(1) NASA Expendable Launch Vehicle Payload Safety Program Briefing to 30 th SW April 13, 2010 Cal Staubus ELV Payload Safety Manager.

Slides:



Advertisements
Similar presentations
Effective Contract Management Planning
Advertisements

Software Quality Assurance Plan
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
NEES Project Management Workshop June 16 June 18 1 Segment 2.
DoD Information Technology Security Certification and Accreditation Process (DITSCAP) Phase III – Validation Thomas Howard Chris Pierce.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
FAA Regulatory Policy for Composite Material Control Presented at 8/8/02 FAA/NASA Workshop (Chicago, IL) Introduction – Importance of stabilizing composite.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
System Safety & Mission Assurance (SS&MA) for Sub-Class D Missions Steve Jara NASA Ames System Safety & Mission Assurance Division.
Office of Inspector General (OIG) Internal Audit
Systems Engineering Management
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Project Management: Madness or Mayhem
S/W Project Management
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Expendable Launch Vehicle Payload Safety Program Cal Staubus.
Unit 8:COOP Plan and Procedures  Explain purpose of a COOP plan  Propose an outline for a COOP plan  Identify procedures that can effectively support.
NIST Special Publication Revision 1
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Important acronyms AO = authorizing official ISO = information system owner CA = certification agent.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
SacProNet An Overview of Project Management Techniques.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Project Life Cycle.
Georgia Institute of Technology CS 4320 Fall 2003.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Constellation Space Transportation Planning Office July 30, 2009.
Technical Standards NPR Presented to Technical Standards Working Group June 11, 2007.
Compliance Monitoring and Enforcement Audit Program - The Audit Process.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
BSBPMG501A Manage Application of Project Integrative Processes Manage Project Integrative Processes Unit Guide Diploma of Project Management Qualification.
Decision Making Process Program Planning and Control Deana Hackfeld Management Systems Office November 17, 2006.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
National Aeronautics and Space Administration Space Launch System Phase I Safety Review Preparation for GT #2 Topic: Phase I Safety Review.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
WMATA Project Implementation Manual (PIM) Stage 3, Construction Chapter 200, Authority Representative, Responsibilities and Functions Presenters: David.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Safety & Health Considerations in Accommodating Commercial Activties David Loyd, JSC Safety & Test Operations 2013 NASA Safety Directors & Occupational.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Internal Audit Section. Authorized in Section , Florida Statutes Section , Florida Statutes (F.S.), authorizes the Inspector General to review.
Important acronyms AO = authorizing official ISO = information system owner CA = certification agent.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Camera PDR/CD1 Planning 19 September 2008
Software Project Configuration Management
Software Configuration Management
Software and Systems Integration
Lockheed Martin Canada’s SMB Mentoring Program
PSS verification and validation
DOE Review of the LCLS Project October 2006
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Presentation transcript:

(1) NASA Expendable Launch Vehicle Payload Safety Program Briefing to 30 th SW April 13, 2010 Cal Staubus ELV Payload Safety Manager

Assuring the Safety & Enhancing the Success of ELV Payload Activities 2 Objectives Improve safety of NASA ELV payloads Improve the Safety Review and Approval process for NASA payloads Improve the understanding of NPR , PSWGs and their relationship to AFSPCMAN and Air Force Range Safety Explain the purpose and content of the NASA ELV Payload Range Safety Requirements (NEPRSR) Address questions Introduce ELV Payload Safety Website EUROPA Explorer

Assuring the Safety & Enhancing the Success of ELV Payload Activities PSWG PSWG members maintain their individual safety authority for their areas/locations of responsibility – The PSWG is established to recognize all safety authorities – Air Force Range Safety still upholds AFSPCMAN – Astrotech and other contracted Payload Processing Facilities (PPF) still ensures their local safety requirements are met for payload processing in their facilities – Launch Vehicle Safety representative ensures their launch vehicle and spacecraft integration safety requirements are met – NASA LSP Safety chairs the PSWG meetings and ensures NASA safety requirements are met on NASA property and per NASA contracts in contracted PPFs (includes NPR ) – LSIM helps ensure appropriate safety (NASA/contracted PPF) requirements are met – Payload Project Safety ensures all local safety requirements are met 3

