NASA Expendable Launch Services Current Use of EELV

Slides:



Advertisements
Similar presentations
The NASA Shared Services Center (NSSC) November 2007 National Aeronautics and Space Administration
Advertisements

Concept Overview for 2 mt Case “2 mt case”: integrated payloads of no more than 2 mt can be landed on the surface of Mars; extension of current Mars EDL.
Larry Phillips MAY 13th-17th, 2002 Micro Arcsecond Xray Imaging Mission: Pathfinder (MAXIM-PF) Launch Vehicle Information Final Version.
OFFICE OF THE CHIEF TECHNOLOGIST 2 Space Technology Program – Overview Possible Solution Possible Solution Idea Possible.
Space and Missile Systems Center AFCEA Luncheon 21 Feb 13 Colonel Bob Hodgkiss Director, Launch Systems Directorate Building the Future of Military Space.
What is a U Class Payload?
Launch Vehicles. LAUNCH SYSTEM CONCEPTS SHROUD PROTECTS THE SPACECRAFT SHROUD PROTECTS THE SPACECRAFT MAIN VEHICLE PRIMARY LIQUID OR SOLID ROCKET PROPELLANT.
Goddard Space Flight Center 1 NASA Goddard Space Flight Center’s Wallops Flight Facility A View of Wallops Bill Wrobel Director, Wallops Flight Facility.
Line Efficiency     Percentage Month Today’s Date
National Aeronautics and Space Administration Commercial Crew and Cargo Program Overview June 17, 2009 Doug Cooke.
Payload Design Criteria for the Space Test Program Standard Interface Vehicle (STP-SIV) Mr. Mike Marlow STP-SIV Program Manager Payload Design Criteria.
NASA AGENCY REPORT Dr. Eric J. Lindstrom Physical Oceanography Program Scientist Earth Science Division Science Mission Directorate MARCH 12, 2007.
Rocket Power – Part 2 Introduction to Rockets and Missiles Scott Schoneman 4 Nov 03.
Spacecraft Launch Vehicles
Launch Opportunities for Standardized Payloads kg The 17th Annual Small Payload Rideshare Symposium June 9-11, 2015 Johns Hopkins University Applied.
0 Financial and Market Risks for Space Launch Providers Presented by: Charlie Precourt ATK Aerospace Systems Space Transportation Policy and.
The James Webb Space Telescope. Introduction The James Webb Space Telescope  The James Webb Space Telescope, also called Webb or JWST, is a large, space-based.
NOAA Satellite Conference April 8-12, 2013 Mary Kicza Assistant Administrator for Satellite & Information Services.
Understand how space organizations use concepts of operations and system integration plan to ensure the success of their program Space Concept of Operations.
Polar Topographic Knowledge Prior to LCROSS Impact David E. Smith 1, Maria T. Zuber 2 1 NASA/Goddard Space Flight Center 2 Massachusetts Institute of Technology.
Florida Space Authority COMSTAC Launch Operations and Support Working Group May 23, 2006 Patrick McCarthy Manager, Spaceport Operations.
GSFC/Wallops Flight Facility 1 NASA/Goddard Space Flight Center’s Wallops Flight Facility Federal Laboratory Consortium January
1 SpaceX proprietary data constituting “Confidential Information” under applicable agreements. Tim Hughes Vice President & Chief Counsel.
Copyright © 2008 United Launch Alliance, LLC. All rights reserved. Images Courtesy of Lockheed Martin and The Boeing Company O22P1-478 SPACE Transportation.
Gwynne Shotwell January 13, Space Exploration Technologies Corporation Spacex.com Bringing Manufacturing Back to the US: 21 st Century Rocket.
National Aeronautics and Space Administration Transitioning Toward the Future of Commercial Human Spaceflight COMMERCIAL CREW PROGRAM AIAA Spring Dinner.
LRO/LCROSS Launch Preview How Where When Presentation for NASA Solar System Ambassadors and Museum Alliance March 20, 2009 Brooke Hsu, LRO E/PO Lead Brian.
Constellation Space Transportation Planning Office July 30, 2009.
Astrophysics Division Astrophysics Division Report Jon Morse, Director Astrophysics Division Science Mission Directorate NASA Headquarters October 11,
ST5 PDR June 19-20, 2001 NMP 2-1 EW M ILLENNIUM P ROGRA NNMM Program Overview Dr. Christopher Stevens Jet Propulsion Laboratory, California Institute of.
Astrophysics Division Astrophysics 2020: Large Space Missions beyond the Next Decade Enabling Future Large Astrophysics Missions while Living within Our.
1 Launch Vehicle Presentation to the Heliophysics Community Workshop Bill Wrobel May 19, 2008.
LEO Propellant Depot: A Commercial Opportunity? LEAG Private Sector Involvement October 1 - 5, 2007 Houston, Texas LEAG Private Sector Involvement October.
Approved For Public Release © The Aerospace Corporation 2009 June 17, 2009 Initial Summary of Human Rated Delta IV Heavy Study Briefing to the Review of.
Safety & Health Considerations in Accommodating Commercial Activties David Loyd, JSC Safety & Test Operations 2013 NASA Safety Directors & Occupational.
ISS Commercial Resupply Services Michael Suffredini ISS Program Manager June 17 th, 2009 Augustine Committee UPDATED: Corrected page 10 (replaced “first.
2015 in Spaceflight: A year in review Tal Inbar Head, Space Research Center The Fisher Institute for Air & Space Strategic Studies, Israel.
Millennium Engineering and Integration Company A NEW DOCUMENTATION PROCESS TO STREAMLINE RANGE SAFETY PROCEDURES 0 O. “Rusty” Powell, Allan Smith, Jeff.
Jan 2016 Solar Lunar Data.
Launch Vehicle Presentation
Welcome to the Sciences and Exploration Directorate!
NASA Hypersonic Research
Propellant Depot Bernard Kutter United Launch Alliance
TEMPO’s Commercially Hosted Payload Concept
TORFQ ACTIONS TO BE RELEASED

