Presented to: MPAR Working Group By: Jim Williams, Director of Systems Engineering, Operations Planning Date: 11 September 2007 Federal Aviation Administration.

Slides:



Advertisements
Similar presentations
Sustainable Energy – Sustainable ATC Surveillance Workshop – Eurocontrol, Brussels, April 2010 Agenda Item Wind Turbine Interference – Possible Mitigations.
Advertisements

1 Federal Aviation Administration Right Sizing Kick-off – v0.1 March 17, 2009 Goals Today Shared understanding of NextGen Sources of information Shared.
Program Management Organization
Session 6: Way Ahead to Address MPAR Risk Reduction— Implementation Strategy and Interagency Management Approach Moderator: Dr. Paul D. Try, Science and.
Presented to: Right Sizing Team By: Ken Hamm, AJP-6830 Aviation Weather Office Date: July 14, 2010 v0.1 Federal Aviation Administration Aviation Weather.
Presented to: MPAR Symposium By: Jim Williams, Air Traffic Organization – Systems Engineering and Safety Date: October 11, 2007 Federal Aviation Administration.
ACI-NA 2007 Environmental Affairs Conference Colorado Air Traffic Control Modernization Update Travis Vallin, Director Colorado Aeronautics Division.
Presented to: By: Date: Federal Aviation Administration Early Tests of Aircraft Tracking on NWRT PAR Working Group William Benner, Weather Processors Team.
Date: Federal Aviation Administration FPAW – Segment 4 Data Centric Weather October 31, 2012 Presented to: Friends and Partners of Aviation Weather (FPAW)
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
Presented to: MPAR Symposium By: William Benner, Aviation Weather Group, Operations Planning Date: 12 October 2007 Federal Aviation Administration Multi-function.
Presented to: Joint Interagency Weather Research Meeting Review By: Victor Passetti, Operational Readiness and Impact Team Date: July 19, 2010 Federal.
Presented to: MPAR Symposium II By: James Williams – Director, Systems Engineering and Safety Date: 17 November 2009 Federal Aviation Administration Multifunction.
Presented to: Phased Array Radar Working Group By: Jim Williams Date: 5 December 2006 Federal Aviation Administration Briefing to the PAR-WG FAA Systems.
Delivering NextGen June 5, 2015 Maryland Airport Managers Association Presented by Carmine Gallo, Eastern Regional Administrator Federal Aviation Administration.
1 Federal Aviation Administration Mid Term Architecture Briefing and NextGen Implementation 1 Federal Aviation Administration Mid Term Architecture Briefing.
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
Future of Surveillance in the National Airspace System
MIT Lincoln Laboratory 2007 MPAR-1 JSH 5/2/2007 Session 2: Current State of Military Investment in PAR Panel Lead: Dr. Jeffrey Herd (MIT LL) Panelists:
Multifunction Phased Array Radar (MPAR):
Federal Aviation Administration Surveillance and Broadcast Services By: Rick Castaldo Date: January 9, 2007 Surveillance and Broadcast Services Briefing.
Alternative Positioning, Navigation, and Timing Initiative
Presented to: Aerospace Control and Guidance Systems Committee By: Stan Pszczolkowski, Manager, System Analysis Division Date: March 1, 2006 Federal Aviation.
NAS Acquisition Programs
Federal Aviation Administration Valuation of NextGen Capacity Benefits A Consumer Surplus Approach to the Monetization of NASPAC Results For: INNOVATIONS.
Presented to: By: Date: Federal Aviation Administration FY12 Infrastructure Roadmap Update Enterprise Services (Supporting Activities) NetCentric Demos/Prototypes.
Presented to: Aerospace Control and Guidance Systems Committee By: Stan Pszczolkowski, Manager, System Analysis Team Date: October 11, 2006 Federal Aviation.
2007 ICNS-1 MEW 5/2/2007 MIT Lincoln Laboratory MPAR Trade Studies Mark Weber 12 October 2007.
FAA Aviation Weather Group
Federal Aviation Administration Acquisition Categories Presented by: Daniel V. Kinder Director, AJT Program Operations Chair, AEB V&V Workgroup Member,
Presented to: MPAR Working Group By: Garth Torok, Weather Processors Group, Aviation Weather Directorate Date: 21 June 2007 Federal Aviation Administration.
FAA NAS Enterprise Architecture – Informing Future Challenges in V&V for NextGen 2009 V&V Summit November, 2009.