Assuring the Safety & Enhancing the Success of ELV Payload Activities 4 Payload Safety Working Group Membership Mission PSWG w/ Chairperson System or Subject Matter Expert (As Needed) Ground OPS (As Needed) Launch Vehicle Contractor Safety Air Force 45/30 SW Range Safety Mission Center NASA & Contractor Safety *LSP LSIM * Invited participant KSC S&MA Launch Services Division (SA-D) Note: NASA Launch site safety organization will most likely chair Payload Processing Facility Safety

Assuring the Safety & Enhancing the Success of ELV Payload Activities Background NASA STD ELV Payload Safety Review Process Standard (June 1998) to be updated June 2003 – For the most part successful but needed improvements: KSC and GSFC both submitted proposals in 2004 (PPBE) to OSMA to improve the ELV Payload Safety review and approval process Complicated roles for projects involving multiple NASA Center International Partners (CALYPSO) issues Lack of defined authorities in the safety review and approval process Lack of acceptance of external (non-NASA) approving authority and requirements relying heavily on Air Force Range Safety requirements Lack of process for resolving dissenting opinions within NASA and with external organizations Payload Safety Working Group (PSWG) authority, activities and processes not consistent from payload to payload (JPL vs. GSFC projects) (5)

Assuring the Safety & Enhancing the Success of ELV Payload Activities Background (continued) Program development effort built on the current PSWG approach and augmented as needed to addressing lessons learned Improvements to include: – Establish a NASA organization responsible for consistent implementation/interpretation of safety requirements and overseeing the safety review process – Establish and maintain NASA ELV Payload Safety Processes and Requirements – Identify Decision Making Authorities Formal process for resolving differences within the PSWGs Formal variance/waiver process – Replace NSS with NPR 6

Assuring the Safety & Enhancing the Success of ELV Payload Activities 7 NPR Format Chapter 1: – Introduction – Payload Safety Policy – Programmatic Roles and Responsibilities – Tailoring and Waiver Processes Chapter 2: – Payload Safety Working Group – Project Roles and Responsibilities – Flow of Activities and Deliverables – Content of Deliverables – Data Submittals New Horizons

Assuring the Safety & Enhancing the Success of ELV Payload Activities 8 Applicability NPR Applies to: Unmanned orbital and unmanned deep space payloads managed, launched, or developed in a joint venture with NASA The payload’s design, fabrication, testing, vehicle integration, launch processing, launch, planned recovery, etc. NEW HORIZONS on an ATLAS V NPR , paragraph P.2.b & c

Assuring the Safety & Enhancing the Success of ELV Payload Activities 9 Applicability (cont.) NPR Does NOT Apply to: Payloads that interface with a manned launch vehicle or spacecraft Payloads that will fly on suborbital launch vehicles Non-NASA payloads launched from Wallops Flight Facility where NASA is just providing range services In-flight spacecraft operational safety or mission success MESSENGER Assembly NPR , paragraph P.2.b, c, e & f

Assuring the Safety & Enhancing the Success of ELV Payload Activities 10 ELV Payload Safety Review Process Interfaces

Assuring the Safety & Enhancing the Success of ELV Payload Activities 11 PSWG Composition PSWG Chairperson - NASA KSC SMA Launch Services Division Safety Engineer. Co-Chairperson may be appointed for any mission Composition of the PSWG & member participation may vary based on: – project activities – technical issues – multi-Center project involvement – operational requirements e.g. selection of launch vehicle or processing facility DAWN NPR , paragraph i.( 7 )

Assuring the Safety & Enhancing the Success of ELV Payload Activities 12 Payload Safety Working Group Membership Mission PSWG w/ Chairperson System or Subject Matter Expert (As Needed) Ground OPS (As Needed) Launch Vehicle Contractor Safety Air Force 45/30 SW Range Safety Mission Center NASA & Contractor Safety *LSP LSIM * Invited participant KSC S&MA Launch Services Division (SA-D) Note: NASA Launch site safety organization will most likely chair

Assuring the Safety & Enhancing the Success of ELV Payload Activities 13 Each PSWG member Participate in the safety review and approval process Ensure compliance with all safety requirements for their area of responsibility and authority Review and provide comments to the project on deliverables within 30 days after submittal Assess and concur on tailoring and any waiver that is within their scope of responsibility Coordinate with the PSWG to resolve payload safety concerns and if needed, with the Agency Team Ensure that payload, facility, and payload/launch vehicle integration issues are disseminated to their organization and to other PSWG members LRO NPR , paragraph a – f

