PACS SVR 22/23 June 2006 Test Campaigns1 Overview of PACS Test Campaigns Helmut Feuchtgruber MPE.

Slides:



Advertisements
Similar presentations
PACS SVR22/23 June 2006 Erich Wiezorrek, MPE Test Facility Capabilities EGSE.
Advertisements

PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching.
Status update of ASM on Swarm Charlie Swarm 4th DATA QUALITY WORKSHOP 2 December 2014 GFZ Potsdam Jean-Michel Léger.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PACS Management, …1 PACS Management, Funding and Schedule Otto H. Bauer MPE Garching.
PACS IHDR, Garching 12/13 Nov 2003 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, A. Böhm, A. Bohm (Hardware) R. Vavrek, U. Klaas (ICC) J. Katzer,
PACS IHDR 12/13 Nov 2003 PACS Instrument Overview1 Instrument Design/Development Overview and System Performance PACS Instrument Overview A.Poglitsch MPE.
Philae Status and News Venezia; 30 st of March th Philae Post-Launch Workshop.
PACS IIDR 01/02 Mar 2001 Herschel PACS SPU - IAC1 Herschel PACS - IIDR SIGNAL PROCESSING UNIT (SPU) HW Unit, Start-up SW and Low-level SW Drivers José.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.
PACS IBDR 27/28 Feb 2002 SPU High Level Software1 H. Bischof, A.N. Belbachir (TUVIE) F. Kerschbaum, R. Ottensamer, P. Reegen, C. Reimers (UVIE)
PACS SVR22/23 June 2006 PACS Thermal Behaviour1 PACS Thermal Behaviour Tests T. Müller, H. Feuchtgruber, A. Contursi, Cs. Kiss, Sz. Csizmadia.
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
PACS SVR22/23 June 2006 FM IST1 PACS FM Tests at Integrated Satellite Level H. Feuchtgruber with inputs from the PACS Operations Team: D. Cesarsky, H.
AMS02 TIM CAB Project Status JSC, January 2007 Prepared by H. Cuesta / G. Muñoz.
PACS IIDR 01/02 Mar 2001 PACS  -ISVR 1  -ISVR Recommendations Introduction and Close-out A. Poglitsch.
PACS IQR 13 Jan 2005 PACS OBSW1/33 PACS On-board Software & User Manual A. Belbachir (UVIE/TUVIE, SPU) H. Feuchtgruber (MPE, SE) A. Mazy (CSL, DMC) S.
PACS IQR 13 Jan 2005 IHDR Close-out1 Close-out of IHDR: Concerns / Recommendations A. Poglitsch.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
PACS SVR38/9 Nov 2007 Commissioning Phase1 Commissioning Phase H. Feuchtgruber.
FM-ILT Results: Mechanisms FM1 Chopper and Calibration Sources Markus Nielbock (MPIA) Babar Ali (IPAC) Jeroen Bouwman (MPIA) Helmut Dannerbauer (MPIA)
PACS IIDR 01/02 Mar 2001 On-Board Data Compression1 On-Board Data Compression Concept A. N. Belbachir Vienna University of Technology.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
PACS IQR ESTEC, 13 Jan 2005 Documentation1 G. Wildgruber MPE Garching Introduction to Documentation - CQM/AVM EIDP and IQR-
PACS IQR 13 Jan 2005 First Assessment1 The PI’s Self-Assessment A. Poglitsch.
PACS SVR 2 18 Jan 2007 FM ILT: Mechanisms1 FM ILT Results: Mechanisms H. Feuchtgruber, H. Dannerbauer, N. Geis, C. Hartinger, U. Klaas, P. Royer.
# - 1 E. Andrews LAT Software Schedule  Key FSW Milestone Dates –PAST: Jan ‘02 / Jul ‘02 – Preliminary Design Review / Delta PDR May ’03 – Critical Design.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.
21-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : Flight Software Peter R Harvey Mars Atmosphere.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
Basic Input/Output System
PACS IBDR 27/28 Feb 2002 PACS Data Flow1 PACS Data Flow, Instrument Modes and Operations Helmut Feuchtgruber MPE.
PACS IBDR 27/28 Feb 2002 PACS Instrument Overview1 Instrument Design/Development Status and System Performance PACS Instrument Overview A.Poglitsch MPE.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
PACS IBDR 27/28 Feb 2002 OBSW Simulation1 PACS OBSW Simulation/Test A.Mazy (CSL), S.Pezzuto (IFSI), A.N.Belbachir (TUVIE), H. Feuchtgruber (MPE)
PACS SVR II – SPU HLSW Garching, 18th Jan 2007 prepared by R. Ottensamer and C. Reimers.
PACS SVR38/9 Nov 2007 System Testing1 Tests on Satellite Level H. Feuchtgruber.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
Herschel EQM – Results and Lessons Learnt6/7 Feb 2006 PACS Overall Analysis1 Overall PACS EQM IMT Analysis Contributions by PACS ICC.
PACS IIDR 01/02 Mar 2001 EGSE1 Otto H. Bauer MPE.
PACS SVR22/23 June 2006 Warm Electronics1 Warm Electronics: Components/Subsystems Test Results B. Voss PACS SVR.
Ozone Mapping and Profiler Suite Export Control Notice - Export or re-export of information contained herein may be subject to restrictions and requirements.
PACS IBDR 27/28 Feb 2002 PACS ICC1 ICC (EGSE, IA/QLA, HCSS) Otto H. Bauer MPE Garching.
1 Pertemuan 3 Operating Cisco IOS Software. Discussion Topics The purpose of Cisco IOS software Router user interface Router user interface modes Cisco.
PACS IHDR12/13 Nov 2003 Warm Electronics1 Warm Electronics: Overview, Interfaces, Grounding and EMC Martin von Berg PACS IHDR.
PACS IIDR 01/02 Mar 2001 PACS Grounding Scheme and EMC1 Grounding Scheme and EMC Matthias Rumitz, MPE.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PA/QA Status1 O.H. Bauer MPE Garching PA/QA Status.
Status of the DSP/ASPOC EM
Double Star: Experiment Activities
SPF MAG Quarterly Report – Feb 2015
I&T&C Organization Chart
EM pre-integration review
EPU load – same as SIU load except…


