AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.

Slides:



Advertisements
Similar presentations
Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
Advertisements

Houston Region Import Capacity Project Planning for Reliable Power.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Jan 22, 2013 RPG Meeting Sharyland Atlas-Driver Load Integration Project – EIR update.
March 6, 2008 Technical Advisory Committee Luminant Energy & Oncor Tyler Grande Autotransformer Addition and 138 kV Line Upgrade Project Jay Teixeira Manager,
Regional Planning Group Project
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
System Voltage Planning Brian Moss PD / Transmission Planning Transmission Planning Overview October 30, 2007.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
BRAZOS ELECTRIC COOPERATIVE Dobbin 345 Project David Albers, P.E. Manager – System Planning.
Valley Import Overview Jeff Billo Regional Planning Group Meeting July 22, 2014 Preliminary1.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
RTP Update RPG Meeting July 21, RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete.
New Richmond Load Serving Study Northern MAPP Subregional Planning Group August 16, 2006 Daniel Kline.
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
Houston Area Dynamic Reactive Project March 11,
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
Oct 14, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
Rocky Mountain Power Five Year Study Findings and Kick Off Meeting December 2013.
Aug 17, 2012 RPG Meeting KEC & MEC – Load Addition Project – ERCOT Independent Review Ehsan Ur Rehman Planning Engineer ERCOT.
RPG Meeting Five Year Plan Extension Brad Schwarz.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
West to North CSC Location Scenario 3b WMS August 20, 2008.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
Kurten Switch Project ERCOT Board of Directors Bill Bojorquez System Planning December 13, 2005.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
Substation Inspection Program. Mission Substation Incident The event occurred on December 20, 2003 during the peak Christmas shopping season A fire occurred.
POWER SYSTEM PLANNING CHARTER AND PROCESSES UPDATES Presentation to TAC Sept 9, 2004 Transmission Services Ken Donohoo, Manager of System Planning
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
WEST LEVEE TO NORWOOD 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Big Stone II – Delivery Study Phase 6 and Supplemental #2 For Northern MAPP SPG Meeting 4/3/07 Elk River Richard Dahl Missouri River Energy Services.
JACKSBORO TO WEST DENTON and WEST LEVEE TO NORWOOD 345-kV PROJECTS April 20, 2004 Transmission Services Operations.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
ERCOT Independent Review
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
© 2000 PACIFICORP | PAGE 1 SOUTHWEST UTAH AREA STUDY SEPTEMBER 2014 Nathan Wilson/Talmage Daley Need to review the LOADS before Friday.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
LCRA TSC/ CPS Energy Transmission System Addition Regional Planning Group Project Jeff Billo Sr. Manager, Transmission Planning TAC ERCOT Public March.
ERCOT PUBLIC November RPG Meeting RTP – Study Scope November 20, 2015.
Jeff Billo Manager, Transmission Planning
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
May 8, 2008 Technical Advisory Committee CenterPoint Energy Rothwood Substation Project Jay Teixeira Manager, Regional Planning.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
Response to TAC Questions on PGRR031 TAC– January 28, 2014 Jeff Billo, ERCOT 1.
LINE 69H REBUILD AND CONVERSION PROJECT ERCOT Regional Planning Group April 21,2016.
Houston Area Constraint Mitigation Project ERCOT Board of Directors March 15, 2005.
Sep 16, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
Freeport Area Master Plan Project -
Nacogdoches to Lufkin SS 345 kV Line Project
Barrilla Junction Area Transmission Improvements Project
Electric Utility Master Plan Update
Warren Lasher Manager, Long-Term Planning and Policy
Compliance Report to ERCOT TAC February 2007
I-5 Corridor Reinforcement Project
DEC System Voltage Planning - June 2018
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Acadiana Load Pocket Project
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Presentation transcript:

AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015

ERCOT Public 2 Load growth in Live Oak and Bee Counties has created the need for transmission improvements in the area With the present transmission system, it is difficult to schedule maintenance even during off-peak seasonal conditions –In October 2013, approximately 80 MW of load was lost across seventeen substations due to a single contingency during a maintenance outage AEPSC submitted a project for Regional Planning Group review and comment in March 2015 Project Background

ERCOT Public 3

4 G-1 N-1 Contingency Results (summer peak cases) N-1-1 Contingency Results (2017 minimum load case) ERCOT Independent Review Reliability Analysis BranchLoading in 2018Loading in 2021 San Miguel – Choke Canyon 138 kV107%113% Choke Canyon – Sigmor 138 kV103%109% Normanna - Pettus 69 kV100%103% Normanna - Beeville 69 kV99%103% BranchWorst Contingency Loading Pleasant – Imogene Tap 69 kV102% Coy City – Imogene Tap 69 kV102% Bus NameBus Voltage Choke Canyon 138 kV0.88 Three Rivers 138 kV0.88 Sigmor 138 kV0.88

ERCOT Public 5 ERCOT evaluated five options to solve the reliability criteria violations ERCOT will seek Board endorsement of Option 4:  Construct a new 138 kV Beeville Substation near to the existing Beeville 69 kV Substation  Install a new 138/69 kV transformer at the new Beeville 138 kV Substation  Construct a new 138/69 kV double circuit transmission line from Tuleta to Beeville. Utilize the existing Right of Way of the Pettus – Normanna – Beeville 69 kV transmission line where possible  Using existing Right of Way where possible, rebuild and convert the existing Beeville – Three Rivers 69 kV transmission line to 138 kV The cost estimate is $74.5 million ERCOT Recommendation