes / corrections: - Rule Change Notice or Corrigenda issued. 2.4 Rule Change Proposals (RCP)

3. CSR Cross-Check 1. Objective To ensure that IACS Members approve the same set of drawings with the same results of required scantlings. 2. Hull Panel Project Team 3 ‘FEA Cross Check’ Consistent implementation of FEA requirements of the two sets of CSR. 3. Hull Panel Project Team 4 ‘Rules Cross Check’ Cross-check the prescriptive requirements (rule required scantlings) of the 2 sets of CSRs. Work is under progress within the Hull Panel.

4. Summary 1. IACS Procedural Requirement 32 (CSR Maintenance) defines Procedures for dealing with Q&As, CIs and Rule Change Proposals; 2.IACS PR 32 defines the procedures and time frame for CSR amendments / publication; 3. IACS CSR KC is a tool to support the IACS organization in implementing PR 32; 4. IACS Permanent Secretariat will publish FAQs and Answers on its web site on a regular basis; and 5.To further facilitate communication and transparency, IACS plans to meet with Industry Associations regularly to brief industry of the CSR maintenance and harmonization activities. END

Reference 1: Q&As and CIs – IACS members IACS Member: a single point of contact PT: Project Team (PT 1: 3 Bulker Members + 1 Tanker Member) (PT 2: 3 Tanker Members + 1 Bulker Member) IACS Member *PT (T, B) Hull Panel Council unanimous technical controversial policy SG/CSR policy technical controversial Question Answer  Each arrow indicates entry into CSR DB  Permsec facilitates Project Teams are authorized to make decisions and reply to the questions, except for cases where unanimous agreement is not reached.

Reference 2: Q&As and CIs - Industry/Stakeholders PT: Project Team (dedicated account) Industry Chair/ Perm Sec PTCouncil Technical Policy SG/CSR Question Answer  Each arrow indicates entry into CSR DB  Permsec facilitates

Reference 3: Rule Changes Proposals (RCP) PT RCP HP- 3/4 majority decision IACS Members TC TC comments PT review HP Final RCP Council IACS Member IACS Member: a single point of contact PT: Project Team RCP: Rule Change Proposal HP: Hull Panel Entry into Force Adoption Request or RCP Response to comments  Each arrow indicates entry into CSR DB  Permsec facilitates