1 THE EMWIN TRANSITION April 27, 2004 Angelo Wade, NESDIS Ground Systems.

Slides:



Advertisements
Similar presentations
FIXED SATELLITE SERVICE and UAS (22 September 2010)
Advertisements

Deirdre Kann National Weather Service WFO Albuquerque Deirdre Kann National Weather Service WFO Albuquerque 7 th GOES User’s Conference October 21, 2011.
1 National Environmental Satellite, Data, and Information Service (NESDIS) Low-Rate Information Transmission (LRIT) IMPLEMENTATION and TRANSITION PLAN.
SCIP Conference Austin, Texas August 24, Migrating to Narrowband On July 2, 1991, The Commission released a Notice of Inquiry to gather information.
AMICUS and the National Union Catalogue Transition to OCLC Briefing NUC User Round Table.
GOES Direct Services. Topics  Direct Broadcast Services  GOES Data Collection Services  Search and Rescue.
1 April 13, 2010 NWS EMWIN TEAM EMWIN OVERVIEW. 2 What is EMWIN? The Emergency Managers Weather Information Network is a priority-driven computer weather.
NOAA COMMAND AND DATA ACQUISITION STATION
Time for a new standard - AS General Conditions of Contract
Himawari-8 Project Plans and Status. Background 2 NESDIS is implementing a capability to ingest Advanced Himawari Imager data from JMA, process and generate.
Budget Prep Budget Prep Dates Budgets will be released mid-May Budgets will be due to the Budget Office on June 18 th Budget will be finalized and.
SMALL BUSINESS INNOVATION RESEARCH PROGRAM NATIONAL CONFERENCE – WASHINGTON, DC - JUNE 15-17, 2015.
Access to ITU information / documents KEY CONCEPTS.
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
8 th Annual Managers’ and Law Enforcement Seminar IFTA Funds Netting Information.
GOES-8 to GOES-12 Transition Direct Readout Conference Cindy Hampton NESDIS/Office of Satellite Operations.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers  DCS Help Desk at or 7451 – 24 Hours/ 7 Days a Week  Al McMath at (757)
EMPLOYEES COVERED BY THE YSU/ACE AGREEMENT Early Retirement Incentive Program 2011.
Robin Pfister (GOES-R Ground Segment Deputy Project Manager)
L ow R ate I nformation T ransmission Product Suite Satellite Direct Readout Conference for the Americas in Miami, Florida December 9-13, Charles.
Coordination Group for Meteorological Satellites - CGMS NOAA Response to Action Presented to CGMS-41 plenary session.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Tuesday, October 06, 2015 Santos Rodriguez NWS EMWIN HRIT/EMWIN.
1 DCPR Power Ranges Proposed for CS v.2.0 DCS Manufacturers Meeting June 13, 2007 Peter Woolner Noblis
Upcoming Frequency Topics: Future GOES-R Concerns
Gene Legg Office of Satellite Data Processing and Distribution Asia Pacific Satellite Data Exchange and Utilization Meeting Honolulu, HI, September 20-22,
Kay Metcalf NOAA GOES DCS Program Manager Office of Satellite Data Processing and Distribution NOAA’s Satellite and Information Service GOES DCS: NOAA.
NOAA Satellite Proving Ground/User Readiness Meeting
A Proposal to Update LRIT to Provide Reliable Rebroadcast Tool for GOES DCS Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 12,
Breakout Session Topic: Atmosphere A and B 1.During the GOES-R era, NOAA/NESDIS hopes to move away from system “stovepipes” and into the realm of integrated.
1 DCPRS CERTIFICATION STANDARD STATUS DCS MANUFACTURERS MEETING MAY 18, 2006 Peter Woolner Mitretek Systems
2 DCS MANAGEMENT ACTIVITIES UPDATES ON ALL OUR ONGOING PROJECTS OTHER INFORMATION HELPFUL TO USERS ALL ITEMS MAY BE CONSIDERED WORKS IN PROGRESS QUESTIONS.
NOAAPort Satellite Broadcast Network Scott Christensen NOAA NWS Office of Science and Technology 2011 Satellite Direct Readout Conference, Miami FL April.
10-Dec-2012-cesg-1 SLS AREA REPORT SLS-OPT: Optical Communications Working Group (1 of 10) StatusComment ProgressGood Progress overall, especially on the.