Sentinel-2 Status Update



Integration & Test Instrument Operations Coordination

Presentation transcript:

PACS SVR 22/23 June 2006 Test Campaigns1 Overview of PACS Test Campaigns Helmut Feuchtgruber MPE

PACS SVR 22/23 June 2006 Test Campaigns2 AVM Warm Electronics Tests AVM WE Tests from Sep-2002 to Jul-2004 Purpose: - OBSW development - Initial warm electronics communication verification - Development of basic instrument operational procedures (switch-on/off, memory load, 1355 link initialization etc.) - Development of EGSE software and operational procedures (memory load, packet recording, bus list switching etc.) Hardware: DPU AVM1, SPU EM, BOLC sim., DMC AVM

PACS SVR 22/23 June 2006 Test Campaigns3 CQM ILT Two cryogenic test phases: Jul 2004 and 6-Sep to 6-Nov 2004 (EMC: 4/6-Nov 2004) Instrument Hardware: - DPU AVM1, SPU AVM, BOLC AVM, DMC EM, WIH AVM - CQM FPU Instrument OBSW: - DPU V7.10, several updates during the tests until V SPU V11.1, short trial of V11.3, but roll back to V DMC V5.006, several updates during the tests until V5.023

PACS SVR 22/23 June 2006 Test Campaigns4 EQM IMT July/August x Short Functional Tests warm 19-Sep to 4-Nov in 2 periods (with and without He-leak) 7/9-Nov-2005 PACS/SPIRE parallel mode testing 21/25-Nov-2005 EMC Testing 7/9-Dec-2005 Straylight Testing 15-Dec-2005 SFT at ~HeI conditions Hardware: Refurbished DMC EM, otherwise same as during ILT OBSW:DMC OBSW V5.025, SPU V11.7, DPU V7.68

PACS SVR 22/23 June 2006 Test Campaigns5 FM Pre-ILT Since 22-Mar-2006 in several time periods Purpose: - Development and testing of CUS-based ILT test procedures and operational procedures - Verification of new DPU Boot SW - Dry-run and validation of IST test procedures - OBSW and MIB testing - SPU HLSW development - Support to PCSS development and testing Hardware: DPU AVM2 & CFM2, DMC EQM, BOLC sim., SPU EM, WIH EQM, FPU simulator (part time) OBSW:DMC V6.000-V6.005, SPU V12.2, DPU V8.31

PACS SVR 22/23 June 2006 Test Campaigns6 Future Test Phases (1) ILT without FPU: Continuation of Pre-ILT and integration of PACS FM warm units into test setup as they become available prior to the cold ILT ILT with FPU: SFT warm (before evacuation) Nominal ILT program (incl. SFT HeI, SFT HeII, entire IST test procedure and parallel mode test verification) ILT EMC phase Hardware: FM warm electronics and FM FPU OBSW: Flight versions

PACS SVR 22/23 June 2006 Test Campaigns7 Future Test Phases (2) AVM IST Purpose: - Verification of IST test procedures - Test of system related aspects (TBC) Hardware:DPU AVM1 (with new boot software), SPU AVM, BOLC AVM, DMC EM, WIH AVM Software:DPU OBSW V8.xx (TBD during ILT), SPU V12.x (TBD during ILT), DMC V6.xxx (TBD during ILT and due to DMC EM hardware constraints)

PACS SVR 22/23 June 2006 Test Campaigns8 Future Test Phases (3)  Instrument Delivery FM IST Purpose: - Verify that PACS instrument function and performance is preserved at satellite level, before, during and after environmental testing. This includes TV/TB and EMC tests. SVT 1&2 (content TBD by ESA/MOC) Hardware:FM warm electronics and FM FPU Software:Flight software, evtl. bugs/SPRs detected during ILT corrected