Average Monthly Temperature and Rainfall
<Location> – <Project Name>, Sponsor: <name>

2017 Jan Sun Mon Tue Wed Thu Fri Sat
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
Jan Sun Mon Tue Wed Thu Fri Sat
Omnibus IV Contract Overview Elieen Emond Contract Specialist
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Lightning Academy FY19 Course Schedule
Video ULA.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
Rev. 2 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY 2002 SERVICE PROVIDER JAN FEB MAR APR MAY JUN JUL AUG SEP.
Presentation transcript:

NASA Expendable Launch Services Current Use of EELV Lynn F. H. Cline Deputy Associate Administrator for Space Operations National Aeronautics and Space Administration June 17, 2009

Overview NASA’s expendable launch vehicles are run by the Launch Services Program (LSP) consolidated at Kennedy Space Center in 1998 LSP provides acquisition, technical management, mission integration and launch management NASA utilizes a mixed fleet of vehicles (small, medium & intermediate) with varying levels of performance used to support a mix of mission sizes Mainly for Science Mission Directorate payloads, but other NASA Directorates and other government agencies also use NASA launch services Launches conducted from multiple ranges, including RTS, WFF, Kodiak Vehicles are selected from the NASA Launch Services Contract (NLS) Through competition based on mass, orbit, class of payload, and best value Current NLS contract expires in 2010, RFP released to extend the contract Most recent contract action purchased four intermediate class missions TDRS – K & L, RBSP and MMS Important issues Loss of Medium Class launch service provider, which has been 50% of NASA missions historically Compressed manifest Possibility that NASA incurs a portion of the intermediate class infrastructure costs post 2010

NASA Launch Services Manifest 2009 2010 2011 2012 2013 2014 2015 2016 Q1 Q2 Q3 Q4 FPB Approved 3/25/09 Release 6/03/09 Rev. 1 Small Class (SC) Pegasus (P) Taurus (T) Falcon 1 (F) Medium Class (MC) Delta 732X Series (D3) Delta 742X Series (D4) Delta 792X Series (D) Delta 792X H (DH) Intermediate (IC) / Heavy Class (HC) Atlas V (AV) Delta IV (DIV) Delta IV Heavy (IVH) Falcon 9 ADVISORY ROLE Vehicle Unassigned NuSTAR (P-XL) 8/2011 OCO (T) 2/24/09 GLORY (T) NET 1/23/10 NOAA-N' (D3) 2/6/09 WISE (D3) 12/10/09 AQUARIUS (D3) 5/23/10 KEPLER (D) 3/6/09 NPP (D) 1/16/11 STSS ATRR (D) 5/5/09 GRAIL (DH) 9/8/11 MARS SCIENCE LAB (AV) 11/2011 RBSP (AV) 5/31/2012 LRO/LCROSS (AV) 6/17/09 SDO (AV) NET 10/8/09 TDRS-K (AV) 4/13/2012 LDCM (AV) NET 12/2012 TDRS-L (AV) 2/23/2013 MMS (AV) 10/15/2014 Juno (AV) 8/7/2011 GOES-O (DIV) NET 6/26/09 SpaceX-1 (COTS/F9) 1/2010 SpaceX-2 6/2010 SpaceX/CRS-1 12/2010 (F9) OSC/CRS-1 (T2/C30) 10/2011 LADEE (M) 5/2012 JWST (Ariane) 6/2014 SpaceX-3 8/2010 GOES-P (DIV) 10/2010 SMEX-12 SMEX-13 NET 4/2014 GPMC MAVEN 11/18/2013 Discovery 12 CY 2014 GOES-R V A W K * For NASA Planning Purposes Only UR = UNDER REVIEW A = ATP’d * = MISSION UNSUCCESSFUL = EXPLORATION SYSTEMS = SPACE OPERATIONS K = KWAJALEIN = DOD REIMBURSABLE = VAFB L W = WALLOPS LAUNCH = SCIENCE = SPACE OPERATIONS V = VAFB LAUNCH = DOD REIMBURSABLE