3/30/04 16:14 1 Lessons Learned CERES Data Management Presented to GIST 21 “If the 3 laws of climate are calibrate, calibrate, calibrate, then the 3 laws.
The GOES-10 Overview UW-Madison Tim Schmit and Gary Wade Research Satellite Meteorologist NOAA/NESDIS/ORA(STAR) Advanced Satellite Products Branch (ASPB)
1 THE GOES N GENERATION SATELLTES April 27, 2004 Peter Woolner, Mitretek Systems.
Options for Data Distribution in the GOES-R Series GOES User Conference SESSION 5 Peter Woolner / Mitretek.
March 15, NWSTG Critical Infrastructure Update Fred Branski Telecommunication Operations Center February 2, 2006 NOAA’s National Weather Service.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 The GOES-14 Science Test Timothy Schmit (GOVERNMENT PRINCIPAL INVESTIGATOR)
10-Dec-2012-cesg-1 SLS AREA REPORT SLS-OPT: Optical Communications Working Group (1 of 6) StatusComment ProgressGood Progress overall, especially on the.
DCPR TRANSITION FROM GOES I/M TO GOES N/P: A UNIQUE OPPORTUNITY FOR POWER REDUCTION DCS MANUFACTURERS MEETING NOVEMBER 9, 2006 Peter Woolner Mitretek Systems.
GOES Program October 1, 2002 Steven P. Kirkner GOES Program Manager, NOAA/NESDIS.
Geostationary Operational Environmental Satellite (GOES) User’s Conference Current Status of the NOAA GOES Direct Services Paul Seymour – Broadcast Services.
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) MAY 19, 2009.
SMALL BUSINESS INNOVATION RESEARCH PROGRAM SBIR ROAD TOUR 2015 – VINCE GARCIA/PETER ROOHR.
NPOESS Transmission Frequency Issues Satellite Direct Readout Conference for the Americas 11 December 02 David F. McGinnis.
1 Emergency Managers Weather Information Network in the GOES-N Era: a Status Report WMO ISS September 2002.
Summary of Virtual Partners Meetings on EMWIN and Bullet Format Products NWS Partners Meeting June 22, 2010 Kevin J. Schrab, NWS/OCWWS.
DCP Command Status Oct DCP Command Update Phase 2 SBIR completed in June Successful Tests conducted on both GOES East and GOES 14 Satellites.
Low - Rate Information Transmission (LRIT) Downlink and Reception Satellite Direct Readout Conference for the Americas Frank Eng, Computer Sciences Corp.
1 Emergency Managers Weather Information Network in the GOES-N Era: a Status Report Satellite Direct Readout Conference for the Americas Miami, Florida.
An Overview of Other Ongoing DWR Programs. Other Programs Turf and Toilet Rebates Model Water Efficient Landscape Ordinance Leak Detection Desalination.
NOAAPort Expansion Philip Cragg NWS/Systems Engineering Center
GOES Program Review Satellite Direct Readout Conference for the Americas Miami, Florida December 9, 2002 Gerald Dittberner Advanced Systems Planning.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
Jakub Slovák Permanent Mission of the Slovak Republic in Geneva/ Copyright Unit Media, Audiovisual and Copyright Department Ministry of Culture of the.
1 NWS Expectations Satellite Data CONOPS Mike Johnson.
GOES-R Product Distribution Logistics Before and After Handover Kathryn Miretzky GOES-R User Services Coordinator Product Readiness and Operations (PRO)
Liu Jian and Xian Dian National Satellite Meteorological Center, CMA NAEDEX/APSDEU ,Montreal, Canada FengYun satellites & data.
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) DECEMBER 5, 2008.
PCE Program Debrief Jim Eggemeyer, Director, Office of Sustainability Shawn Marshall, LEAN Energy US March 24, 2016.
FIXED SATELLITE SERVICE and UAS (22 September 2010)
Satellite Information Flow
Update on User service activities
5G - IMT-2020 Technology.
GOES DCS Customer Interaction/Access Training
E-Laws Journey ( June 13, 2016 Who’s already seen this?
2016 AES – Draft Commission Regulation implementing Regulation (EC) No 452/2008 Agenda item 2.3 DSS Meeting 3-4 April 2014.
Inmarsat Position on WRC-19 Agenda Item 9.1 Issue 9.1.1
Presentation transcript:

1 THE EMWIN TRANSITION April 27, 2004 Angelo Wade, NESDIS Ground Systems

2 TOPICS BACKGROUND TRANSITION CONCEPT ACCOMPLISHMENTS

3 BACKGROUND NOAA had to comply with ITU Regulations –Power Flux Density –Spurious emissions GOES N/O/P satellite design includes new EMWIN requirements –Reduced EIRP from 51 dBmi to 44.8 dBmi –Separate transponder (new freq = MHz) –Data Rate = 9.6 kbps –Bandwidth = 50kHz –Modulation = BPSK

4 BACKGROUND (CONT.) Transition Plan written as cooperative agreement between NESDIS and NWS principals to transition users from old to new EMWIN –NESDIS serves as technical lead developing EMWIN hardware/software –NWS serves as Program lead establishing EMWIN requirements Draft Transition Plans have been created and revised frequently since 1999 to coincide with development changes

5 TRANSITION CONCEPT Develop and test EMWIN-N prototype receiver as proof of concept Release of the prototype and development information to prospective vendors Broadcast GOES N-type (EMWIN-N) data stream through GOES-11 (stored) Broadcast EMWIN-N data stream through the GOES-N satellite during initial checkout period “ The Transition Concept is based on the expectation that industry, using NOAA-provided technical information, will produce commercially available receiver systems in a timely manner for the user community.”

6 TRANSITION CONCEPT When to expect change in broadcast? –The current EMWIN broadcast (EMWIN-I) will most likely be available to users until 2011 if there are no catastrophic failures of major satellite subsystems or demand for newer science Change in broadcast service could occur as early as June 2005 or as late as Jan 2011 (fuel completely exhausted). –GOES-11 (currently stored on-orbit) and 12 are expected to have fuel until January and July 2011, respectively –GOES 8 an 9 are at the end of life EMWIN-I long term operations no longer feasible –GOES-10 is projected to run out of fuel mid 2005 and be replaced by GOES-11 approx. January 2006.

7 TRANSITION CONCEPT GOES-N call-up scenarios from on-orbit storage –Critical Factors Satellite failure (major subsystems) NWS request new satellite –Improvement in science (e.g., better image resolution) –Better performance (e.g., precise pointing) EMWIN-N scenarios –Typical Notification of service change Users can expect 2.5 months to prepare for new service –Satellite storage to operations ~ 2.5 months based on GOES-12 replacement of GOES-8 (1 deg/day)

8 TRANSITION CONCEPT Enough EMWIN-I and N overlap for users to prepare

9 TRANSITION CONCEPT Planned replacement of older satellites –GOES-11 (stored) will replace GOES-10 (west) –GOES-N (not yet launched) replaces GOES-12 (east) Testing or changes to satellite operational conditions may require future Plan revisions

10 ACCOMPLISHMENTS Plan signed December 17, 2003 and posted on NWS website –Subject to change as requirements evolve EMWIN-N publications released to public Receiver specifications Satellite downlink specifications Receiver User Manual and DLLs EMWIN-N transmitted through GOES-9 satellite and received successfully –Characterized (preliminary) performance of EMWIN-N system (uplink and downlink)