Assuring the Safety & Enhancing the Success of ELV Payload Activities 14 Each PSWG member Participate in PSWG activities Assess and concur on deliverables (plans, tailored requirements, hazard reports, Certificate of Safety Compliance, etc.) AURORA Scanning NPR , paragraph g, h

Assuring the Safety & Enhancing the Success of ELV Payload Activities 15 The PSWG Chairperson Manage & administer PSWG activities (meetings, schedule, etc) Ensure PSWG member participation Provide official PSWG signature (indicating concurrence from all PSWG members) for all deliverables and correspondence Ensure deliverables are available for review Ensure that the PSWG, Agency Team, & LSP representatives are invited to PSWG activities Ensure all comments to deliverables are organized and submitted to the project ≤ 35 days after submittal CALIPSO NPR , paragraph a – f

Assuring the Safety & Enhancing the Success of ELV Payload Activities 16 The PSWG Chairperson Ensure PSWG activities are documented - e.g. notices, action items, decisions, etc. Ensure distribution of final minutes Ensure PSWG participation by appropriate members at payload/launch vehicle integration working group meetings Schedule and conduct PSWG meetings concurrently with major project reviews and as required to meet the safety milestones of this program Ensure notification of the project safety schedule and changes GLAST solar panel NPR , paragraph g – L

Assuring the Safety & Enhancing the Success of ELV Payload Activities 17 The PSWG Chairperson (cont.) Ensure the Agency Team is informed of safety issues that may impede the safety review process Ensure that all safety related documents are accessible to the PSWG members, Agency Team, and other subject matter experts or technical authorities If the PSWG cannot reach consensus, coordinate with the NASA ELV Payload Safety Manager to establish a resolution approach Coordinate with the PSWG and the project to ensure implementation of recommendations, interpretations, and resolutions of any safety concern provided by the Agency Team New Horizons NPR , paragraph m – p

(18) Safety Review Process Major Events Complies with AFSPCMAN with some minor variations while meeting NASA project requirements

Assuring the Safety & Enhancing the Success of ELV Payload Activities 19

Assuring the Safety & Enhancing the Success of ELV Payload Activities 20 Flow of Activities and Deliverables NPR The safety review and approval activities are designed to coincide with the project management reviews required by NPR , e.g., PDR, CDR, & Pre- ship Review. Process and deliverable dates may be altered through advanced formal agreement between the Payload Project Office and the PSWG provided that safe processing, project schedule, and safety review input to Key Decision Points (as defined in NPR ) are not impacted. GOES - N NPR , paragraph 2.4.2

Assuring the Safety & Enhancing the Success of ELV Payload Activities 21 Timeline of ELV Payload Safety Reviews

Assuring the Safety & Enhancing the Success of ELV Payload Activities 22 A Payload Safety Introduction (PSI) Briefing SCHEDULE PSI as early as possible but no later than midpoint of the Preliminary Design Phase. First meeting of the PSWG (Concept Briefing). Payload project submittals: – As a precursor to the tailoring processes, identification of the safety requirement documents that are applicable to the project; previously approved waivers and alternative approaches, and known tailoring issues – Draft Systems Safety Plan providing a conceptual overview of the Systems Safety Program – Identification of known spacecraft systems and a preliminary assessment of potential hazards documented in a preliminary hazard list – A basic Ground Operations Flow Overview providing the location and timeline of major payload activities and tasks The information provided should be as complete as the technical maturity of the conceptual design and operations allow Deep Impact NPR , paragraph a

Assuring the Safety & Enhancing the Success of ELV Payload Activities 23 Timeline of ELV Payload Safety Reviews

Assuring the Safety & Enhancing the Success of ELV Payload Activities 24 Safety Review I SCHEDULE: Begins prior to PDR & completed ≤ 60 days after PDR or as necessary ensuring PSWG’s timely input to Key Decision Point C PSWG meeting in conjunction with PDR Payload project submittals due ≥30 days prior to the PDR meeting: – Final System Safety Plan – Tailored Payload Safety Requirements – Safety Data Package I PSWG shall: – Approve the final System Safety Plan – Discuss comments of Safety Data package I – Discuss the Tailored Payload Safety Requirements – Assess Preliminary Hazard Analysis and any Hazard Reports – Address any safety issues from PDR DAWN NPR , paragraph b.(1 – 3)

