Christopher Knotts, P.E. Public Works & Water Resources Association of Levee Boards of Louisiana Annual Meeting December 3, 2015.

Slides:



Advertisements
Similar presentations
State Aid Programs An Introduction to: Local Bridge Replacement Program Local Road Improvement.
Advertisements

State Aid Programs Legislative Issues - Bonding Local Bridge Replacement Program Local Road Improvement Township Sign Replacement Program.
Levee Is Not A Four Letter Word…but Levee Is Not a Four Letter Word, But… Natural.
Louisiana Safe Routes To School Program
Dam Removal in Rhode Island: Present and Future David Chopy, DEM July 16, 2009.
CPRA Board Meeting, Baton Rouge, LA May 15, 2013 Coastal Protection and Restoration Authority.
Watershed Dams in Georgia 1. –357 Total –195 High Hazard (NRCS) –NRCS constructed – owned by local sponsors –Most built between 1950s-1970s for flood.
DOTD Red River Valley Assoc Louisiana Levee Meeting Larry Ardoin DOTD Division of Public Works.
Preparing for the Rainy Season SFWMD Operations & Actions.
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
DEPARTMENT OF TRANSPORTATION. Mission Statement Plan, Design, Construct, Operate and Maintain the roadway system under the jurisdiction of Lee County.
Ports and Waterways: A State DOT Perspective Secretary Sherri H. LeBas, P.E. April 29, 2015.
Welcome Rob Rash CEO/Chief Engineer St
Coastal Protection and Restoration Authority Presentation to Coastal Financing Authority July 30, 2008.
Gwinnett County’s Post Development Stormwater Management Program
Fiscal Year 2013 Annual Plan BRIEFING TO: COASTAL PROTECTION AND RESTORATION AUTHORITY Baton Rouge, LA January 18, 2012.
LOUISIANA FLOOD PROTECTION DESIGN GUIDELINES Date: April 16, 2014.
Tom Blaine, P.E State Engineer May 11, 2015 Watershed and Dam Owners Coalition WATER IS POWER.
Federal Funding Process LYNDA HOFFMAN, WATERWAYS DIVISION MANAGER.
. Efforts to Reduce Crashes on County Roads in Iowa.
Department of Natural Resources and Conservation, Water Resources Division State Water Projects Bureau Kevin B. Smith, P.E., Chief
Watershed Dams Maintenance Renovation/Rehabilitation.
April, 2008 Office of Coastal Restoration & Management PROJECT UPDATE Office of Coastal Restoration & Management PROJECT UPDATE.
NRCS Watershed Rehabilitation
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
DRAFT CORPS OF ENGINEERS CONTRACTS: Louisiana Coastal Area, Mississippi River Gulf Outlet, and Lake Pontchartrain & Vicinity Presented to the Coastal Protection.
Virginia Department of Conservation & Recreation Virginia Dam Safety & Floodplain Programs William G. Browning, Director Dam Safety & Floodplain Management.
NRCS NRCS Watershed Program In Texas. Water Resources AuthoritiesAuthorities Project ActivitiesProject Activities RehabilitationRehabilitation FundingFunding.
Hydraulic and Hydrologic Considerations in Planning FLOOD RISK MANAGEMENT CLASS EXERCISE Chuck Shadie Mississippi Valley Division.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Exeter 8/12/00.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
Engineering History and 2008 Operation of the Bonnet Carré Spillway: A Controlled Levee Crevasse on the Lower Mississippi River Christopher G. Brantley,
Coastal Protection and Restoration Authority (CPRA) Office of Coastal Protection and Restoration Lands, easements, rights-of-way and relocations (LERRD’s)