Small Launch Vehicle Performance Range (Kg) Performance From Payload Planner’s Guides or Company Estimates 120 inch PLF 7320 NO LONGER AVAILABLE 92 inch PLF 50 inch PLF 60 inch PLF 92 inch PLF Small Class Medium Vehicle Falcon 1 Pegasus XL Athena I Minotaur I SIGNIFICANT GAP Taurus XL GAP Athena II Minotaur IV Minotaur V Delta 7320 Orbit 600 km 90 deg 200 (a) 250 ~300 375 900 ~1150 ~1200 NA 1650 675 km SS 225 325 750-800 1100 1550 C3=0 ~280(kg) ~425(b) ~390 7425=750(b) Perf risk Low-Med Low Med Avail for Science Msn (c) Now ~Late CY 2014 ~3rd qtr 2011 N/A - - (a): Falcon 1e concept with higher performance (~400kg) exists, but is in early development stage (b): Requires additional LV provided stage for high energy missions (c): Significant schedule risk exists for first flight date of any new launch vehicle configuration, therefore actual availability is likely 6 to 18 months after dates noted above. 5 5

Medium, Intermediate and Heavy Launch Vehicle Performance Range (Kg) Performance From Payload Planner’s Guides or Company Estimates 5m PLF 4m PLF 5m PLF Delta II 73/7425 No Longer Available 4m PLF 10 ft PLF Medium Class EELV Class Vehicle Orbit Delta II 7320/5 Taurus 2 WFF Delta II 7920/5 H Falcon 9 Block 1 (b) SIGNIFICANT GAP Delta 4040 Atlas V 401 Atlas V 551 Delta IV Heavy Ares V (c) C3=0 750 (a) 1150 (a) 1400 (a) 2000 2750 3450 6300 9305 62.8 mT(to TLI) C3=10 650 (a) 950 (a) 1200 (a) 1350 2100 2850 5300 7010 675 km sun sync 1550 Not achievable from WFF Not achievable from CCAS ~6500 6800 7250 13600 20250 ~187.7 mT (to 29 deg incl, 130 nm) GTO N/A TBS 900 3495 3985 4765 8570 12980 Perf risk Low High Med Available for Science Msn ~1st qtr 2014 (d) Now 2nd half CY2019 (d) (a) Requires additional LV supplied upper stage for high energy missions (b) Falcon 9 Block 2 upgrade planned (higher performing) – available ~4th qtr 2013 (c) On hold until conclusion of Augustine Commission (d) Significant schedule risk exists for first flight of any new LV configuration, therefore actual availability is likely 6 -18 mo after dates noted above. 6 6

EELV Considerations Cost Infrastructure Industrial base Multiple users risk approaches Schedule

Back up slides

EELV Launch History Rainbow 1 Atlas V (521) 17 Jul 03 DSCS A3 Delta IV (4,0) 10 Mar 03 DSCS B6 Delta IV (4,0) 29 Aug 03 Eutelsat Hotbird 6 Atlas V (401) 21 Aug 02 Eutelsat W5 Delta IV (4,2) 20 Nov 02 Hellas Sat Atlas V (401) 13 May 03 Mars Recon Orbiter Atlas V (401) 12 Aug 05 AMC-16 Atlas V (521) 17 Dec 04 HLV-Demo Delta IV (HLV) 21 Dec 04 Inmarsat I-4 Atlas V (431) 11 Mar 05 Pluto New Horizons Atlas V (551) 19 Jan 06 Astra 1KR Atlas V (411) 20 Apr 06

EELV Launch History - continued GOES-N Delta IV (4,2) 24 May 06 NROL-22 vb Delta IV (4,2) 28 Jun 06 DMSP-17 vb Delta IV (4,0) 4 Nov 06 STP-1 Atlas V (401) 9 Mar 07 NROL-30 Atlas V (401) 15 Jun 07 WGS SV-1 Atlas V (421) 11 Oct 07 DSP-23 Delta IV HLV 11 Nov 07 NROL-24 Atlas V (401) 10 Dec 07 NROL-28 vb Atlas V (411) 13 Mar 08 ICO-G1 Atlas V (421) 14 Apr 08 WGS SV-2 Atlas V (421) 4 Apr 09 NROL-26 Delta IV HLV 18 Jan 09