Assuring the Safety & Enhancing the Success of ELV Payload Activities 25 Safety Review I (cont.) The PSWG Chairperson shall provide the Payload Project Manager with: – Status of Safety Review I including any safety concerns following the PDR meeting – Assessment of the project’s safety efforts and identification of any safety concerns to support the project’s Key Decision Point C TOPEX/Poseidon NPR , paragraph b.(4,5)

Assuring the Safety & Enhancing the Success of ELV Payload Activities 26

Assuring the Safety & Enhancing the Success of ELV Payload Activities 27 Safety Review II SCHEDULE: Begins prior to CDR & completed ≤ 60 days after CDR or as necessary ensuring PSWG’s timely input to Key Decision Point D PSWG meeting in conjunction with PDR Payload project submittal items due ≥30 days prior to the CDR meeting: – Safety Data Package II – Final Tailored Payload Safety Requirements Payload project submittal items due at CDR: – Safety Action Tracking Log for review and concurrence to close completed actions MRO NPR , paragraph c.(1, 3)

Assuring the Safety & Enhancing the Success of ELV Payload Activities 28 Safety Review II (cont.) PSWG shall: – Discuss comments of Safety Data Package II – Address any safety issues from CDR – Review the project for any changes to the design, processing, or interfaces for new or increased hazards or safety issues The PSWG Chairperson provides the Payload Project Manager with: – Status of Safety Review II including any safety concerns following the CDR meeting – Assessment of the project’s safety efforts and identification of any safety concerns to support the project’s Key Decision Point D GOES - N NPR , paragraph c.(2, 4)

Assuring the Safety & Enhancing the Success of ELV Payload Activities 29

Assuring the Safety & Enhancing the Success of ELV Payload Activities 30 Safety Review III SCHEDULE: Begins with data submittal & completed at a PSWG meeting held ≥5 business days prior to Launch Services Program’s Ground Operations Review Payload project submittals: – Safety Data Package III Due ≥ 60 days prior to Safety Review III Finalized ≥ 30 days before hardware shipment to processing site – Safety Action Tracking Log – Safety Verification Tracking Log – Certificate of ELV Payload Safety Compliance PSWG verifies that all safety requirements have been satisfied or will be satisfied and waivers have been approved ODYSSEY over Mars’ south pole NPR 8715.X, paragraph e.(1, 2)

Assuring the Safety & Enhancing the Success of ELV Payload Activities 31 Safety Review III (cont.) The PSWG Chairperson and the ELV Payload Safety Manager shall sign the Certificate of ELV Payload Safety Compliance indicating that the project has safety approval to ship to the launch area The ELV Payload Safety Manager shall provide the Payload Project Manager with a letter ≤ 5 days after successful completion of Safety Review III. The letter shall: – Indicate that the project has successfully completed the payload safety review process per this NPR – Include a copy of the signed Certificate of ELV Payload Safety Compliance – Identify any conditions or constraints applicable to the safety approvals LUNAR Prospector NPR , paragraph e.(3,4) and 2.4.3

CERTIFICATE OF ELV PAYLOAD SAFETY COMPLIANCE

Assuring the Safety & Enhancing the Success of ELV Payload Activities 33 Once the payload is shipped After transportation to the launch area processing facility, the project shall: – Update the Safety Verification Tracking Log at least weekly (more frequently if needed to remove operational constraints) – Ensure the current Safety Verification Tracking Log is available – Ensure Technical Operating Procedures are approved 10 days prior to use OSTM/Jason II NPR , paragraph 2.4.4

Assuring the Safety & Enhancing the Success of ELV Payload Activities NASA ELV Payload Range Safety Requirements (NEPRSR) Template NASA desires a consolidated set of payload safety requirements Letter of Intent signed by NASA KSC SMA Director and the 30 th and 45 th SWs Chiefs of Safety (May 14, 2009) A jointly tailored AFSPCMAN with pertinent NASA safety requirements added – Range Safety changed to PSWG or local safety authority – Range User changed to Payload Project – Focuses on what safety requirements are needed for payloads Keeps AFSPCMAN paragraph numbers In a columnar template to become a baseline for tailoring by each project (payload mission) displaying tailoring decisions (C,T, I, N/A) 34

Assuring the Safety & Enhancing the Success of ELV Payload Activities 35 Tailoring Process Purpose: Ensure oversight of Agency requirements and provide Centers and Project Managers with the authority and flexibility to complete their tasks. Definition: The process of assessing the applicability of requirements and evaluating potential compliance to generate a set of specific requirements for the project. The Payload Project Office & its system safety engineer work with the PSWG to identify applicable requirements The PSWG Chairperson and Agency Team ensure consistency The PSWG Chairperson and the ELV Payload Safety Manager ensure appropriate authorities approve (sign) each tailored document. At a minimum, these include the Payload Project Manager, SMA Technical Authorities (project and ELV Launch) and Air Force Range Safety. Deep Space NPR , paragraph