DHS Airspace Surveillance Requirements MPAR Symposium Randel Zeller Science and Technology Directorate Department of Homeland Security Director, Interagency.
Federal Aviation Administration NextGen Test Bed Capabilities and Future Plans Presented by: Vince Lasewicz Laboratory Services Group Date: 11/05/09 William.
Presented to: Japanese Meteorological Agency By: Tammy Farrar Weather Policy and Requirements Group Date: March 24, 2009 Federal Aviation Administration.
1 Federal Aviation Administration November 3, 2010 FL NextGen Test Bed Overview Andras Kovacs.
FAA System-Wide Information Management Program Overview for SWIM-SUIT Public Lauch Donald Ward Program Manager FAA SWIM Program April 2007.
Presented to: By: Date: Federal Aviation Administration NextGen Weather Evaluation Capabilities (NWEC) Environment National Weather Service Tri Nguyen,
Presented to: By: Date: Federal Aviation Administration Weather System Engineering Issues Friends & Partners in Aviation Wx Raymond Moy, Air Traffic Organization,
Federal Aviation Administration TAIWIN By: Jim Riley, ANG-E282 To: Icing Wx Tools Meeting Date: 11/19/13 – 11/21/13.
Federal Aviation Administration NextGen Integration & Evaluation Capability (NIEC) Presented by: Vince Lasewicz Laboratory Services Group Date: 01/07/10.
Update on Multifunction Phased Array Radar (MPAR)
Presented to: NASA Applied Sciences Weather Program Review By: Warren Fellner, Aviation Weather Office Date: November 18, 2008 Federal Aviation Administration.
1 Presentation to ASAS TN2 17 th September 2007 Mel Rees Head of Surveillance EUROCONTROL EUROCONTROL SURVEILLANCE STRATEGY.
What Is Multilateration Triangulation System Uses Aircraft Transponder Multiple Ground Receivers Central Computer Calculates & Displays Aircraft Position.
Multifunction Phased Array Radar PAR Work Group Magda Batista-Carver September 11, 2007 Legacy Radar Lifecycle Cost Data Analysis Update Magda Batista-Carver,
PAR Study-1 JSH 3/28/2005 MIT Lincoln Laboratory MPAR Cost-Benefit Discussion Mark Weber Jeff Herd 14 December 2009.
Presented to: By: Date: Federal Aviation Administration Multifunction Phased Array Radar PAR Work Group Magda Batista-Carver June 21, 2007 Radar Operations.
Office of the Federal Coordinator for Meteorology OFCM Assessment of MPAR Capability to Meet Agency Needs Jud Stailey, OFCM Executive Secretary, MPAR EC.
Joint Planning and Development Office (JPDO) Col Mark Weadon Air Force Weather Deputy for Federal Programs May 17 th,
Federal Aviation Administration FPAW October Delivering NextGen Next Generation Air Transportation System Presented to: FPAW By: Alfred Moosakhanian,
….Airplanes …As a Network….
1 Overview of JPDO and the Weather IPT Mark Andrews Weather IPT Lead July 13 th, 2006.
By: Date: Federal Aviation Administration NextGen Overview Storyboard 10 th Annual Verification & Validation Summit Harry William Bilicki September 24.
MPAR Symposium / Implementation Strategy MPAR Risk-Reduction Implementation Strategy Fiscal Year RDT&E NSSL, MIT/LL, others.
ADS-B An Industry Perspective New Technologies Workshop Washington, DC January 10, 2007.
Presented to: By: Date: Federal Aviation Administration Research To Operation FPAW Richard Heuwinkel October 9, 2008.
Multifunction Phased Array Radar (MPAR) Update 1ICMSSR 12/16/11 ICMSSR Meeting December 2011 Doug Forsyth, Co-chair, WG/MPAR.
Presented to: By: Date: Federal Aviation Administration FY11 Infrastructure Roadmap Update Enterprise Services (Supporting Activities) NetCentric Demos/Prototypes.
AVIATION WEATHER Presented by: John Staples, Director of Flight Service Program Operations October 13, 2004.
Federal Aviation Administration System Wide Information Management SWIM Implementing Programs (SIPs) Status Presented to: Demonstrations and Prototypes.
Presented to: By: Date: Federal Aviation Administration Friends and Partners in Aviation Weather Michele Merkle, Federal Aviation Administration Director.
Air traffic control How Stressful is that?.
The Right Radar Backup for ADS-B
MPAR Multifunction Phased Array Radar Multi-Purpose Airport Radar
NextGen and Its Impact on Performance
FAA Systems Engineering Directorate
EUROCONTROL SURVEILLANCE STRATEGY
TDWR Measurement Capabilities
Bringing Large Commercial Airport Capabilities to Your Local Community
Presentation transcript:

Presented to: MPAR Working Group By: Jim Williams, Director of Systems Engineering, Operations Planning Date: 11 September 2007 Federal Aviation Administration Technology Research and Development Multi-function Phased Array Radar (MPAR)

Multi Function Phased Array Radar 2 Federal Aviation Administration 11 September 2007 En Route Terminal Surface Replace ASRs at mortality Add M/LAT to ASDE-3 sites Replace ASR-7s Replace ATCBI-4/5s Next Generation (NEXTGEN) Surveillance Retain beacons as backup Retain reduced set of beacons as backup Implement NAS-Wide ADS-B New Beacon (limited deployment) New Beacon New Primary Radar Decommission remainder Decommission all incl. TIS-B, FIS-B) 7 X X Decommission primaries X Use M/LAT for PRM NEXTGEN SVT A A 77A PRM-A Remove surface primary radars ASDE-X (incl. ADS-B) 76 WM/LAT Remove surface primary radars 76 RWSL WM/LAT ATCBI-6 LRR ATCBI-4/5 MODE S ASR-9 ATCBI-4/5 ASR-8 ASR-11 ASR-7 RWSL ASDE-X ASDE-3 MODE S ADS-B PRM E-SCAN Surveillance Roadmap (V1.6d, 08/20/2007) 28AvA52

Multi Function Phased Array Radar 3 Federal Aviation Administration 11 September 2007 EA Surveillance Roadmap Key Decision Points 77 (2011) - Decision to implement the NEXTGEN primary radar systems which includes weather surveillance 77A (2014) - Decision for replacement of legacy primary radars (ASR-8, ASR-9), based on air traffic safety and weather surveillance requirements 95 (2024) - Decision for replacement of terminal primary radars (ASR-11 PSR) and removal of terminal beacons (ASR-11 MSSR) Roadmap Assumptions –En route primary radars (LRR) not required for normal ATC operations

Multi Function Phased Array Radar 4 Federal Aviation Administration 11 September 2007 Surveillance Assumptions Backup to mitigate loss of on-board GPS positioning source required –“Surveillance/ Positioning Backup Strategy Alternatives Analysis Report” completed in January 2007 Retain all en route beacons (~150 monopulse systems with selective interrogation) Retain limited set of terminal beacons at Operational Evolution Plan (OEP)/High Density Terminals(~50 locations) All terminal primary radars are retained (Used as safety (ATC) backup) The Backup Strategy retains the Primary and Secondary Radars at selected locations past Additional technology refresh/SLEP work is required

Multi Function Phased Array Radar 5 Federal Aviation Administration 11 September 2007 Non FAA Sensors PIREPS 85 AWOS/ASOS /AWSS FAA Sensors TDWR LLWAS-RS/NE 37 WSP TR1 TDWR SLEP 1 Dual Pol & NEXRAD Product Improvement ASR-9/11 WX Channel NEXRAD NEXRAD SLEP or Replace with NextGen Wx Radar Capability ASR-WSP TR NextGen Terminal WS Radar Implementation SAWS 72 F-420 DASI WSP TR2 25 NLDN & 92 Likely combined 26a 26b SLEP/Replace TDWR SLEP 2 TDWR SLEP 3 60a NextGen RWI Solution Set Mandatory Equipage Wx Sensors (for fully capable aircraft) Enhanced Wx Aircraft Obs Evaluate lower troposphere aircraft Wx Obs MDCRS NextGen RWI Solution Set Auto PIREP Entry ERAM 43 Weather Roadmap (V1.6d, 08/20/2007) 77a 28 AvA 10 WSP TR3 84 (* reference the Surveillance Roadmap for Decision Points 77 and 77a) * * * *

Multi Function Phased Array Radar 6 Federal Aviation Administration 11 September 2007 EA Weather Roadmap Key Decision Points 77 (2011) Decision for replacement of legacy primary radars (ASR-8, ASR-9), based on air traffic safety and weather surveillance requirements 77A (2014) Decision to implement the NEXTGEN primary radar systems which includes weather surveillance 84 (2016) – Decision to decommission ground-based wind shear capability (TDWR, WSP & LLWAS-RS/NE and replace TDWR with less expensive weather radar) 91 (2018) – Decision to implement NextGen wind shear capability (replacing TDWR, WSP & LLWAS with less expensive weather system) 92 (2018) – Investment Decision for NEXRAD (SLEP or replace with NextGen Wx Surv capability)

Multi Function Phased Array Radar 7 Federal Aviation Administration 11 September 2007 MPAR R&D Funding (expected) FY07 - $0.38M –FAA Weather Algorithm Study (MPAR impact) –Terminal Surveillance Radar Requirements Study (ADS-B Back-up) –Preliminary Architecture refinement (previous year funding) –SE Support (CONOPS development, O&M cost study) FY08 - $0.50M (NNEW) –Prototype T/R module fabrication and test –Architecture performance/cost risk reduction effort –SE Support (trade studies, CONOPS development, etc.) FY09 - $4.90M (RWI) –Initiate MPAR Pre-prototype Development (requirements, design) –Continue performance/cost risk reduction efforts Projected Out-year FY10 - $ 6.7M FY11 - $11.0M FY12 - $12.0M FY13 - $22.0M (FAA only) (Other Agency contributions expected to support the cost of full MPAR R&D effort)

Multi Function Phased Array Radar 8 Federal Aviation Administration 11 September 2007 BACK-UP SLIDES