Concept for Room Layout. Customer Needs for Room Layout/Setup Safe to UseEasy to Use Easy to Modify/ Work on Compressor Easy to Learn.

Slides:



Advertisements
Similar presentations
Lean 6S Training Mercy Medical Center Welcome to Lean 6S Training.
Advertisements

Customer Satisfaction No.1. Pioneer Electronics Service (PSE)
SONATA HYBRID Battery Dismantling Manual. Precautions for handling the hybrid battery Wear rubber-insulated gloves. Use insulated tools. Do not have any.
PARKER BOILER PARKER BOILER HOT WATER PIPING SYSTEM 1. 3 way valve and O.S.A. reset. 2. Single boiler piping schematic. 3. Single boiler with 3 way valve.
LAB WORKOUT Classroom Management. Possible Applications Design classroom labels  For sample labels, visit
MSD 1 P12453 Detailed Design Review Markus Holzenkamp Robin Leili Cody Anderson 5/17/2015 Detailed Design Review 1.
P10457: D-R Process Improvement Compressor Assembly Area Patrick Muldoon Introductions and Welcoming Comments.
Compressor ReVamp and Fabrication PO9452. Update Revised Concept Generation Selected some concepts Scheduled Conference call with Dresser Rand Schedules.
Fresh Bread and Roll Scaling Room MSD II Final Presentation Erik Webster, Cecilia Enestrom, Kate Gleason, Grant Garbach, Andrew Tsai May 15 th, 2009.
The Elementary Science Classroom Teaching Science vs vs TEACHING SCIENCE.
Compressor ReVamp and Fabrication PO9452. Update Revised specs Continued concept generation Researched range of educational applications for compressor.
Challenger Center Cooling Tower Performed By: Dianah Dugan Alex Saputa.
PowerPoint Intermediate Exercises Macro Circle Organization Chart Inserting and modifying and organization chart. Superior Manager Direct Report Manager.
PROJECT AND STUDY DRAWINGS & DIAGRAMS
Common Page Design. Graphics and Tables Uses: Objects Numbers Concepts Words.
 Aims  To have an understanding of the significance of safety signs  Objectives  To label at least three signs  List at least three signs that you.
Electric Load Estimating 2011 SWEDE Conference. Customer’s Connected Load & Electric Utility’s Demand Load Customers provide the utility company with.
How to Make a Science Board. Key Information For your science project, you need to prepare a display board to communicate your work to others. You will.
Think about this…… Do you think chimpanzees can learn American Sign Language? How about use a computer? Why or why not?
PRISM Preparation Health and Safety Checklist. Area #1 Classrooms ☺ Dental hygiene ☺ Toy safety/storage ☺ Durability/condition ☺ Organization of space.
5S Improving safety & efficiency
PowerPoint Presentation By: David Larson. IPA’s Identify Components of Visio 2010 interface, navigate a Visio drawing, and get help Using Visio. Manipulate.
Offices May 2nd, 2011.
1 Name:Group 9 Teacher assessment Overall level abcabcabcabcabcabc Teacher commentMerits / LOC’s Target.
What is “Communicating Technical Design”?. You tell me Take a moment and write a description of what is “communicating technical design”. Break into groups.
The Safe Transfer of Pressurized Gas. Collect the Necessary Tools and Equipment Safety Glasses for EVERYONE SCUBA Tank filled to 3000 psi Fill Station.
Preparation for Design Planning 1. Study trends 2. Update on design and equipment possibilities »personal visits »read catalogs & trade journals »ask others.
1 User Manual. 2 A user manual is a technical communication document intended to give assistance to people using a particular system A user manual is.
Welcome To Word Day 2: Modules 3 & 4 Instructor: Mary Magellan Class will start at approximately 8:05 AM.
Technical Drawing Drawings clearly defines requirements for engineering items. A type of drawing used in the transforming of an idea into physical form.
Designing Process Layouts Step 1: Gather information: –Space needed, space available, importance of proximity between various units Step 2: Develop alternative.
Unit 12 Agricultural Mechanics
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number: P
Design Question 6 What will I do to establish and maintain classroom rules and procedures? Page 199.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number:
Safety, Security & Emergency Procedures Guide Section 500
Density Lab Equipment, Procedures & Safety Density Lab Equipment, Procedures & Safety.
An Inspector’s Primer Larry Johnson Harris County Larry Johnson Harris County.
ING WILLIAM AMUNA DIRECTOR TECHNICAL SERVICES VOLTA RIVER AUTHORITY GHANA VOLTA RIVER AUTHORITY.
1 Lean Office - 5S and Visual Controls
Electra 2015 Overhead power line design tool Create digital terrain model Design power line layout Draw poles in layout or profile Inspect and label.
Bell Ringer (2nd, 4th period)
Working with Resistive Heating Tape.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
Matthew Johnson Harris County Matthew Johnson Harris County.
P13631: Gravity Fed Flow Process Control Teaching Aid An RIT education couples theory in lecture with practical application in lab. In the past, carts.
Getting Ready to Teach Wong, pp Classroom Management Organize students, space, time, and materials Have procedures and routines that structure.
Floatless Liquid Level Controllers. No float! Large connection opening is not necessary. No worry about inside clearance.
Lab Notebook Setup. Title Page Fill out in permanent ink AP Biology Lab Notebook Name Period Mrs. Perry, Room
P08452: Reciprocating Compressor Install, Revamp, and Interface Dr. Margaret BaileyFaculty Guide Garry StudleyProject Manager Dave Rigolo Lead Engineer.
Page 46 Sponge *** JUST WRITE THE INTERVALS YOU WOULD USE TO MAKE A FREQUENCY TABLE….DON’T MAKE TABLE 1) Number of cups of coffee drank in a week….. 5,
5S Improving safety & efficiency. 5S Translation Step JapaneseLiteral Translation English Step 1:SeiriClearing UpSort Step 2:SeitonOrganizingSet In Order.
Workplace Organization (WPO) and Visual Controls (VC)
Create a PowerPoint Resume Send projects to
Presented by.
Today you need: Have out the following items on your desk:
7th Grade Mr. Hetrick’s Life Science Class
Energy Which question should we study next? How does Energy move?
Tools and equipment needed for this task..
Wednesday 2/22/17 Fill out the weekly schedule
Way to Determine the Layout of your Warehouse with Efficient Planning
Architectural Drawing
“WAR ROOM” CONCEPT Purpose: Post on the Walls: Use for: Need:
Cafeteria exit exit Entrance to media lobby 12
Laboratory Safety and Procedures
Parker domnick hunter. Safety of Electrical and
Profit Tools IT Infrastructure Improvement
MSD I Review February 22, 2008 (9:00 AM) Room
5 functions of the 5S Methodology Example of the 5s Methodology
Haynes Bros. Ltd. Environment, Health & Safety
Presentation transcript:

Concept for Room Layout

Customer Needs for Room Layout/Setup Safe to UseEasy to Use Easy to Modify/ Work on Compressor Easy to Learn

Safety Caution Signs Caution Tape Caution Signs On Compressor Safety Procedure Chart Safety Equipment Set of Safety Glasses for Room Set of Ear Plugs For Room

Easy to Use Labels Compressor Inlet and Outlet Labels List of Sensors Organize Organize Tool Rack Organize Interface Desk

Easy to Modify/ Work on Compressor Have at least 2ft Space around compressor Have tools readily accessible Have a table Dedicated For working on Compressor parts Have drawing of Room layout so everything can be found easily

Easy to Learn from Post P-V/ T-V diagrams of gas cycle Have How-To manuals for LabView Interface Post schematic of Compressor working