Letter of Intent between AF and NASA regarding joint tailoring of AFSPCMAN

Assuring the Safety & Enhancing the Success of ELV Payload Activities

NEPRSR AFSPCMAN still applies in its entirety to NASA payloads launching from Air Force Ranges even though the paragraph or section is not included in the NEPRSR Air Force Range Safety Authority is unchanged Air Force Range Safety participates as a member of the PSWG Many policies, processes or responsibilities that do not apply to payloads or are transparent to them are not included Safety submittals and safety become more consistent Found on NASA PBMA website 38

Assuring the Safety & Enhancing the Success of ELV Payload Activities 39 Noncompliance (ELS/Waiver) Process ELS’ during the NEPRSR tailoring process do not require a NASA ELS/Waiver Request Form ELS’ proposed after the tailored NEPRSR has been signed require a NASA ELS/Waiver Request Form When a requirement cannot be met (not deemed an ELS) it is considered a waiver and requires a NASA ELS/Waiver Request Form GOES N NPR , paragraph

NASA ELV Payload Safety ELS/Waiver Request

(41) Content of Deliverables

Assuring the Safety & Enhancing the Success of ELV Payload Activities 42 Content of Deliverables The payload project coordinates with the PSWG to: – Ensure that the content of the deliverables satisfies the requirements of NPR and AFSPCMAN (under transition to the NASA ELV Payload Range Safety Requirements (NEPRSR) template) – Ensure that the level of technical detail is commensurate with the project’s life cycle phase – Ensure that changes are annotated for easy location and verification AIM fully deployed NPR , paragraph 2.5.1

Assuring the Safety & Enhancing the Success of ELV Payload Activities 43 A Payload Safety Introduction Briefing Overview of the System Safety Program Identification of organizational roles and responsibilities Identification of applicable safety requirements and compliance documents Description of payload, instruments, and anticipated GSE Description of the flight path and planned recovery activities Identification of potential payload/launch vehicle interfaces and unique GSE Identification and preliminary assessment of potential hazards Overview of Draft Tailored Payload Safety Requirements DAWN NPR , paragraph a - h

Assuring the Safety & Enhancing the Success of ELV Payload Activities 44 A Payload Safety Introduction Briefing (cont.) Identification of any potential noncompliances Any potential hazardous failure modes, failure probability, and performance characteristics during ground operations Identification of planned studies and analyses that support safety requirements Description of processing flow and anticipated schedule Identification of facility requirements Identification and discussion of potential contingency operations Overview of the Mishap Preparedness and Contingency Plan(s) Recommendations for future safety Technical Interchange Meetings, reviews, working groups, subject matter expert support, resolution of unmet requirements, Design Reviews, and other topics as deemed necessary. MRO NPR , paragraph i - p

Assuring the Safety & Enhancing the Success of ELV Payload Activities 45 A System Safety Plan Purpose: Details the payload project’s system safety program consistent with NPR , AFSPCMAN and MIL-STD- 882, DoD Standard Practice for System Safety A system safety roles and responsibilities section describing: – Interfaces & lines of communication – Review and approval process with approving authorities identified – Identification of key system safety personnel & responsibilities – Activities required to identify, evaluate, & eliminate or control hazards & to minimize risk AIM NPR , paragraph a

Assuring the Safety & Enhancing the Success of ELV Payload Activities 46 A System Safety Plan (cont.) System Safety Program Milestones in reference to major project milestones System Safety Data identified by title, number, date, and means of delivery or process for accessibility Identify System Safety interfaces between: – Other applicable safety disciplines (i.e. nuclear safety, facility or institutional safety, Range Safety, explosive and ordnance safety, chemical and biological safety, radiation safety, hazardous materials safety, fire safety, laser safety, software safety, etc.) – Design systems engineering – Other support disciplines (i.e. maintainability, quality, reliability, software development, human factors engineering, industrial hygiene, etc.) – All system integration and test disciplines CALIPSO NPR , paragraph b - d