Developing a National Levee Safety Program Mike Stankiewicz - NCLS Arizona Floodplain Management Association November 3, Update on the National.
World Association for Waterborne Transport Infrastructure (PIANC) and the International Environmental Commission Technical Seminar October 28, 2009 Westin.
Louisiana Department of Transportation and Development 2012 Traffic Engineers Meeting Secretary Sherri H. LeBas, P.E.
House Concurrent Resolution 171 (2010) Levee District Oversight Planning Study Report to the Senate and House Committees on Transportation, Highways, and.
Lake County Watershed Management Board Funding Program Mike Prusila, CFM, Watershed Planner.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
One Team: Relevant, Ready, Responsive, Reliable US Army Corps of Engineers 1 Coastal Protection and Restoration Advisory Committee 3 April 2006 D
Louisiana Local Road Safety Program
05C112011B Template Master – Update Tracking Number and Date Information Here Update tracking number and date on this slide Template Master – Update Tracking.
Condition Assessment Of The Hurricane Protection System Larry B. Ardoin, P.E. DIRECTOR, HURRICANE PROTECTION OPERATIONS.
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Bridge Maintenance and Inspection Responsibilities Technical.
Melinda Terry, Executive Director CA Central Valley Flood Control Association 1.
US Army Corps of Engineers BUILDING STRONG ® Boise River Feasibility Study Ellen Berggren, PMP Outreach Coordinator/ Project Manager Idaho Governor’s Roadless.
Outlook for the Future American Council of Engineering Companies of Louisiana DOTD Secretary Sherri H. LeBas, P.E. November 12, 2015.
Fiscal Year 2009 Annual Plan: Ecosystem Restoration and Hurricane Protection in Coastal Louisiana Draft.
A LTERNATIVES A NALYSES FOR F LOOD M ITIGATION O PTIONS 2012 Flood Risk Management and Silver Jackets Workshop Chad Berginnis CFM, ASFPM Executive Director.
BUILDING STRONG ® Levee Safety Program  Levee Safety Program Implementation Guidance provided by HQUSACE in 2007 (Post Hurricane Katrina) ► Designate.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
MS Dam Safety Program Dusty Myers, P.E. Chief, Dam Safety Division.
NID Data Model based on HUC CE394K.3 Term Project by Seungwon Won December 7, 2000.
House Transportation Policy and Finance April 13, 2016 Tracy Hatch Deputy Commissioner Chief Financial Officer / Chief Operating Officer.
BUILDING STRONG SM Revitalizing and Expanding Partnerships Charles E. Shadie, P.E. Senior Hydraulic Engineer Mississippi Valley Division U.S. Army Corps.
Overview of USDA - PL-566 Small Watershed Program - EWP Program Mahoning County FRM Informational Meeting August 16, 2016 Natural Resources Conservation.
Shawn D. Wilson, Ph.D. Secretary
Why do people try to manage rivers?.
Tennessee Safe Dams Program
Comite River Diversion Project Status Update November 7, 2018 Bobby Duplantier, USACE Patrick Landry, DOTD.
Regional flooding frequency analysis
Fab-Five Projects New Orleans FY19-FY23
Nebraska Water Infrastructure Funding and Financing Programs
Brooke McGregor, Program Liaison, Watermaster Section
Sacramento Environmental Commission January 2019.
Urban Water Institute 24th Annual Conference Oroville Dam
Presentation transcript:

Christopher Knotts, P.E. Public Works & Water Resources Association of Levee Boards of Louisiana Annual Meeting December 3, 2015

2 Departmental Overview – Responsibilities – Funding – Accomplishments Public Works & Water Resources – Statewide Flood Control Program – Levee Safety Program (non-coastal districts) – Ongoing Federal Projects – Dam Safety Program

Improving Roadway Safety S afety Initiatives

DOTD Safety Initiatives Public Safety is DOTD’s #1 priority Overall reduction in fatal crashes since 2007 Recent initiatives include: »Destination Zero Deaths »Cable Barriers »Roundabouts »Enhanced Mile Markers »ITS Traffic Cameras and Signs

Public Works & Water Resources - Statewide Flood Control Program - Levee Safety Program (non-coastal districts) - Ongoing Federal Projects - Dam Safety Program

Overview Primary goal to reduce existing flood damages by considering both structural and non-structural solutions Funded by Transportation Trust Fund $8.9M funding last two years ($9.9M average in prior years) Applicants can be: »Parish Governments » Municipal Governments »Levee Boards »Drainage Districts Statewide Flood Control Program 11

Funding 90% of the construction cost for non-federal projects 70% of the local sponsor’s non-federal share for federal projects Local sponsor pays for engineering, R/W, utilities, etc. Eligibility Equitable distribution of funds statewide » (55% invested in rural areas, 45% invested in urban areas) All levels of local government from the largest parishes and cities down to the smallest towns and villages can successfully compete. 12 Statewide Flood Control Program

Inspections Assist Levee Districts with the Quarterly and Semi-Annual Inspections Provide Semi-Annual Inspection Reports Provide Recommendations/Options for Corrective Actions Inventory/Mapping Inventory Levee Assets Develop GIS Maps 13 Levee Safety Program

Permits Review permit applications Provide Letters of Response to appropriate Levee District »Non-coastal (DOTD) »Coastal (CPRA) Ensure compliance with engineering standards Engineering Support Set-back Design Drainage Design Cost Estimates 14 Levee Safety Program

15

Mississippi River Levee Raising Project Purpose – Flood Prevention 200 miles of mainline Miss. River levee construction in NE LA Raising 3 to 4 feet above project flow line Responsibilities: Fifth Louisiana Levee District & DOTD: LERRDs (Right-of-Way) USACE-Vicksburg District: Design and Construction Expenditures to date: Federal: $127 million Non-Federal Sponsor: $9.8 million

Purpose – Flood Prevention/Reduction Comite River Basin Lower Amite River Basin Federal Sponsor: USACE – New Orleans District Design Construction Non-Federal Sponsors: DOTD: Lands, Easements, Rights of Way, Relocations & Disposals (LERRDs) Amite River Basin Commission: Floodplain Management East Baton Rouge City-Parish DPW: Operations and Maintenance Comite River Diversion Canal

Features 12 miles of channel 4 drop structures Diversion structure Stage control structure (Lilly Bayou) Bridges at 4 highways (U.S. 61, LA 964, LA 19, and LA 67) 2 railroad bridges (CN and KCS) Current Cost Estimate $ 199 million Expenditures to Date Federal: $ 74.4 million Non-Federal: $22.1 million

Dam Safety Program Created by Act 733 of the 1981 Regular Legislative Session Responsibilities are to: »Define & enforce Minimum Standards »Maintain the State Dam Safety Inventory »Ensure that all dams are inspected per guidelines

Dam Safety Program Applicable to all dams or impoundment structures…any artificial barrier which will impound or divert water or any liquid and is: »25+ ft. height »Has a maximum storage of 15 acre-feet or greater OR »Min. 6 ft. height »Has a maximum storage of 50 acre-feet or greater

Dam Safety Program Define and enforce minimum standards for: Design Construction Modification Operation & Maintenance Ivan Lake Dam – Bossier Parish

Dam Safety Program Operation & Maintenance Acoustic Surveys Surface Inspections Underwater Inspections Operation of gates Emergency Action Plans Grand Bayou Reservoir – Red River Parish

Dam Safety Inventory 516 Regulated Dams (November, 2014) 40 High Impact 50 Significant Impact 426 Low Impact ) Vernon Lake Dam – Vernon Parish

Consequences Of Dam Failure U.S. dam failures in the last 50 years »400+ fatalities »Billions in property damage Most of the 20 State maintained dams are old (50+ years) and a number are in critical need of repair. » Turkey Creek Dam (Franklin Parish) »Bundick Lake (Beauregard Parish) »Iatt Lake Dam (Bossier Parish) South Carolina dam failures (October, 2015 ) » 36 Dams failures, 7 Class 1 dams and 20 Class 2 dams and an additional 167 dams were damaged. »After assessments were completed 75 emergency repair orders and 24 notices of violations were issued to non responsive owners.

Christopher P. Knotts, P.E. Chief, Public Works & Water Resources P. O. Box Baton Rouge, LA Questions?