Assuring the Safety & Enhancing the Success of ELV Payload Activities 47 Preliminary Hazard Assessments & Hazard Reports Purpose: Utilize system safety engineering and analyses to identify and document potential hazards and verification for how those hazards will be eliminated or controlled At the Payload Safety Introduction Briefing, they will reflect the conceptual design, planned interfaces, operations, and identify potential hazards Hazard Reports will identify: – The hazard and mechanism for occurrence and resulting outcome – The worst case severity and probability, mitigations, and severity and probability with mitigations in-place Hazard Reports are included in each Safety Data Package Deep Impact NPR , paragraph 2.5.5

Assuring the Safety & Enhancing the Success of ELV Payload Activities 49 Safety Data Package I Descriptions of hazardous and safety critical flight hardware and software, systems, components, materials, and GSE that reflects the PDR-level design and operations scenario A description of the payload and mission Initial descriptions of all payload systems including hazardous and safety critical subsystems, their operation, and interfaces Preliminary hazard reports and summaries of the hazard analyses Information identifying compliance to the Tailored Payload Safety Requirements For previously launched buses, identification and description of safety- related problems, mishaps, or failures that occurred during fabrication, testing, processing, or integration that could affect the safety of the flight hardware or software, GSE, personnel, or other NASA resources THEMIS NPR , paragraph 2.5.6

Assuring the Safety & Enhancing the Success of ELV Payload Activities 50 Safety Data Package II Updated Safety Data Package I information that reflects the CDR-level design & operations Updated description of payload & mission Updated Hazard Reports Descriptions of hazardous and safety critical subsystems, their operation, and updated methods of compliance to the Tailored Payload Safety Requirements Detailed information of safety features, inhibits, monitoring systems, and their control and status during all processing phases Supporting plans, studies, and reports (provided or referenced), upon request Description of GSE, summary of hazardous, non-hazardous, and safety critical operations, list of hazard reports, and supporting hazard analyses for operations performed in NASA facilities, NASA contracted facilities, and launch site facilities (i.e., Ground Ops Plan) A cross-reference identifying the disposition of review comments and indicating any changes NPR , paragraph 2.5.7

Assuring the Safety & Enhancing the Success of ELV Payload Activities 51 Safety Data Package III Includes all the Safety Data Package updates with all comments addressed, incorporate all changes that reflect the as-built configuration and planned processing activities As-built description of payload and mission Final Hazard Reports Updated descriptions of hazardous and safety critical subsystems Updates to supporting plans, studies, and reports; required summaries of test results provided upon request Record of test failures, anomalies, mishaps involving qualification hardware, flight hardware, GSE, software (if used for hazard control), and an assessment of the resolution and safety implications of these events A signed copy of approved safety waivers A cross-reference identifying the disposition of review comments since previous submittal and indication of any changes NPR , paragraph 2.5.8

Assuring the Safety & Enhancing the Success of ELV Payload Activities 52 A Safety Verification Tracking Log (SVTL) Documentation (in a tabular format) of the status of safety verifications identified in the Hazard Reports Information for each safety verification: – tracking number – brief description of the verification, – Hazard Report number(s) – Any constrained operation(s) – If independent verification is needed – Scheduled and actual completion dates – Method of closure, status, and any comments “Closed” - mitigations are in place and that the safety risk is controlled as specified in the Hazard Report. Safety verifications often are best performed at a certain time in the payload processing flow. Submitted at Safety Review III and used to ensure the completion of safety verifications even after transportation to the launch area processing site Deep Space NPR , paragraph 2.5.9

Safety Verification Tracking Log

Assuring the Safety & Enhancing the Success of ELV Payload Activities 54 Safety Action Tracking Log (SATL) Documentation (in tabular format) of the status of safety- related actions from safety reviews and meetings Information for each safety action: – action number – brief description – responsible person(s) – scheduled and actual completion dates – status and any comments Submitted at Safety Review II and III and may also be used by the PSWG Chairperson to record and track actions DAWN NPR , paragraph

Assuring the Safety & Enhancing the Success of ELV Payload Activities 56 Program Website

Assuring the Safety & Enhancing the Success of ELV Payload Activities 57 Program Website

Assuring the Safety & Enhancing the Success of ELV Payload Activities 58 Program Website

Assuring the Safety & Enhancing the Success of ELV Payload Activities 59 Contacts & Questions? Cal Staubus, ELV Payload Safety Manager – Work: – Cell: – Jennifer Mirenda, Senior Safety Engineer, ManTech KSC – Work: –